Regen Powertech Pvt. LTD.: Quantity Offered Company Name: Udaipur Tower Plant TT FC

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Daily Inspection Status -V77,V82

QUANTITY OFFERED TT
Set No : 002 Set No : 001 Set No :

Regen Powertech Pvt. Ltd.

Company Name: Udaipur Tower plant


Sl. No. Component Name

FC
Set No :

1 2 3 4 5 6 7

Tower Section 1 Tower Section 2 Tower Section 3 Tower Section 4 Foundation Can Stair Case Raw Materials

RP-V87-002-S1

RP-V87-002-S4

RP-V87-001-S4

Present Job Status

S1 dimension, Easy laser, UT have been witnessed. Visual rework given. S4 inside blasting only finished and cleared for S4 checked for stamping and rework points given. inside Primer.

Prepared by: Legend: D - Dispatched; ETD Expected to Deliver; C Completed and yet to be Dispatched; WIP-% Work In Progress-%completed

Pl. Mention about the process status as indicated

in the Process Flow


Cutting of Plates Edge Preparation of Plates Rolling / bending of Plates Fit up LS Welding LS NDT-UT CS Welding CS NDT UT

Process Flow : Raw Material Identification

Dispatch

Packing

Drying

Painting

Grit/shot blasting

Final Inspection

Easy Laser checking

Date: 01.02.2013

Stair -Set No : Set No :

Easy Laser checking

You might also like