BOP Expert Opinions

Opinion Upper Annular functioned Variable Bore Rams functioned Blind Shear Rams functioned Blind Shear Rams could have sheared centered pipe Pipe was off-center and prevented Blind Shear Rams from fully shearing and sealing Flow lifted the pipe at AMF time Tensile failure and erosion caused pipe to separate above upper annular Pipe separated on 4/20 Flow buckled the pipe at AMF time Rig Drift could not have caused pipe to be off-center at Autoshear time Traveling Block could not have caused pipe to be off-center at Autoshear time Experience Prior experience in oil and gas industry? Prior experience with BOPs? Any BOP design patents? Transocean Cameron Halliburton PSC BP US

x x x x

x x x

Source: TREX-022748; 050370; 007755; 022735; 022716; 008156; 08157; 20511; 40008; 22737; 22693; Depositions of G. Childs, G. Stevick, D. ODonnel, C. Knight, G. Perkin, E. Shanks, and R. Davis.

D6703