Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

P L A N T S E R V I C E S | 10

After Plant Assessment is done, we can help you executing turn around at your in a short sho period of shut down time to make reliability of operation.
TRACON Have experienced exceeds 10 Years in Plant turnaround, supported experienced engineer TRACON can provide exc excellent Turnaround with criteria criteria: High standard of HSE Good Working Quality Optimum Turnaround Cost Optimum Duration

EXPERIENCES : TURNAROUND SPG MERBAU PT. PERTAMINA EP REGION SUMATERA FIELD PRABUMULIH 2012 CLIENT : PERTAMINA EP , REGION SUMATERA

TURNAROUND CO2 REMOVAL CILAMAYA UTARA - 2007 CLIENT : PERTAMINA EP, REGION JAWA

TURNAROUND SPG MUSI BARAT EP REGION SUMATERA FIELD PENDOPO 2010 Tracon Turnaround urnaround services : Initiation Phase Period during which turnaro turnaround und parameter are defined, core personnel appointed and basic data organized. Can be spread over a period of months Preparation Phase Plant Assessment, Budgeting, Develop Team, Scheduling, Setting Target, Part Preparation Execution Plane Shutting the plant down ( removing inventory, inven decontaminating, cooling, iso-lating), Re-Inspection Inspection The Plant, Plant Install-ation New Items, Overhaul, Removal of redundant items, items Final QC inspection, Plant Testing ( Pressure Test, System Test, Trip and Alarm test, Plan Plant Clean n Up and Final Inspection ( Removing all Traces ) of Turnaround Termination phase Analyzing Performance, Reviewing work done done, Reporting. CLIENT : PERTAMINA EP REGION SUMATERA

PT. TRACON INDUSTRI


PARTNER IN SOLUTION WITH INOVATION
Rekayasa Office Complex, Jl. Kalibata Timur I, No.36, Jakarta 12740 Indonesia

www.tracon.co.id

You might also like