LEARNING REPORT
NAME Emp No Designation Branch Period of On the Job Training (OJT) Project Details / Site Location DEPT MENTOR : HOD ( Name & Designation) CHIEF MENTOR : RCM ( Name & Designation)
AREA OF TRAINING
Sl No AREA OF TRAINING PERIOD MENTOR
CONTENTS
AREA OF TRAINING ASSIGNED PERIOD ( As decided by the HOD) MENTOR ( Name & Designation) Sl No 1.0 2.0 3.0 4.0 5.0 6.0 6.1 6.2 6.3 6.4 6.5 7.0 7.1 7.2 7.3 7.4 7.5 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 9.0 9.1 10.0 10.1 10.2 10.3 11.0 11.1 DESCRIPTION About the Project under execution About the "PLOT PLAN" Area assigned Sketch / Schematic diagram of the area/ system assigned About the various drawings used in the area/system assigned EXPOSURE TO CONSTRUCTION / INSTALLATION (Study with more details on the core branch/dept) Civil construction activities (as applicable to the trainee's core branch) Mechanical Installations (as applicable to the trainee's core branch) Electrical Installations (as applicable to the trainee's core branch) C&I Installations (as applicable to the trainee's core branch) Interfacing with other functions / depts. EXPOSURE TO DESIGN Civil Design Mechanical Design Electrical Design C&I Design Design Review System EXPOSURE TO PROJECT MANAGEMENT Schedule / WBS Procurement of Material / Equipment Contractor Management Materials Management Plant & Machinery Management Cost Management Risk Management System Project Review System EXPOSURE TO STATUTORY COMPLIANCES Statutory Compliances Exposure to QA / QC Quality Management System Quality Plan Quality Controls / Measures Exposure to Safety Safety Checks / Measures Page no
ASSESSMENT / EVALUATION HOD's evaluation and rating - 1st Quarter HOD's evaluation and rating - 2nd Quarter HOD's evaluation and rating - 3rd Quarter
2.0 PLOT PLAN (Study the Plot plan in detail and write down your understanding as to why it is
required, what it contains, how to interpret, how often it is revised, who prepares, who approves, Is it a controlled document, where it is available, etc)
4.0 SKETCH / SCHEMATIC DIAGRAM (Draw a schematic diagram of the system. Also
systems.) indicate the other associated
5.0 DRAWING READING (Study the drawings in detail like type of drawing, numbering or codification system,
legends used, linkage to the material ( Packing list ), material codification system. Also study the GA ( General Arrangement) drawings and write down your understanding as to why it is required, what it contains, how often it is revised, who prepares, who approves, where it is available, etc)
6.1 CIVIL WORKS (as applicable) (Describe the Technical Sequence of Construction activities including Dos and Donts,
Installation Planning & Monitoring ( Bar Charts, L3 / L4 Network, Preparation of critical pending material list, Identifying constraints. Type & Adequacy of resources - Plant and Machines deployed, Delay analysis, identifying the reasons for day to day delays w.r.t. Plans & unproductive time, Trouble-shooting, etc)
7.1 EXPOSURE TO CIVIL DESIGN (Study and understand Civil design aspects with respect to your area / system of work
(Design Basis Report, Codes & Standards, Quantity Survey, etc). Understand how design clarifications are done. What is Site role in this regard )
7.2 EXPOSURE TO MECHANICAL DESIGN (Study and understand Mechanical design aspects with respect to your area / system
of work (Design Basis Report, Codes & Standards, Material Selection, Standards,etc),Please also understand how design clarifications are done. What is Site role in this regard )
7.2 EXPOSURE TO MECHANICAL DESIGN (Study and understand Mechanical design aspects with respect to your area / system
of work (Design Basis Report, Codes & Standards, Material Selection, Standards,etc),Please also understand how design clarifications are done. What is Site role in this regard )
7.4 EXPOSURE TO C&I DESIGN (Study and understand C&I design aspects with respect to your area / system of work
(Design Basis Report, Standards, etc),Please also understand how design clarifications are done. What is Site role in this regard )
Date
Date
Date