Professional Documents
Culture Documents
Pile Cap - 3
Pile Cap - 3
Rev.
Prep. By
Date
Chkd. By
Date
RK
28.02.13
HM
28.02.13
Client :
Project : BINA COAL SHED
Subject : WARE HOUSE
PILE CAP FOUNDATION CALCULATIONS
gdry
=
=
=
=
=
=
gsub
kN/m3
gw
m
=
=
kN/m3
=
=
=
=
=
=
=
=
=
=
=
=
=
10
0.40
0.75
2
1
0.15
3.3
3
1.05
1.50
75
50
1.395
1.00
1.06
1.06
1500.00
100.00
500.00
0.00
fck
fy
C 1
2
A
3
B
L
B
B'
H
d
h
a
b
M30
Fe415
30
415
25
19
mpa
mpa
kN/m3
kN/m3
m
Nos
Nos
m
m
m
m
m
mm
mm
m
m
m
m
KN
KN
KN
2.25 m
=
=
=
1470
-220
-3.6
KN
KN
KN
Mx = FZ * height of pedestal
-3.6 X(0+1.395)
-5.03
KN-m
Mz = FX * height of pedestal
-220 X(0+1.395)
-306.9 KN-m
Mx = (-5.03+-36)
-41.03 KN-m
Mz = (-306.9-2101)
-2407.9 KN-m
Final moments :
(1470/1500)+2
Pile dia
0.75
0.75
0.75
Pile loads :
X1
Y1
X^2
0
0.98
0
-1.13 -0.98 1.27
1.13 -0.98 1.27
=
2) P2 =
=
3) P3 =
=
Nos
0.0155 M^4
Y^2
iX^2
iy^2
0.95
0
0.01473
0.95 0.01962 0.01473
0.95 0.01962 0.01473
0.03923 0.0442
I xx= Izz =
(1470/3)+(-41.03*0.0155*0.975/0.039234375)+(-2407.9*0.0155*0/0.0442040625)
474.2
KN
(1470/3)+(-41.03*0.0155*-0.975/0.039234375)+(-2407.9*0.0155*-1.125/0.0442040625)
1455.67 KN
(1470/3)+(-41.03*0.0155*-0.975/0.039234375)+(-2407.9*0.0155*1.125/0.0442040625)
-444.06 KN
safe
Critical section along Y-Y direction :
Design of Beam DC :
Maximun column load 1/3 L from AB line
0.65 M
2L/3
1.3 M
L (3 /2)
Rd = 980 KN
0.75 m
KN
1.95 m
(1.732/2)*2.25
Max Reaction load of piles (unfactored)
Rc = 490 KN
=
1470 KN
637 KN-M
956 KN-M
0.47
0.28
25.00 mm
Area of Bar
491 sq mm
126 mm
150 mm
M xx =
(M u xx =
(980*0.65)
(1.5*637)
Mu / Bd^2
= (955.5/(1.05*1.395^2))
Ast = (0.28*0.75*1.39510^4)
=
2930
Sq mm
(491/2930)*0.75
Provided spacing
(0.698-0.395)
Shear stress (
= Vu /Bd
= (1.5*98010^3/1.05*1.395*10^6)
c (max)
shear stress
(100*1.05*1000/150*491)
=
0.698 M
Shear line with in pile
=
0.303 M
=
=
=
0.45 M
294
KN
980 KN
1.004 N/sq mm
3.5 N/sq mm
= 0.23
= 15
=
0.356 N/sq mm
(0.356*1.05*1.39510^3)
521 KN
949 KN
10
78.6 Sq mm
167 MM
980 KN
551 KN-M
827 KN-M
0.41
0.23
20
Area of Bar
314 sq mm
137 MM
Provided spacing
100 mm
1456 KN
1.491 N/sq mm
3.5 N/sq mm
V us
Spacing of stirrups
(1.5*980-521.45)
(0.87*415*78.55*4*1.395/948.55)
mm
490 KN
Ra
2.25 M
unfactored moment
Factored moment
M xx =
(M u xx =
490 KN
Rb
(980*2.25/4)
(1.5*551.25)
Mu / Bd^2
= (826.875/(1.05*1.395^2))
Ast = (0.23*1.05*1.39510^4)
=
Shear stress (
shear stress
Sq mm
(314/2406)*1.05
= Vu /Bd
= (1.5*1455.6710^3/1.05*1.395*10^6)
c (max)
2406
(100*1000/100*314)
mm
= 0.23
= 15
=
0.356 N/sq mm
(0.356*1.05*1.39510^3)
V us
(1.5*1455.67-521.45)
521 KN
1662 KN
Spacing of stirrups
(0.87*415*78.55*4*1.395/1662.06)
10
mm
78.6 Sq mm
95
MM
= (1.395/2) m
1470 KN
9.82
1.395 m
0.11 N/sq mm
(KN)
2*((1.06+1.395)+(1.06+1.395))
Grade
TC = Ks Tc
Ks = 0.5+
= short side /long side
= (1.06/1.06)
Ks = (0.5+1)
1.5
Tc = 0.25 Fck
(0.25*sqrt30)
or
= 1.37 N/sq mm
Safe
25
MM
1.5 N/sq mm
940 MM
(1.395-0.05)
=
OK
1345
VNC
Rev.
Prep. By
Date
Chkd. By
Date
RK
28.02.13
HM
28.02.13
Client :
Project : BINA COAL SHED
Subject : WARE HOUSE
PILE CAP FOUNDATION CALCULATIONS
gdry
=
=
=
=
=
=
gsub
kN/m3
gw
m
=
=
kN/m3
=
=
=
=
=
=
=
=
=
=
=
=
=
10
0.40
0.75
2
1
0.15
3.3
3
1.05
1.50
75
50
1.395
1.00
1.06
1.06
1500.00
100.00
500.00
0.00
fck
fy
C 1
2
A
3
B
L
B
B'
H
d
h
a
b
M30
Fe415
30
415
25
19
mpa
mpa
kN/m3
kN/m3
m
Nos
Nos
m
m
m
m
m
mm
mm
m
m
m
m
KN
KN
KN
2.25 m
=
=
=
1470
0
161.8
Mx = FZ * height of pedestal
161.8 X(0+1.395)
225.72 KN-m
Mz = FX * height of pedestal
0 X(0+1.395)
KN
KN
KN
KN-m
Final moments :
Mx = (225.72+-1517)
Mz = (0-0)
KN-m
Nos
(1470/1500)+2
Pile dia
0.75
0.75
0.75
Pile loads :
X1
Y1
X^2
0
0.98
0
-1.13 -0.98 1.27
1.13 -0.98 1.27
=
2) P2 =
=
3) P3 =
=
0.0155 M^4
Y^2
iX^2
iy^2
0.95
0
0.01473
0.95 0.01962 0.01473
0.95 0.01962 0.01473
0.03923 0.0442
I xx= Izz =
1742.72 KN-m
(1470/3)+(1742.72*0.0155*0.975/0.039234375)+(0*0.0155*0/0.0442040625)
1161.27 KN
(1470/3)+(1742.72*0.0155*-0.975/0.039234375)+(0*0.0155*-1.125/0.0442040625)
-181.27 KN
(1470/3)+(1742.72*0.0155*-0.975/0.039234375)+(0*0.0155*1.125/0.0442040625)
-181.27 KN
safe
Critical section along Y-Y direction :
Design of Beam DC :
Maximun column load 1/3 L from AB line
0.65 M
2L/3
1.3 M
L (3 /2)
Rd = 980 KN
0.75 m
KN
1.95 m
(1.732/2)*2.25
Max Reaction load of piles (unfactored)
Rc = 490 KN
=
1470 KN
637 KN-M
956 KN-M
0.47
0.28
25.00 mm
Area of Bar
491 sq mm
126 mm
150 mm
M xx =
(M u xx =
(980*0.65)
(1.5*637)
Mu / Bd^2
= (955.5/(1.05*1.395^2))
Ast = (0.28*0.75*1.39510^4)
=
2930
Sq mm
(491/2930)*0.75
Provided spacing
(0.698-0.395)
Shear stress (
= Vu /Bd
= (1.5*98010^3/1.05*1.395*10^6)
c (max)
shear stress
(100*1.05*1000/150*491)
=
0.698 M
Shear line with in pile
=
0.303 M
=
=
=
0.45 M
696.76 KN
980 KN
1.004 N/sq mm
3.5 N/sq mm
= 0.23
= 15
=
0.356 N/sq mm
(0.356*1.05*1.39510^3)
521 KN
949 KN
10
78.6 Sq mm
167 MM
980 KN
551 KN-M
827 KN-M
0.41
0.23
20
Area of Bar
314 sq mm
137 MM
Provided spacing
100 mm
490 KN
V us
Spacing of stirrups
(1.5*980-521.45)
(0.87*415*78.55*4*1.395/948.55)
mm
490 KN
Ra
2.25 M
unfactored moment
Factored moment
M xx =
(M u xx =
490 KN
Rb
(980*2.25/4)
(1.5*551.25)
Mu / Bd^2
= (826.875/(1.05*1.395^2))
Ast = (0.23*1.05*1.39510^4)
=
Shear stress (
shear stress
Sq mm
(314/2406)*1.05
= Vu /Bd
= (1.5*49010^3/1.05*1.395*10^6)
c (max)
2406
(100*1000/100*314)
mm
0.502 N/sq mm
3.5 N/sq mm
= 0.23
= 15
=
0.356 N/sq mm
(0.356*1.05*1.39510^3)
521 KN
214 KN
10
78.6 Sq mm
741 MM
V us
Spacing of stirrups
(1.5*490-521.45)
(0.87*415*78.55*4*1.395/213.55)
mm
= (1.395/2) m
1470 KN
9.82
1.395 m
0.11 N/sq mm
(KN)
2*((1.06+1.395)+(1.06+1.395))
Grade
TC = Ks Tc
Ks = 0.5+
= short side /long side
= (1.06/1.06)
Ks = (0.5+1)
1.5
Tc = 0.25 Fck
(0.25*sqrt30)
or
= 1.37 N/sq mm
Safe
25
MM
1.5 N/sq mm
940 MM
(1.395-0.05)
=
OK
1345
VNC
Rev.
Prep. By
Date
Chkd. By
Date
RK
02.03.13
HM
03.03.13
Client :
Project : BINA COAL SHED
Subject : WARE HOUSE
PILE CAP FOUNDATION CALCULATIONS
gdry
=
=
=
=
=
=
gsub
kN/m3
gw
m
=
=
kN/m3
=
=
=
=
=
=
=
=
=
=
=
=
=
10
0.40
0.75
2
1
0.25
4.25
3.85
1.25
1.50
75
50
1.395
1.00
1.06
1.06
1500.00
100.00
500.00
0.00
fck
fy
C 1
2
A
3
B
L
B
B'
H
d
h
a
b
M30
Fe415
30
415
25
19
mpa
mpa
kN/m3
kN/m3
m
Nos
Nos
m
m
m
m
m
mm
mm
m
m
m
m
KN
KN
KN
=
=
=
1470 KN
-165.1 KN
-3.6
KN
Mx = FZ * height of pedestal
-3.6 X(0+1.395)
-5.03
Mz = FX * height of pedestal
-165.1 X(0+1.395)
KN-m
-230.32 KN-m
Final moments :
Mx = (-5.03+-36)
Mz = (-230.32-1576)
(1470/1500)+2
Pile dia
0.75
0.75
0.75
Pile loads :
X1
0
-1.5
1.5
=
2) P2 =
=
3) P3 =
=
Y1
1.3
-1.3
-1.3
X^2
0
2.25
2.25
0.0155 M^4
Y^2
iX^2
iy^2
1.69
0
0.0262
1.69 0.03488 0.0262
1.69 0.03488 0.0262
0.06975 0.07859
I xx= Izz =
(1470/3)+(30.97*0.0155*1.3/0.06975)+(-1806.32*0.0155*0/0.078585)
498.95 KN
(1470/3)+(30.97*0.0155*-1.3/0.06975)+(-1806.32*0.0155*-1.5/0.078585)
1015.47 KN
(1470/3)+(30.97*0.0155*-1.3/0.06975)+(-1806.32*0.0155*1.5/0.078585)
-53.36 KN
safe
Critical section along Y-Y direction :
Design of Beam DC :
Maximun column load 1/3 L from AB line
30.97
KN-m
-1806.3 KN-m
3
Nos
0.87 M
2L/3
L (3 /2)
Rd = 980 KN
0.75 m
KN
=
1.73 M
2.6 m
(1.732/2)*3
Max Reaction load of piles (unfactored)
Rc = 499 KN
=
1470 KN
863 KN-M
1295 KN-M
0.54
0.25
25.00 mm
Area of Bar
491 sq mm
141 mm
125 mm
M xx =
(M u xx =
(498.95*1.73)
(1.5*863.18)
Mu / Bd^2
= (1294.77/(1.25*1.395^2))
Ast = (0.25*0.75*1.39510^4)
=
2616
Sq mm
(491/2616)*0.75
Provided spacing
(0.698-0.825)
Shear stress (
= Vu /Bd
= (1.5*98010^3/1.25*1.395*10^6)
c (max)
shear stress
(100*1.25*1000/125*491)
=
0.698 M
Out side the shear line
=
-0.127 M
=
=
=
0.62 M
412.47 KN
980 KN
0.843 N/sq mm
3.5 N/sq mm
= 0.28
= 12
=
0.388 N/sq mm
(0.388*1.25*1.39510^3)
677 KN
793 KN
10
78.6 Sq mm
199 MM
980 KN
735 KN-M
1103 KN-M
0.46
0.23
25
Area of Bar
491 sq mm
255 MM
Provided spacing
150 mm
1015 KN
0.874 N/sq mm
3.5 N/sq mm
V us
Spacing of stirrups
(1.5*980-676.58)
(0.87*415*78.55*4*1.395/793.42)
mm
1015 KN
Ra
unfactored moment
Factored moment
M xx =
(M u xx =
-26.7 KN
Rb
(1015.47*3/2)
(1.5*735)
Mu / Bd^2
= (1102.5/(1.25*1.395^2))
Ast = (0.23*1.25*1.39510^4)
=
Shear stress (
shear stress
Sq mm
(491/2406)*1.25
= Vu /Bd
= (1.5*1015.4710^3/1.25*1.395*10^6)
c (max)
2406
(100*1000/150*491)
mm
= 0.23
= 15
=
0.356 N/sq mm
(0.356*1.25*1.39510^3)
621 KN
902 KN
10
78.6 Sq mm
175 MM
V us
Spacing of stirrups
(1.5*1015.47-620.78)
(0.87*415*78.55*4*1.395/902.43)
mm
= (1.395/2) m
1470 KN
9.82
1.395 m
0.11 N/sq mm
(KN)
2*((1.06+1.395)+(1.06+1.395))
Grade
TC = Ks Tc
Ks = 0.5+
= short side /long side
= (1.06/1.06)
Ks = (0.5+1)
1.5
Tc = 0.25 Fck
(0.25*sqrt30)
or
= 1.37 N/sq mm
Safe
25
MM
1.5 N/sq mm
940 MM
(1.395-0.05)
=
OK
1345
VNC
Rev.
Prep. By
Date
Chkd. By
Date
RK
02.03.13
HM
03.03.13
Client :
Project : BINA COAL SHED
Subject : WARE HOUSE
PILE CAP FOUNDATION CALCULATIONS
gdry
=
=
=
=
=
=
gsub
kN/m3
gw
m
=
=
kN/m3
=
=
=
=
=
=
=
=
=
=
=
=
=
10
0.40
0.75
2
1
0.25
4.25
3.85
1.25
1.50
75
50
1.395
1.00
1.06
1.06
1500.00
100.00
500.00
0.00
fck
fy
C 1
2
A
3
B
L
B
B'
H
d
h
a
b
M30
Fe415
30
415
25
19
mpa
mpa
kN/m3
kN/m3
m
Nos
Nos
m
m
m
m
m
mm
mm
m
m
m
m
KN
KN
KN
=
=
=
1470 KN
0
KN
-120.4 KN
Mx = FZ * height of pedestal
-120.4 X(0+1.395)
-167.96 KN-m
Mz = FX * height of pedestal
0 X(0+1.395)
KN-m
Mx = (-167.96+1129)
-1297
KN-m
Mz = (0-0)
KN-m
Nos
Final moments :
(1470/1500)+2
Pile dia
0.75
0.75
0.75
Pile loads :
X1
0
-1.5
1.5
=
2) P2 =
=
3) P3 =
=
Y1
1.3
-1.3
-1.3
X^2
0
2.25
2.25
0.0155 M^4
Y^2
iX^2
iy^2
1.69
0
0.0262
1.69 0.03488 0.0262
1.69 0.03488 0.0262
0.06975 0.07859
I xx= Izz =
(1470/3)+(-1296.96*0.0155*1.3/0.06975)+(0*0.0155*0/0.078585)
115.32 KN
(1470/3)+(-1296.96*0.0155*-1.3/0.06975)+(0*0.0155*-1.5/0.078585)
864.68 KN
(1470/3)+(-1296.96*0.0155*-1.3/0.06975)+(0*0.0155*1.5/0.078585)
864.68 KN
safe
Critical section along Y-Y direction :
Design of Beam DC :
Maximun column load 1/3 L from AB line
0.87 M
2L/3
L (3 /2)
Rd = 980 KN
0.75 m
KN
=
1.73 M
2.6 m
(1.732/2)*3
Max Reaction load of piles (unfactored)
Rc = 490 KN
=
1470 KN
848 KN-M
1272 KN-M
0.53
0.25
25.00 mm
Area of Bar
491 sq mm
141 mm
125 mm
M xx =
(M u xx =
(490*1.73)
(1.5*847.7)
Mu / Bd^2
= (1271.55/(1.25*1.395^2))
Ast = (0.25*0.75*1.39510^4)
=
2616
Sq mm
(491/2616)*0.75
Provided spacing
(0.698-0.825)
Shear stress (
= Vu /Bd
= (1.5*98010^3/1.25*1.395*10^6)
c (max)
shear stress
(100*1.25*1000/125*491)
=
0.698 M
Out side the shear line
=
-0.127 M
=
=
=
0.62 M
405.07 KN
980 KN
0.843 N/sq mm
3.5 N/sq mm
= 0.28
= 12
=
0.388 N/sq mm
(0.388*1.25*1.39510^3)
677 KN
793 KN
10
78.6 Sq mm
199 MM
980 KN
735 KN-M
1103 KN-M
0.46
0.23
25
Area of Bar
491 sq mm
255 MM
Provided spacing
150 mm
865 KN
V us
Spacing of stirrups
(1.5*980-676.58)
(0.87*415*78.55*4*1.395/793.42)
mm
865 KN
Ra
unfactored moment
Factored moment
M xx =
(M u xx =
432 KN
Rb
(864.68*3/2)
(1.5*735)
Mu / Bd^2
= (1102.5/(1.25*1.395^2))
Ast = (0.23*1.25*1.39510^4)
=
Shear stress (
shear stress
Sq mm
(491/2406)*1.25
= Vu /Bd
= (1.5*864.6810^3/1.25*1.395*10^6)
c (max)
2406
(100*1000/150*491)
mm
0.744 N/sq mm
3.5 N/sq mm
= 0.23
= 15
=
0.356 N/sq mm
(0.356*1.25*1.39510^3)
621 KN
676 KN
10
78.6 Sq mm
234 MM
V us
Spacing of stirrups
(1.5*864.68-620.78)
(0.87*415*78.55*4*1.395/676.24)
mm
= (1.395/2) m
1470 KN
9.82
1.395 m
0.11 N/sq mm
(KN)
2*((1.06+1.395)+(1.06+1.395))
Grade
TC = Ks Tc
Ks = 0.5+
= short side /long side
= (1.06/1.06)
Ks = (0.5+1)
1.5
Tc = 0.25 Fck
(0.25*sqrt30)
or
= 1.37 N/sq mm
Safe
25
MM
1.5 N/sq mm
940 MM
(1.395-0.05)
=
OK
1345
VNC
Rev.
Prep. By
Date
Chkd. By
Date
RK
04.03.13
HM
05.03.13
Client :
Project : BINA COAL SHED
Subject : WARE HOUSE
PILE CAP FOUNDATION CALCULATIONS
gdry
=
=
=
=
=
=
gsub
kN/m3
gw
m
=
=
kN/m3
=
=
=
=
=
=
=
=
=
=
=
=
=
10
0.40
0.75
2
1
0.15
3.3
3
1.05
1.20
75
50
1.095
1.00
1.06
1.06
1500.00
100.00
500.00
0.00
fck
fy
C 1
2
A
3
B
L
B
B'
H
d
h
a
b
M30
Fe415
30
415
25
19
mpa
mpa
kN/m3
kN/m3
m
Nos
Nos
m
m
m
m
m
mm
mm
m
m
m
m
KN
KN
KN
2.25 m
=
=
=
1019
-120
-3.6
KN
KN
KN
Mx = FZ * height of pedestal
-3.6 X(0+1.095)
-3.95
KN-m
Mz = FX * height of pedestal
-120 X(0+1.095)
-131.4 KN-m
Mx = (-3.95+-36)
-39.95 KN-m
Mz = (-131.4-1098)
-1229.4 KN-m
Final moments :
(1019/1500)+2
Pile dia
0.75
0.75
0.75
Pile loads :
X1
Y1
X^2
0
0.98
0
-1.13 -0.98 1.27
1.13 -0.98 1.27
=
2) P2 =
=
3) P3 =
=
Nos
0.0155 M^4
Y^2
iX^2
iy^2
0.95
0
0.01473
0.95 0.01962 0.01473
0.95 0.01962 0.01473
0.03923 0.0442
I xx= Izz =
(1019/3)+(-39.95*0.0155*0.975/0.039234375)+(-1229.4*0.0155*0/0.0442040625)
324.28 KN
(1019/3)+(-39.95*0.0155*-0.975/0.039234375)+(-1229.4*0.0155*-1.125/0.0442040625)
840.03 KN
(1019/3)+(-39.95*0.0155*-0.975/0.039234375)+(-1229.4*0.0155*1.125/0.0442040625)
-129.92 KN
safe
Critical section along Y-Y direction :
Design of Beam DC :
Maximun column load 1/3 L from AB line
0.65 M
2L/3
1.3 M
L (3 /2)
Rd = 679 KN
0.75 m
KN
1.95 m
(1.732/2)*2.25
Max Reaction load of piles (unfactored)
Rc = 340 KN
=
1019 KN
442 KN-M
662 KN-M
0.53
0.21
20.00 mm
Area of Bar
314 sq mm
191 mm
150 mm
M xx =
(M u xx =
(339.666666666667*1.3)
(1.5*441.57)
Mu / Bd^2
= (662.355/(1.05*1.095^2))
Ast = (0.21*0.75*1.09510^4)
=
1725
Sq mm
(314/1725)*1.05
Provided spacing
(0.548-0.395)
Shear stress (
= Vu /Bd
= (1.5*679.3310^3/1.05*1.095*10^6)
c (max)
shear stress
(100*1.05*1000/150*314)
=
0.548 M
Shear line with in pile
=
0.153 M
=
=
=
0.60 M
271.73 KN
679 KN
0.886 N/sq mm
3.5 N/sq mm
= 0.19
= 18
=
0.327 N/sq mm
(0.327*1.05*1.09510^3)
376 KN
643 KN
10
78.6 Sq mm
193 MM
679 KN
473 KN-M
709 KN-M
0.57
0.21
20
Area of Bar
314 sq mm
191 MM
Provided spacing
150 mm
840 KN
V us
Spacing of stirrups
(1.5*679.33-375.97)
(0.87*415*78.55*4*1.095/643.03)
mm
840 KN
Ra
2.25 M
unfactored moment
Factored moment
M xx =
(M u xx =
-65 KN
Rb
(840.03*2.25/2)
(1.5*472.52)
Mu / Bd^2
= (708.78/(1.05*1.095^2))
Ast = (0.21*1.05*1.09510^4)
=
Shear stress (
shear stress
Sq mm
(314/1725)*1.05
= Vu /Bd
= (1.5*840.0310^3/1.05*1.095*10^6)
c (max)
1725
(100*1000/150*314)
mm
1.096 N/sq mm
3.5 N/sq mm
= 0.19
= 18
=
0.327 N/sq mm
(0.327*1.05*1.09510^3)
376 KN
884 KN
10
78.6 Sq mm
141 MM
V us
Spacing of stirrups
(1.5*840.03-375.97)
(0.87*415*78.55*4*1.095/884.08)
mm
= (1.095/2) m
1019 KN
8.62
1.095 m
0.11 N/sq mm
(KN)
2*((1.06+1.095)+(1.06+1.095))
Grade
TC = Ks Tc
Ks = 0.5+
= short side /long side
= (1.06/1.06)
Ks = (0.5+1)
1.5
Tc = 0.25 Fck
(0.25*sqrt30)
or
= 1.37 N/sq mm
Safe
20
MM
1.5 N/sq mm
752 MM
(1.095-0.05)
=
OK
1045
VNC
Rev.
Prep. By
Date
Chkd. By
Date
RK
02.03.13
HM
03.03.13
Client :
Project : BINA COAL SHED
Subject : WARE HOUSE
PILE CAP FOUNDATION CALCULATIONS
gdry
=
=
=
=
=
=
gsub
kN/m3
gw
m
=
=
kN/m3
=
=
=
=
=
=
=
=
=
=
=
=
=
10
0.40
0.75
2
1
0.15
3.3
3
1.05
1.20
75
50
1.095
1.00
1.06
1.06
1500.00
100.00
500.00
0.00
fck
fy
C 1
2
A
3
B
L
B
B'
H
d
h
a
b
M30
Fe415
30
415
25
19
mpa
mpa
kN/m3
kN/m3
m
Nos
Nos
m
m
m
m
m
mm
mm
m
m
m
m
KN
KN
KN
2.25 m
=
=
=
1470 KN
0
KN
-120.4 KN
Mx = FZ * height of pedestal
-120.4 X(0+1.095)
-131.84 KN-m
Mz = FX * height of pedestal
0 X(0+1.095)
KN-m
Final moments :
Mx = (-131.84+1129)
Mz = (0-0)
KN-m
Nos
(1470/1500)+2
Pile dia
0.75
0.75
0.75
Pile loads :
X1
Y1
X^2
0
0.98
0
-1.13 -0.98 1.27
1.13 -0.98 1.27
=
2) P2 =
=
3) P3 =
=
0.0155 M^4
Y^2
iX^2
iy^2
0.95
0
0.01473
0.95 0.01962 0.01473
0.95 0.01962 0.01473
0.03923 0.0442
I xx= Izz =
-1260.8 KN-m
(1470/3)+(-1260.84*0.0155*0.975/0.039234375)+(0*0.0155*0/0.0442040625)
4.34
KN
(1470/3)+(-1260.84*0.0155*-0.975/0.039234375)+(0*0.0155*-1.125/0.0442040625)
975.66 KN
(1470/3)+(-1260.84*0.0155*-0.975/0.039234375)+(0*0.0155*1.125/0.0442040625)
975.66 KN
safe
Critical section along Y-Y direction :
Design of Beam DC :
Maximun column load 1/3 L from AB line
0.65 M
2L/3
1.3 M
L (3 /2)
Rd = 980 KN
0.75 m
KN
1.95 m
(1.732/2)*2.25
Max Reaction load of piles (unfactored)
Rc = 490 KN
=
1470 KN
637 KN-M
956 KN-M
0.76
0.22
20.00 mm
Area of Bar
314 sq mm
130 mm
125 mm
M xx =
(M u xx =
(490*1.3)
(1.5*637)
Mu / Bd^2
= (955.5/(1.05*1.095^2))
Ast = (0.22*0.75*1.09510^4)
=
1807
Sq mm
(314/1807)*0.75
Provided spacing
(0.548-0.395)
Shear stress (
= Vu /Bd
= (1.5*98010^3/1.05*1.095*10^6)
c (max)
shear stress
(100*1.05*1000/125*314)
=
0.548 M
Shear line with in pile
=
0.153 M
=
=
=
0.60 M
392
KN
980 KN
1.279 N/sq mm
3.5 N/sq mm
= 0.23
= 15
=
0.356 N/sq mm
(0.356*1.05*1.09510^3)
V us
(1.5*980-409.31)
409 KN
1061 KN
78.6 Sq mm
117 MM
980 KN
551 KN-M
827 KN-M
0.66
0.22
20
Area of Bar
314 sq mm
183 MM
Provided spacing
150 mm
976 KN
Spacing of stirrups
(0.87*415*78.55*4*1.095/1060.69)
10
mm
976 KN
Ra
2.25 M
unfactored moment
Factored moment
M xx =
(M u xx =
488 KN
Rb
(975.66*2.25/2)
(1.5*551.25)
Mu / Bd^2
= (826.875/(1.05*1.095^2))
Ast = (0.22*1.05*1.09510^4)
=
Shear stress (
shear stress
Sq mm
(314/1807)*1.05
= Vu /Bd
= (1.5*975.6610^3/1.05*1.095*10^6)
c (max)
1807
(100*1000/150*314)
mm
1.273 N/sq mm
3.5 N/sq mm
= 0.19
= 18
=
0.327 N/sq mm
(0.327*1.05*1.09510^3)
V us
(1.5*975.66-375.97)
376 KN
1088 KN
78.6 Sq mm
171 MM
Spacing of stirrups
(0.87*415*78.55*6*1.095/1087.52)
10
mm
= (1.095/2) m
1470 KN
8.62
1.095 m
0.16 N/sq mm
(KN)
2*((1.06+1.095)+(1.06+1.095))
Grade
TC = Ks Tc
Ks = 0.5+
= short side /long side
= (1.06/1.06)
Ks = (0.5+1)
1.5
Tc = 0.25 Fck
(0.25*sqrt30)
or
= 1.37 N/sq mm
Safe
20
MM
1.5 N/sq mm
752 MM
(1.095-0.05)
=
OK
1045