Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT. GRUNDFOS POMPA PT.

BRANTAS ABIPRAYA (Persero) JOINT VENTURE


Package C2: Semarang Pumping Station (Mechanical and Electrical Works)

OPERATION NOTIFICATION OF INSPECTION


NO. Location Work Item Reference Drawing Activity Joint Survey of Runway Beam Level Works Executed By, Grundfos-Brantas JV Representative Reference Documents : Accuracy Tollerance of Runway beam May 2013 Acknowledged By, Client Representative Satker PPLP - Jateng 003/GBJV-NOI/VI/2013 Pump House and Gate House DATE : 13 June 2013

Date of Inspection : Approved By, Oriental Consultant

Participant

Signature

Name Date To be attended by Inspection Result Inspection passed. The Contractor is allowed to proceed with the works Remedial works listed below to be completed and inspection is requiered after remedial works Remedial works listed below to be completed but no futher inspection is requiered Rejected Remarks / Comments : Syafiuddin Date: May 2013

Participant

Works Executed By, Grundfos-Brantas JV Representative

INSPECTED BY Approved By, Oriental Consultant

Acknowledged By, Client Representative Satker PPLP - Jateng

Signature

Name Date Syafiuddin Date: May 2013

You might also like