Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

ZODIAC MARITIME AGENCIES LTD.

BUNKER CHECKLIST #4

Issue Date Approved

: 002 : 17-11-98 : MJR

A pre-transfer conference must take place involving the Chief Engineer and the suppliers representative in charge of the operation before the bunker transfer starts. See 33 CFR 156

PRE TRANSFER CONFERENCE 01 02 03 04 05 06 07 08 10 10 11 12 13 14 15 16 Pre Transfer Conference to include : Review Declaration of Inspection (Bunker checklist 6) A review of communication including ability of duty personnel to speak English Agree manifold watch Identify deck rover watch Agree emergency shut down procedures Agree Sampling procedures / method Agree topping off procedures Identify the product(s) and specification Agree the sequence of the bunkering operation Agree the transfer rate Agree line clearing procedures Identify and agree the responsibility of each person involved in the operation Identify the critical stages of the bunker operation Agree emergency procedures Agree on discharge containment procedure Agree watch and shift arrangements

Initials

______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

Page Complete checklist and make entry n deck log book

1 of 1

You might also like