PROJECT LOCATION SUBJECT

ITEM NO. 1 1.1 1.2 1.3 1.4 1.5 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 3 3.1 3.2 3.3 3.4 5 5.1 5.2 5.3 6 7 7.1 7.2 8 9

: PROPOSED RENOVATION FOR TWO-STORY RESIDENTIAL BUILDING : LOT 79, LOT 21, SAVANNAH SUBD., BRGY. CUAYAN, ANGELES CITY, PAMPANGA : BILL OF MATERIALS AND COST ESTIMATES FOR CEILING/ ELECTRICAL, PARTITIONS, BUILT-IN CABINETS, AND FLOORING
DESCRIPTION QUANTITY COST NOTE TOTAL COST

CONCRETE AND MASONRY Portland Cement Screened Sand 4 CHB Machine Made Reinforcing Bars #16 G.I. Wire CARPENTRY WORKS Form Lumber 2x3x10 Form Lumber 2x2x10 Thick Plywood Ceiling 4x 8 Thick Plyboard Cabinet and Ceiling Thick Plywood Formica (Wooden Design) Assorted Finishing Nails Stikwel (Adhesive Glue) DOORS 70 x 210 Panel Door with Jamb 80 x 210 Panel Door with Jamb Door Knob and Double Lock Security Grills on Window HARDWARES AND FIXTURES Granite Glazed Tiles Double Palette Tiles for Stairs Tile Trim and rubber edges PAINTING ELECTRICAL Solid Wires and Switches Pin Lights STAIRS (WOODEN OR STAINLESS) GLASS

10PCS

2,500.00 2,000.00 To Follow To Follow To Follow

25 pcs 30 pcs 15 19 10 6 kilos 10 medium 1 set 1 set set

8,000.00 9,000.00 5,000.00 19,000.00 7,000.00 To Follow 300.00 1, 500.00 6,000.00 6,500.00 5,000.00 To Follow

140 pcs 13 pcs

22, 000.00 2,000.00 2,500.00

To Follow To Follow To Follow To follow

10pcs

2,000.00 2 to 3,000.00 To Follow

ESTIMATED PRIORITY COST FOR MATERIALS : LABOR:

P 76, 800.00 P500 to P600/ day