Gannon Dunkerley & Co., LTD (Med) Construction Schedule (Preliminery) of BTG, Esp, Mill, CHP, Ahp & Manpower Considering Hydro Test With in 8 Months
Gannon Dunkerley & Co., LTD (Med) Construction Schedule (Preliminery) of BTG, Esp, Mill, CHP, Ahp & Manpower Considering Hydro Test With in 8 Months
Gannon Dunkerley & Co., LTD (Med) Construction Schedule (Preliminery) of BTG, Esp, Mill, CHP, Ahp & Manpower Considering Hydro Test With in 8 Months
S.N O.
1 2 3 4 5 6 7 8 9 10 11 12 13 0 MONTH 1st MONTH 1st 2nd 3rd 4th 5th 2nd MONTH 6th 7th 8th 9th 3rd MONTH 10th 11th 12th 13th 4th MONTH 14th 15th
DESCRIPTION
RELEASE OF LOI SITE MOBILIZATION & RECEPT OF DRAWING BOILER STEEL STRUCTURE ASSEMBLY & ERECTION BOILER STRUCTURE PLATFORM BOILER DRUM. PRESSURE PART 1st PASS ASSEMBLY & ERECTION PRESSURE PART 2nd PASS ASSEMBLY & ERECTION HYDROTEST (INTERNAL) HYDROTEST (3rd PRTY) CHEMICAL CLEANING APH MILL ROTARY EQUIPMENT (ID, FD, PA FAN)
QTY.
UNIT
14 15 16 17 18 19 20 21 22 23 24
DUCTING SOOTBLOWER & PIPING ROOF STRUCTURE/ SKIN CASING, DRUM HOUSE ENCLOSURE STEAM BLOWING ESP TG MAIN CONDENSER TG EQUIPMENTS TG PIPING CHP AHP
25 MANPOWER
100
200
250
350
400
NOTE:-
GANNON DUNKERLEY & CO., LTD (MED) UCTION SCHEDULE (PRELIMINERY) OF BTG,ESP,MILL,CHP,AHP & MANPOWER CONSIDERING HYDRO T
5th MONTH 16th 17th 18th 19th 20th 21st 6th MONTH 22nd 23rd 24th 25th 7th MONTH 26th 27th 28th 29th 8th MONTH 30th 31th 32th 33th 9th MONTH 34th 35th 36th 37th
MONTH
450
500
700
750
750
SHEET-I
14th MO
750
750
500
400
40
ET-I
400
D.
S.N O.
1 2 3 4 5 6 7 8 9 10 11
0 MONTH
DESCRIPTION
Left Side W.W With Outlet Header Erection Right Side W.W With Outlet Header Erection Front Side W.W With Outlet Header Erection Screen Tube With Header Erection Rear Water Wall RH Finishing Header. RH Finishing Coil. RH Platen Header. RH Platen Coil. Burnner With Corner Panel. All Hangers.
QTY.
UNIT
1st
2nd
12
13
SH Platen Coil.
14
15
16
17
Rear Buckstay.
18
Front S Panel.
19 20 21 22 23
Right S Panel. Left Side Buckstay. Right Side Buckstay. Front Side Buckstay. Down Comer.
24
25
Riser Tube.
26
27 28 29 30 31 32 33 34 35 36 37 38
Radiant Roof Rear. Divisional Header Inlet and Outlet. Divisional Panel. Steem Cool Spacer. Drain and Vent. Fin Welding. Corner Connection Buckstay. SH Finishing Inlet Header. SH Finishing Outlet Header. SH Finishing Outlet Coil. Radient.Roof Outlet Header. Rear Back Pass Wall.
Page 6 of 12
39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Eco Hanging Header. LTSH Outlet Header. Eco Inlet Header. B.P Front Wall With Buckstay. Vertical LTSH. Hanger Tube Suspension. Back Pass Left Wall. Back Pass Right Wall. LTSH Coil. ECO Coil. Main Feed Water Tube Erection Upto Valve (Including Valve Erection). Intermediate header. ECO Outlet Header. ECO Hanger Tube. ECO Inlet Header Loose Tube. Temporary Piping For Hydro Test. Hydro Test (Internal). Hydro Test (Third Party).
FOR
Page 7 of 12
SHEET-II
TOTAL
Page 8 of 12
Page 9 of 12
CO
S.N O. 1 2 3 4 5 6 7 8 9 HYDRA TRAILOR CRANE- 75MT CRANE - 50MT CRANE - 18MT WELDING RECTIFIER WELDING GENERATOR WINCH 2MT WINCH 3MT 0 MONTH DESCRIPTION QTY. UNIT 1st MONTH 2nd MONTH 3rd MONTH 4th MONTH
2 2 1 1 30 20 20 -
2 2 1 1 30 2 2 2 10 30 30 10 -
4 3 2 1 1 50 5 2 2 4 20 40 40 20 1
5 4 2 1 2 80 5 2 3 6 10 30 50 50 30 1
5 4 4 1 2 120 10 4 4 6 30 50 70 70 40 1
10 WINCH 5MT 11 CHAIN PULLY BLOCK 1MT 12 CHAIN PULLY BLOCK 2MT
14 CHAIN PULLY BLOCK 5MT 15 CHAIN PULLY BLOCK 10MT 16 HYDRO TEST PUMP 17 FEED PUMP 18 COMPRESSOR 19 GRINDING MACHINE 20 LIFTING ACCESSROIES 21 SMALL TOOLS 22 THIRIDO LIGHT
GANNON DUNKERLEY & CO., LTD (MED) CONSTRUCTION SCHEDULE (PRELIMINERY)Unit-III EQUIPMENT DEPLOYMENT SCHEDULE
5th MONTH 6th MONTH 7th MONTH 8th MONTH 9th MONTH
ONTH
10th MON
20
SHEET-III
10th MONTH
11th MONTH
12th MONTH
13th MONTH
14th MONTH
5 4 2 150 10 4 6 8 20 30 60 50 50 -
2 2 1 100 -