Professional Documents
Culture Documents
Fpage Checkiyangora
Fpage Checkiyangora
DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD FROM CHECKIYANGOORA TO BABA SALIAH
PACKAGE NO:JK13BLOCK : LAR STAGE:2ND PROJECT COST: MAINTENANCE COST: TOTAL COST:
LENGTH:2.7KM
DISTT : GANDERBAL PHASE:VIII 155.21 LAC 11.64LAC 166.85LAC