Professional Documents
Culture Documents
Thermal Lab - 1 Stock 2013
Thermal Lab - 1 Stock 2013
Sl.N o. Assession Reg.Entry No&P.No Qty in Stock Qty Available Qty Missing Qty Breakage
Item Particulars
Remarks
1 2 3 4 5
Oil Fired Thermax Boiler (Steam Boiler) Turbine set up Cleaveland flash and fire point Apparatus Redwood Visometer 1C 4S Kirloskar Diesel Engine-Electrical Dyn.Meter 1C 4S New field Marshal Engine- Rope dyn.Meter.
Pag.No.01 in NCR-TEL Pag.No.12 in NCR-TEL Pag.No.03 in NCR-TEL Pag.No.04 in NCR-TEL Pag.No. 05 in NCR-TEL
1 1 1 1 1
1 1 1 1 1
6 7
Pag.No.06 in NCR-TEL Pag.No.07 in NCR-TEL Pag.No. 08 in NCR-TEL Pag.No.09 in NCR-TEL Pag.No.10 in NCR-TEL Pag.No.11 in NCR-TEL Pag.No. 2 in NCR-TEL
1 1 1 1 1 1 1
1 1 1 1 1 1 1
ELGI 5 HP Two stage Air Compressor Cut Model of Four stroke 8 Petrol Engine Cut Model of Four stroke 9 Diesel Engine ISSUZU Petrol Engine10 Hydraulic Loading (Morse test) 11 5 HP - Air Blower Cut Model of two stroke 12 Petrol Engine
VERIFIED BY
HOD/MECH Page 1 of 2
PRINCIPAL
CEO
13 D/E Spanner (6-32) 14 Ring Spanner (6-32) 15 Cutting Plier (8'') 16 17 18 19 20 Taparia Screw Driver 928 Taparia Screw Driver 829 Taparia Screw Driver (177211 - DS1) Taparia Screw Driver 832 Taparia Screw Driver 939
Pag.No. 23 in NCR-TEL Pag.No. 24 in NCR-TEL Pag.No. 25 in NCR-TEL Pag.No. 26 in NCR-TEL Pag.No. 27 in NCR-TEL Pag.No. 28 in NCR-TEL Pag.No. 29 in NCR-TEL Pag.No. 30 in NCR-TEL Pag.No. 31 in NCR-TEL
1 set 1 set 1 1 1 1 1 1 1
1 set 1 set 1 1 1 1 1 1 1
Name & Signature of Stock Verification Committee Co ordinator: Mr.K.Chandramohan - Hod / CSE Name & Signature of Stock Verification committee members: 1.Mr.K.J.Jagdish - AP / CSE 2.Mr.A.Kumar - AP / CSE
VERIFIED BY
HOD/MECH
PRINCIPAL
CEO
Page 2 of 2