Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

BAHAGIAN : 5.

0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Excavation Plant

Backhoe (Wheel) up to 0.4 m3

hour

30.00 40.00

33.88

30.00 40.00

35.00

35.00 37.50

36.00

30.00 37.50

35.00

25.00 60.00

37.00

25.00 60.00

35.38

Ditto over 0.4 m3

hour

40.00

31.25

30.00 60.00

43.00

30.00 60.00

38.08

Ditto over 1.0 m3 up to and including 2.0 m3.

hour

50.00

50.00

Ditto over 2.0 m3 up to and including 4.0 m3.

hour

55.00

55.00

Backhoe Excavator ( Case 580 )

hour

30.00 37.50

34.17

35.00 65.00

47.60

31.00 50.00

40.50

30.00 65.00

40.76

Dragline RB 19

hour

40.00

25.00 35.00

30.00

30.00 56.25

42.32

71.00

25.00 71.00

45.83

Ditto RB 22

hour

43.75 50.00

46.88

30.00 40.00

35.00

35.00 70.00

50.22

81.00

30.00 81.00

53.28

Ditto RB 24

hour

45.00 75.00

62.00

45.00 75.00

62.00

Ditto RB 30

hour

80.00

35.00 50.00

42.50

75.00

35.00 80.00

65.83

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Excavation Plant ( cont'd )

10 Dragline RB 38

hour

80.00 150.00

100.00

80.00 150.00

100.00

11 Ditto RB 61

hour

190.00

190.00

12 Ditto RB 71

hour

190.00

190.00

13 Dragline Excavator per 0.38 m3 (1/2 cu. Yd. )

hour

45.00 70.00

57.50

45.00 70.00

57.50

14 Ditto per 0.57m3 ( 3/4 cu. Yd.)

hour

60.00

55.00

45.00 80.00

61.00

45.00 80.00

58.67

15 Ditto per 2.29 m3 ( 3 cu. Yd. )

hour

30.00 75.00

46.67

30.00 75.00

46.67

16 Hydraulic Excavator Track Type up to 1 m3

hour

43.75 80.00

63.60

43.75 80.00

63.60

17 Ditto over 1 m3.

hour

50.00 90.00

67.50

50.00 90.00

67.50

18 Excavator - hydraulic operated up to 0.5m3

hour

45.00 56.00

51.20

32.00 50.00

41.00

35.00 62.00

48.94

63.00

63.00

31.25 62.50

46.88

50.00 80.00

64.17

31.25 80.00

52.53

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Excavation Plant ( cont'd )

19 Excavator - hydraulic operated up to 1.0 m3

hour

50.00 65.00

58.25

35.00 55.00

45.00

55.00 60.00

57.08

50.00 56.25

53.13

35.00 65.00

53.37

20 Ditto over 1.0 m3 up to 1.5 m3

hour

65.00 75.00

70.00

44.00 60.00

52.00

64.00

44.00 75.00

62.00

21 Ditto over 1.5 m3.

hour

80.00

80.00

22 Excavator CAT 300

hour

56.25 90.00

66.56

56.25 90.00

66.56

23 Excavator 0.25 m3

hour

43.75

50.00

31.25 62.50

44.17

70.00

62.50

55.00 80.00

65.00

31.25 80.00

55.90

24 Face shovel / dragline / skimmer and backactors up to


and including 0.5 m3

hour

39.00

39.00

25 Ditto over 0.5 m3 up to and including 1.0 m3

hour

55.00

35.00 60.00

48.33

62.50

31.00 68.75

48.22

31.00 68.75

53.51

26 Ditto over 1.0 m3 up to and including 2.0 m3

hour

70.00 75.00

72.50

70.00

81.25

81.25

50.00 81.25

67.25

50.00 81.25

74.45

27 Ditto over 2.0 m3 up to and including 4.0 m3

hour

80.00

80.00 90.00

85.00

112.50

80.00 112.50

92.50

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Excavation Plant ( cont'd )

28 Face shovel / dragline / skimmer and backactors over 4.0 m3.

hour

100.00

100.00

29 Excavator, face, shovel or dragline including


use of crane up to and including 1.0 m3.

hour

35.00 85.00

52.88

32.00

31.25 75.00

49.38

50.00

43.75 80.00

62.48

31.25 85.00

49.35

30 Ditto over 1.0 m3 up to and including 2.0 m3

hour

35.00 75.00

57.63

44.00

52.50 81.25

62.33

70.00

50.00 90

71.63

35.00 90.00

61.12

31 Ditto over 2.0 m3.

hour

32.00 60.00

46.00

32.00 60.00

46.00

32 Trench Digger Track Type up to 60 hp.

hour

32.00 60.00

46.00

32.00 60.00

46.00

33 Ditto 90 hp.

hour

37.00 80.00

58.5

37.00 80.00

58.50

34 Shovel

hour

35.00

60.00 65.00

61.25

20.00 55.00

37.50

20.00 65.00

44.58

35 Grader up to 3.5 m blade.

hour

25.00 55.00

44.77

57.00

31.25 100.00

56.64

60.00

50.00 81.25

63.47

25.00 100.00

56.38

36 Ditto over 3.5 m blade

hour

63.00

37.50 125.00

71.19

50.00

53.13 90.00

69.39

37.50 125.00

63.40

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Excavation Plant ( cont'd )

37 Grader 12E or equivalent.

hour

60.00 80.00

67.01

47.00

47.00 80.00

57.01

38 Ditto 14E or equivalent.

hour

75.00 90.00

79.00

75.00 90.00

79.00

39 Grader (self propelled), 90 - 140 drawbar.

hour

47.50

47.50

40 Grader CAT 112F or equivalent.

hour

30.00 70.00

55.00

30.00 70.00

55.00

41 Grader up to and Including 60 Kw.

hour

40.00

40.00

75.00

40.00 75.00

51.67

43 Ditto over 60 Kw.

hour

50.00

60.00

75.00

50.00 75.00

61.67

44 Scraper over 280 hp.

hour

40.75

40.75

45 Scraper self loading 705 m3

hour

100.00

100.00

46 Ditto 11.5 m3

hour

120.00

120.00

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN C
JULAT
PURATA
(RM)
(RM)

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Compressed Air Equipment

47 Compressor, portable with breakers, rock drills, air lines,


lubricator and steel up to and including 3 m3/min.

hour

30.00 50.00

43.37

38

20.00 60.00

30.16

31.00 70.00

50.50

25.00

60.00 65.00

62.5

20.00 70.00

41.59

48 Ditto over 3 m3/min, up to and including 5 m3/min.

hour

32.00 45.00

38.00

25.00 60.00

36.88

40.00 48.00

44.00

37.50

18.00 39.00

25.38

18.00 60.00

36.35

49 Ditto over 5 m3/min, up to and including 10 m3/min.

hour

45.00 57.00

49.25

100.00

40.00 75.00

63.00

60.00 85.00

72.50

20.00 80.00

37.71

20.00 100.00

64.49

50 Ditto over 10 m3/min, up to and including 15 m3/min.

hour

50.00 65.00

58.33

67.00 90.00

78.50

20.00 50.00

26.16

20.00 90.00

54.33

51 Ditto over 15 m3/min

hour

120.00

22.00 90.00

35.64

22.00 120.00

77.82

52 Single tool compressor up to 4.3 m3/min.

hour

25.00 50.00

38.75

25.00 50.00

38.75

53 Two tools compressor up to and including 6 m3/min.

hour

30.00 60.00

45.00

30.00 60.00

45.00

54 Three tools compressor up to and including 9 m3/min.

hour

35.00 80.00

56.00

35.00 80.00

56.00

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Compressed Air Equipment ( cont'd )

55 Mobile compressor including tools and hoses up to 2 m3/min.

hour

60.00

60.00

56 Pumps, portable including hoses, strainer, etc. - 50 mm delivery.

hour

9.00 20.00

15.88

12.00

10.00 35.00

18.94

10.00 30.00

19.67

10.00

10.00 50.00

15.94

9.00 50.00

15.41

57 Ditto, 75 mm.

hour

15.00

20.00

15.00 20.00

7.00

58 Ditto, 100 mm

hour

12.00 30.00

20.57

12.00 15.00

14.00

12.00 45.00

27.08

20.00

15.00 40.00

25.82

12.00 45.00

21.49

59 Ditto, 150 mm.

hour

20.00 35.00

27.33

15.00 20.00

17.33

12.00 55.00

35.56

25.00 40.00

32.50

10.00 80.00

36.56

10.00 80.00

29.86

60 Ditto, over 150 mm.

hour

30.00 43.75

34.58

17.00 25.00

20.67

15.00 75.00

43.12

30.00 50.00

40.00

20.00

30.00 90.00

63.00

15.00 90.00

36.90

61 Ditto over 200 mm.

hour

36.00

36.00

Pumping Plant

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Pumping Plant ( cont'd )

62 Power operated pumps self primary centrifugal 75 mm ( 3" )

hour

15.00 25.00

21.25

12.50

12.50 25.00

16.88

63 Ditto 150 mm ( 6" )

hour

20.00

22.50 35.00

28.13

18.00

11.00 62.00

31.00

11.00 62.00

24.28

64 Power operated pumps - submersible electric 75 mm ( 3" )

hour

18.75 60.00

30.75

18.75 60.00

30.75

65 Ditto 150 mm ( 6" )

hour

25.00 75.00

39.17

35.00

25.00 75.00

37.09

66 Grout Pump

hour

35.00

35.00

67 Agriculture ( Farm ) Tractor

hour

23.00 31.25

28.08

30 .00 50.00

40.00

25.00 62.5

34.71

25.00 60.00

40.25

23.00 62.50

35.76

68 Tractor with bull or angle dozer up to 60 hp.

hour

30.00 65.00

53.75

33.00

30.00 65.00

43.38

Tractor

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Tractor ( cont'd )

69 Tractor with bull or angle dozer over 60 hp. Up to 90 hp.

hour

27.50 40.00

33.75

40.00 50.00

45.00

27.50 50.00

39.38

70 Ditto over 90 hp.

hour

35.00

60.00

35.00 60.00

47.50

71 Ditto over 120 hp.

hour

30.00

30.00

72 Ditto over 150 hp.

hour

45.00 65.00

55.00

45.00 65.00

55.00

73 Ditto over 180 hp.

hour

60.00 95.00

72.14

60.00 95.00

72.14

74 Ditto over 220 hp.

hour

65.00 125.00

95.00

65.00 125.0

95.00

75 Tractor, backpusher.

hour

20.00

30.00

30.00

50.00

20.00 50.00

32.50

76 Tractor, Pneumatic Tyre with scraper 112 hp / 83 kw.

hour

37.00 80.0

58.50

37.00 80.00

58.50

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

KETERANGAN KERJA

UNIT

77 Tractor, Pneumatic Tyre with scraper 250 hp.

hour

80.00

80.00

78 Tractor with low ground pressure arrangement including


bull or angle dozer or ripper up to and including 70 kw.

hour

40.00 75.00

57.50

32.00 60.00

54.00

32.00 75.00

55.75

79 Ditto over 70 kw up to 120 kw

hour

45.00 85.00

65.00

31.50 100.00

53.40

31.50 100.00

59.20

80 Tractor track type including bull or angle dozer or ripper


up to and including 70 kw.

hour

50.00

20.00 50.00

34.20

20.00 50.00

42.10

81 Ditto over 70 kw.

hour

60.00

22.50 50.00

38.70

22.50 60.00

49.35

82 Tractor bull or angle dozer up to and including 40 kw ( Drawbar )

hour

35.00

30.00 65.00

47.50

62.50

30.00 65.00

48.33

83 Ditto over 40 kw up to and including 70 kw.

hour

35.00 45.00

40.00

40.00

68.75

25.00 30.00

27.50

25.00 68.75

44.06

84 Ditto over 70 kw up to and including 120 kw.

hour

46.00 55.00

47.50

60.00

68.75

45.00

45.00

45.00 68.75

55.31

Tractor ( cont'd )

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

KETERANGAN KERJA

UNIT

85 Ditto over 120 kw up to and including 160 kw.

hour

65.00

60.00 65.00

61.67

81.25

60.00 81.25

69.31

86 Ditto over 160 kw up to and including 200 kw.

hour

75.00

90.00 95.00

91.67

81.25

75.00 95.00

82.64

87 Ditto over 200 kw up to and including 250

hour

120.00 125.00

121.67

120.00 125.00

121.67

88 Tractor, bull or angle dozer with shovel and generating set


1.1 m3.

hour

20.00 80.00

42.00

20.00 80.00

42.00

89 Bulldozer D4

hour

31.25 40.00

35.63

37.00 100.00

68.50

72.50

31.25 100.00

58.88

90 Ditto , 250 hp.

hour

68.75 81.25

75.00

68.75 81.25

75.00

91 Ditto D6

hour

50.00

40.00 120.00

80.00

50.00 80.00

63.95

40.00 120.00

64.65

Tractor ( cont'd )

Bulldozer

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Bulldozer ( cont'd )

92 Bulldozer D8

hour

80.00

44.00 150.00

97.00

44.00 150.00

88.50

93 Bulldozer CAT, 3 m3

hour

37.50 63.00

53.50

37.50 63.00

53.50

94 Ditto 4.2 m3.

hour

78.00

78.00

95 25 ft. / 8 m. Pile Frame, boiler,winch and 1 ton drop hammer or


equivalent

hour

25.00 75.00

46.86

55.00 63.00

59.00

25.00 75.00

53.68

50.00

50.00 120.00

98.25

25.00 120.00

61.56

96 60 ft. / 20 m. ditto.

hour

50.00 80.00

61.88

100.00

56.25 125.00

88.94

70.00

62.50 150.00

122.50

50.00 150.00

88.66

97 Bakau Piling Frame

hour

43.75 50.00

47.92

55.00

43.75 55.00

51.46

98 5 ton diesel hammer.

hour

93.75

93.75

Piling Plant

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Piling Plant (cont'd )

96 Pile Driver - Gravity Hammer

hour

45.00 75.00

53.89

45.00 75.00

53.89

97 Three ton Vibro - Hammer including generator.

hour

43.75

43.75

98 Pneumatic Jackhammer

hour

15.00

10.00 50.00

25.66

43.75

20.33

99 Hydraulic Vibro Hammer - 5 ton

hour

65.00

65.00

100 Ditto 7 ton

hour

100.00

100.00

101 Concrete mixer - 0.6 m3 output.

hour

8.00 30.00

19.60

5.00 30.00

17.00

5.00 30.00

18.30

102 Ditto 1.0 m3

hour

10.00 40.00

25.06

25.00

12.5 56.25

29.13

25.00

10.00 60.00

38.03

10.00 60.00

28.44

Concrete Mixing Plant

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Concrete Mixing Plant (cont'd )

103 Central Concrete Mixing Plant complete including fuel and


all consumable spares.

hour

20.00 125.00

65.83

130.00

80.00 120.00

95.00

40.00

40.00 80.00

68.75

20.00 130.00

79.92

a) 14/10

hour

12.00 20.00

16.00

27.00 30.00

28.50

12.50 30.00

19.30

23.00 40.00

31.50

15.00 62.50

36.25

15.00 38.00

18.50

12.00 62.50

25.01

b ) 7/5

hour

10.00 18.00

14.00

15.00 20.00

17.50

20.00

20.00

5.00

5.00 20.00

15.30

c) 10/7 ( 0.3 m3/hr. )

hour

10.00 14.00

12.00

25.00 28.00

26.50

15.00 25.00

20.00

30.00

10.00 50.00

26.25

56.25

10.00 56.25

28.50

d) 21/14 ( 2.0 m3/hr. )

hour

15.00

30.00 40.00

35.00

30.00

60.00

15.00 60.00

35.00

e) Five ton

hour

10.00 49.00

27.25

32.00

10.00 49.00

29.63

f) Open Drum 0.5 m3

hour

18.00 40.00

28.50

18.00 40.00

28.50

104 Concrete mixer :

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Concrete Plant

105 Concrete vibrators, immersion type petrol driven or air driven


excluding compressor up to and including 75 mm.

hour

5.00 25.00

16.33

15.00

25.00 50.00

33.37

18.00

18.00 60.00

27.32

5.00 60.00

22.00

106 Ditto over 75 mm.

hour

20.00 40.00

29.50

20.00

35.00 70.00

47.50

25.00

8.00 75.00

32.61

8.00 75.00

30.92

107 Portable Concrete Vibrator up to and including 1 3/4" ( 45 mm )

hour

10.00 12.50

11.25

10.00 12.50

11.25

108 Ditto over 1 3/4" up to and including 2 1/2" ( 64 mm )

hour

13.00

13.00

109 Ditto over 2 1/2" ( 64 mm )

hour

19.00

19.00

110 Ditto 75 mm

hour

10.00 37.50

16.77

10.00 37.50

16.77

111 Ditto over 75 mm

hour

12.50 45.00

24.15

12.50 45.00

24.15

hour

20.00

20.00

30.00

10.00 50.00

19.29

10.00 50.00

22.32

112 Vibrator concrete immersion type ;

a) light
- 40mm

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Concrete Plant ( cont'd )

112 Vibrator, concrete immersion type ; (cont'd)

a) light
- 50 mm

hour

30.00

10.00 50.00

19.29

10.00 50.00

24.65

b) heavy
- 50 mm and above

hour

25.00

45.00

12.00 75.00

27.43

12.00 75.00

32.48

113 Mobile crane up to and including 1 ton

hour

25.00 65.00

42.00

25.00 65.00

42.00

114 Ditto up to 3 ton

hour

30.00

30.00 38.00

34.00

50.00 62.50

56.25

50.00

50.00 81.25

65.63

30.00 81.25

47.18

115 Ditto up to and including 5 ton.

hour

15.00 58.00

39.36

38.00

25.00 70.00

43.98

45.00 60.00

51.67

30.00

31.25 80.00

52.07

15.00 80.00

42.51

116 Crawler crane over 6 ton up to 10 ton.

hour

22.00 65.00

46.06

50.00

37.50 80.00

52.75

60.00

47.50

47.50

35.00 90.00

57.15

22.00 90.00

52.24

Crane

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Crane ( cont'd )

117 Crawler crane over 10 ton up to 20 ton

hour

30.00 70.00

53.28

40.00 63.00

51.00

45.00 100

61.96

80.00

35.00 100.00

65.85

30.00 100.00

62.42

118 Ditto over 20 ton up to 30 ton.

hour

48.00 80.00

60.50

45.00 63.00

54.00

60.00 80.00

67.33

45.00 100.00

68.25

45.00 100.00

62.52

119 Ditto over 30 ton up to 40 ton

hour

55.00 90.00

73.33

50.00 80.00

65.00

75.00 150.00

125.00

81.25

81.25

50.00 150.00

86.15

120 Ditto up to and including 50 ton

hour

65.00 100.00

86.25

60.00 100.00

80.00

90.00 100.00

95.00

54.00 137.00

92.36

54.00 137.00

88.40

121 Ditto, 60 ton.

hour

100.00

100.00

122 Ditto 80 ton.

hour

118.75

118.75

123 Rough terrain crane 20 ton.

hour

62.00

62.00

124 Ditto, 25 ton.

hour

62.00

62.00

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Weiding Equipments

125 Oxy - Acetylene cutting apparatus and gas.

hour

8.00 40.00

23.82

25.00 38.00

33.67

10.00 80.00

29.97

18.75 34.00

27.58

10.00 65.00

30.5

8.00 80.00

29.11

126 Electric, 300 Amp.

hour

12.00 55.00

31.5

30.00 50.00

43.33

10.00 65.00

28.89

18.75 40.00

31.92

18.75 25.00

21.88

12.00 65.00

42.33

12.00 65.00

33.31

127 Welding or cutting gear.

hour

20.00 25.00

21.25

30.00 31.25

30.63

15.00

15.00

15.00 31.25

20.47

128 Pick-up trucks

hour

23.00

23.00

129 Truck, flat bed up to and including 30cwt.

hour

40.00

25.00 70.00

40.57

25.00 70.00

40.29

130 Ditto over 3 ton up to and including 5 ton

hour

40.00

25.00 68.5

40.54

25.00 68.50

40.27

131 Ditto over 5 ton up to 7 ton.

hour

30.00

50.00

35.00 68.75

47.97

30.00 68.75

42.66

Transporting Plant

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Transporting Plant ( cont'd )

132 Water Browser

hour

50.00

75.00

50.00 75.00

62.50

133 Water Tanker self propelled

hour

20.00 40.00

30.00

20.00 40.00

30.00

134 Water truck including spraying equipment up to and including


3200 gallons.

hour

30.00

25.00

50.00 75.00

59.00

25.00 75.00

38.00

135 Lorry tipper up to and including 3 ton

hour

25.00 35.00

31.67

25.00 45.00

35.00

43.75

37.50 50.00

43.75

25.00 50.00

38.54

136 Ditto over 3 ton up to and including 6 ton

hour

25.00 45.00

37.37

40.00

22.50 80.00

39.88

40.00 56.25

48.13

30.00 43.75

36.25

25.00 50.00

38.25

22.50 80.00

39.98

137 Ditto over 6 ton up to and including 10 ton

hour

35.00 70.00

48.11

30.00 50.00

39.00

27.50 90.00

51.94

50.00

37.50 43.75

40.42

20.00 60.00

42.70

27.50 90.00

45.36

138 Ditto over 10 ton

hour

40.00 80.00

56.92

35.00 60.00

48.00

50.00 120.00

67.32

60.00

35.00 80.00

57

35.00 120.00

57.85

139 Ordinary lorry up to and including 1.5 ton.

hour

20.00

35.00

31.25

20.00 35

28.75

140 Ditto up to 3 ton

hour

25.00

12.50 43.75

25.68

35.00 43.75

39.38

12.50 43.75

30.02

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Transporting Plant ( cont'd )

141 Ordinary lorry up to and including 6 ton.

hour

25.00 50.00

34.75

35.00 40.00

37.5

18.75 50.00

32.37

40.00 50.00

45.00

27.50 40.00

32.30

25.00 50.00

36.38

142 Ditto over 6 ton up to and including 10 ton.

hour

37.50 60.00

45.83

40.00 50.00

45.00

40.00 70.00

50.00

31.75 65.00

45.75

31.75 70.00

46.65

143 Concrete dumper up to and including 1 m3.

hour

20.00 65.00

36.25

31.25

20.00 65.00

33.75

144 Dumper, petrol or diesel up to and including 1.5 m3

hour

20.00

35.00

68.75

20.00 68.75

41.25

145 Ditto up to 2 m3.

hour

30.00 60.00

47.50

50.00

20.00 60.00

40.00

40.00

20.00 60.00

44.38

146 Dito over 2 m3 up to 5 m3.

hour

32.50

30.00

60.00

43.00

30.00 60.00

41.38

147 Ditto over 5 m3 up to 10 m3.

hour

35.00

35.00 45.00

40.00

60.00

48.00 65.00

56.42

35.00 65.00

47.86

148 Off-Highway Dump Truck over 6 ton up to 10 ton.

hour

24.00 60.00

33.88

24.00 60.00

33.88

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Transporting Plant ( cont'd )

149 Off-Highway Dump Truck over 10 ton up to 15 ton

hour

36.00 70.00

49.65

36.00 70.00

49.65

150 Ditto over 15 ton up to 25 ton

hour

40.00 65.00

51.88

40.00 65.00

51.88

151 Trucks , dump, 8 cu. Yd. Up to and including 10 cu. Yd.

hour

55.00

30.00 60.00

41.36

30.00 60.00

48.18

152 Ditto 12 cu. Yd. Up to and including 15 cu. Yd.

hour

55.00

55.00

40.00 55.00

47.5

40.00 55.00

52.50

153 Rear Dump truck up to 5 ton.

hour

60.00

60.00

154 Rear Dump truck over 5 ton up to 10 ton.

hour

70.00

70.00

155 Rear Dump truck over 10 ton up to 15 ton.

hour

90.00

90.00

156 Rear Dump truck over 15 ton up to 25 ton.

hour

110.00

110.00

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Transporting Plant ( cont'd )

157 Rear Dump truck over 25 ton

hour

125.00

125.00

158 Three ton Vibro - Hammer including generator.

hour

43.75

43.75

159 Dumper self propelled up to 2.5 m3.

hour

18.75 50.00

36.43

18.75 50.00

36.43

160 Low loader 40 ton

hour

75.00

43.00 150.00

96.50

62.50

55.00 120.00

70.83

43.00 150.00

76.21

161 Wheel Loader up to 2.5 m3

hour

30.00 100.00

63.33

60.00

18.75 75.00

50.94

18.75 100.00

58.09

162 Ditto over 2.5 m3 up to 5 m3.

hour

40.00 120.00

75.00

82.00

31.25 120.00

70.45

31.25 120.00

75.82

163 Front End Wheel Loader up to 1.5 cu. Yd.

hour

30.00 70.00

47.86

30.00 70.00

47.86

164 Ditto up to 3 cu. Yd.

hour

60.00

60.00

165 Ditto over 2 m3 up to 5 m3

hour

90.00

90.00

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Transporting Plant ( cont'd )

166 Front End Wheel Loader over 5 m3.

hour

120.00

120.00

167 Trailer

hour

18.75 43.75

31.25

18.75 43.75

31.25

168 Roller 1.5 ton

hour

31.25

31.25

169 Ditto 3 ton

hour

35.00

35.00

170 Ditto 5 ton

hour

30.00

45.00

68.75

30.00

30.00 68.75

43.44

171 Ditto over 5 ton up to 10 ton

hour

31.25 35.00

33.13

35.00 38.00

36.50

35.00 55.00

42.50

81.25

50.00 62.50

56.25

25.00 80.00

48.08.

25.00 81.25

49.62

172 Ditto over 10 ton

hour

30.00

42.00 45.00

43.50

42.00

31.00 100.00

48.88

30.00 100.00

41.10

Roller

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Roller ( cont'd )

173 Drawn Vibratory Roller 15 ton compaction force

hour

50.00

50.00

40.00 110.00

57.86

40.00 110.00

52.62

174 Vibrating Roller 3 ton.

hour

25.00

60.00

25.00 60.00

42.50

175 Ditto over 5 ton up to and including 7 ton

hour

68.75

68.75

176 Ditto over 10 ton up to 12 ton

hour

50.00

75.00

50.00 75.00

62.50

177 Vibrating Roller self propelled up to 0.5 ton

hour

30.00

30.00

178 Ditto up to 5 ton

hour

37.50

37.50

179 Ditto over 5 ton up to 10 ton

hour

43.75

43.75

180 Ditto over 10 ton up to 15 ton

hour

40.00 100.00

58.28

40.00 100.00

58.28

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Roller ( cont'd )

181 Self Propelled Road Roller less than 6 ton.

hour

43.75 55.00

49.58

43.75 55.00

49.58

182 Ditto over 6 ton

hour

54.00 60.00

57.17

54.00 60.00

57.17

183 Vibrating Roller trailer type up to 5 ton.

hour

50.00 65.00

57.50

50.00 65.00

57.50

184 Pneumatic Tyred Roller 7 ton up to 14 ton.

hour

60.00 72.5

66.25

60.00 72.50

66.25

185 Draw Grid Roller

hour

81.25

81.25

186 Macadam Roller over 5 ton up to 10 ton.

hour

25.00 60.00

39.86

38.00

25.00 65.00

49.25

35.00

50.00 130.00

96.5

25.00 130.00

51.72

187 Drilling Machine complete with all necessary equipment

hour

20.00 80.00

42.34

38.00 120.00

65.33

25.00 100.00

69.79

45.00

50.00 90.00

75.00

20.00 120.00

59.49

188 Crawler Drill

hour

65.00

65.00

Mechanical Handling

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Miscellaneous

189 Bitumen Heating and spraying plant.

hour

62.50

43.75

30.00

30.00 62.50

45.42

190 Asphalt or bitumen Macadam spread self propelled up to


and including 40 hp.

hour

30.00

30.00

191 Bitumenuos Mixing Plant of capacity not less than 50 ton/hr.

hour

26.00

26.00

192 Bitumenuos Emulsion Sprayer

hour

25.00

25.00

193 Chain Saw

hour

15.00

15.00

194 Vibrating Plate Compactor up to and including


6 ton/m2.

hour

25.00 100.00

51.66

56.25 100.00

74.05

25.00 100.00

62.86

195 Portable Compactor

hour

15.00

20.00 30.00

25.00

15.00 30.00

20.00

196 Motorcar including driver, fuel and all consumable.

hour

100.00

100.00

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Miscellaneous ( cont'd )

197 Rowing Boat or Sampan with crew

hour

50.00

50.00

198 Power launch including attendance coxwein crew, fuel, water


and all consumables spares.

hour

120.00

120.00

199 Extra over D4 for echo sounder and operator

hour

50.00

50.00

200 Prestressing jack 100 ton capacity

hour

125.00

125.00

201 Ditto 150 ton capacity

hour

50.00

50.00

202 Generating set up to and including 5 kw.

hour

15.00 60.00

38.33

20.00 60.00

40.00

50.00

15.00 60.00

42.78

203 Ditto over 5 kw up to and including 10 kw.

hour

25.00 70.00

46.67

30.00

68.75

25.00 70.00

48.47

204 Ditto over 10 kw.

hour

35.00

25.00

81.25

25.00 81.25

47.08

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Miscellaneous ( cont'd )

205 Generator

hour

8.25 25.00

16.88

206 Rammer Mechanical

hour

20.00

50.00

207 Rock Drill 4" air power crawler Rig.

hour

208 Asphalt Pavior

hour

209 Asphalt Plant

hour

210 Pneumatic hand breaker

hour

18.75 37.50

28.13

211 Pneumatic Concrete Breaker including tools and hoses.

hour

212 Paver - BK 175 ( 120 ton/hr )

hour

85.00

c: lojij

8.25 25.00

16.88

20.00 50.00

35.00

35.00 100.00

57.83

35.00 100.00

57.83

28.00

28.00

150.00

150.00

18.75 37.50

28.13

25.00

25.00

85.00

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Miscellaneous ( cont'd )

213 Paver - BK 165 ( 100 ton/hr. )

hour

80.00

80.00

214 Crushing Plant

hour

185.00

185.00

215 Diving Equipment

hour

31.25

31.25

216 Cutter Suction Dredger ( 2300 hp. )

hour

1062.50

1062.50

217 Ditto ( 6500 hp. )

hour

1437.50

1437.50

218 Anchor Boat ( 730 hp. )

hour

231.25

231.25

219 Tug Boat

hour

145.63 187.5

166.56

145.63 187.5

166.56

220 Barge ( 180' x 50' )

hour

106.25

106.25

c: lojij

BAHAGIAN : 5.0 - KOS SEWA LOJI / JENTERA

BIL.

KETERANGAN KERJA

UNIT

KAWASAN A
JULAT
(RM)

KAWASAN B
JULAT
PURATA
(RM)
(RM)

KAWASAN C
JULAT
PURATA
(RM)
(RM)

Kawasan A - Perlis, Kedah, & P. Pinang

Kawasan D - Johor

Kawasan B - Perak
Kawasan C - WP.KL , Selangor
N. Sembilan & Melaka

Kawasan E - Pahang
Kawasan F - Terengganu
& Kelantan

KAWASAN D
JULAT
PURATA
(RM)
(RM)

KAWASAN E
JULAT
PURATA
(RM)
(RM)

KAWASAN F
JULAT
PURATA
(RM)
(RM)

KESELURUHAN
JULAT
PURATA
(RM)
(RM)

Miscellaneous ( cont'd )

221 Barge ( 100' x 30' )

hour

62.50

62.50

222 Self Propelled Hopper Barge 400 m3.

hour

162.50

162.50

223 Ditto 600 m3

hour

187.50

187.50

224 Ditto 800 m3

hour

250.00

250.00

225 Ditto 7 ton

hour

100

100.00

c: lojij