Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
PROJECT NAME
Carbon Neutral
Energy Solutions Laboratory
PROJECT LOCATION
Georgia Institute of Technology
Atlanta, Georgia
PROJECT TEAM
Owner: Georgia Institute
of Technology
General Contractor: Gilbane
Architect/Engineer:
HDR, Inc.
SPECIALIZATIONS
Building Information Modeling
LEED Certification
Plumbing Shop Prefab
Pipe Shop Prefab
Sheet Metal Shop Prefab
MARKETS
Education
Science & Technology
THE CHALLENGE
McKenneys was responsible for a tight
project schedule, which required management
of several major subcontractors performing
work concurrently and coordination of
material storage at a congested job site.
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
THE SOLUTION
A pre-planning and batching effort was
implemented. Many energy efficient technologies were utilized, including: dual energy
recovery wheels, an under-floor air distribution system with individual zone controls, a
prefabricated chiller plant with a magnetic
bearing compressor, natural ventilation with
automatically controlled windows and louvers,
radiant under-slab heating systems, coil
condensate recovery, and an underground
www.mckenneys.com
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
2014 McKenneys, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenneys, Inc. and the McKenneys, Inc. logo are registered trademarks of McKenneys, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.