I.D. NO. / D.S.R. NO. STATE PROJECT NO. (P.E.) PROJECT ENGINEER PROJECT DESCRIPTION COUNTY / DIVISION LENGTH TYPE OF CONTRACT REMARKS PROPOSED LETTING (T.I.P.) PROPOSED LETTING (PRODUCTION) EST. COMP. DATE (T.I.P.) ESTIMATED CONSTRUCTION COST
$ 17,000,000 $ 165,000,000 FY 21 FY 18 PAVING A-9 CC 32572 SPEER NC 143 NORTH OF CHEOAH TO NC 28 AT STECOAH GRAHAM / DIV 14 A-9 CB 32572 SPEER TUNNEL AT APPALACHIAN TRAIL GRAHAM / DIV 14 0.549 MI / 0.886 Km
ROBBINSVILLE
1208
R AH AM
1231
C H E R O K E EC O U N T Y
1110
S W
AI N
G R A H A M C O U N T Y
1223 1206
1232
C O
U N T Y
1277
C O
q
28
STECOAH
U N T Y
r
129
q
143
CHEOAH
q
143
A L A H A T N A N
R E V I R
ALMONDS
1121
r
ANDREWS
19 74 129
r
129
q
28
r
19 74
r
19 BUS
r
19 74
COMPLETE
COMPLETE A-9 DC 8.3019122 STEPNEY WEST OF SR 1231 TO CALF PEN GAP GRAHAM / DIV. 14 2.34 MI.
COMPLETE A-9 DB 8.3019122 STEPNEY EAST OF CALF PEN GAP TO SR 1121 AT ALMONDS GRAHAM - SWAIN / DIV. 14 2.381 MI.
COMPLETE A-9 DA 8.3019122 STEPNEY SR 1121 AT ALMONDS TO EXISTING US 19-NC 28 INTERSECTION SWAIN / DIV. 14 1.517 MI.
I.D. NO. / D.S.R. NO. STATE PROJECT NO. (P.E.) / WBS # PROJECT ENGINEER
A-9 DD 8.3019122 SPEER NC 28 AT STECOAH TO WEST OF SR 1231 GRAHAM / DIV. 14 2.86 MI.
PROJECT DESCRIPTION
US 129 TO
GRAHAM / DIV. 14
PY
FY-15
FY-16
1-98
9-96
5-96
2-94
PY
FY-17
FY-18
12-00
3-98
3-98
12-94
6-02 $ 1,600,000
UPDATED- 1/7/13
A9