Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

1. Please fill the tables below (as in your report) 2.

Please no decimals in the water cut or oil rate values round them to the first per cent or barrel respectively! 3. Please no percentage - only numbers (i.e. 45.234% = 45; 3456.789 BOPD = 3457)! 4. Please name the completed file as Haggis_WF_SURNAME_Mon_YY.xls (where SURNAME - you surname, Mon and YY - month and year respectively of the Prod Tech exam you are sitting, and leave Haggis and WF as they are, e.g. Haggis_WF_SMITH_Mar_09.xls) and send to your local tutor along witht your report and models

PRes. WC

2800 4770

2700

2600

2500

psia

Your Name: Your Surname: Exam Mon-YY:

John Smith Mar-09

30% 35% 40%


45%

Parameter oil rate PIR Option

Unit BOPD dimens Scenario

500

1000

Horizontal Length, ft 1500 2000 2500

3000

3500

4000

Maximum Oil Production Economic Water Rate @ 30% Cut Water Cut

C2.a1

400ft Horizontal

PRes. Pump GC 8200 HC 7000 HC 9000

2800

2600

2400

2200

psia

KC 12000 KC 15000
PRes. Technical optimum injection rate
Scenario Base Case Acidising 75 Deviated Well Optimum Horizontal Well Optimum ESP Optimum Gas Lift Lowering Xmas Tree Pressure to 100 psia Maximum Economic Production Rate @ 30% Water Cut Water Cut

2800

2600

2400

2200

2000

Psia

You might also like