REFERENCED DRAWINGS
AB-036677 AB-036678 AB-036679 AB-036680
GENERAL GENERAL GENERAL GENERAL PURPOSE PURPOSE PURPOSE PURPOSE FENCING-GENERAL FENCING-POST & FABRIC DETAILS FENCING-GATE DETAILS FENCING-FOOTING DETAILS

GENERAL REVISION PER AES-M-006.

DESCRIPTION

REVISED SHEET NO. 005

REVISED AND REDRAWN.

NOTE :
ALL MATERIALS REQUIRED ARE LISTED ON SHEETS 002, 003 AND 004.
QUANTITIES FOR INSTALLATION OF THE VARIOUS POSTS, GATES AND FENCING ARE SHOWN ON SHEETS 005 THROUGH 008.

JO/EWO

RCR ESSD

ASC

ERC

GALVANIZED FABRIC AND HARDWARE SHALL BE FOR ALL IN-LAND LOCATIONS. VINYL-CLAD FABRIC, BARBED WIRE, TENSION WIRE, TIE WIRE AND GATE IN-FILLING SHALL BE SUBSTITUTED AT LOCATIONS WITHIN ONE AND ONE HALF KILOMETERS OF THE SEA, REFER TO PAGE 008.

BY

NO.

REVISIONS DRAWN BY DATE CHKD. BY

OPRG. DEPT.
BY DATE

ENG. DEPT.
BY DATE

APPD. FOR CONSTR.


BY DATE

CERTIFIED

10.18.86

NOV90

MAR90

DATE

BY DATE
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED.

MANDATORY DRAWING
DRAWING TITLE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

LIST OF MATERIAL FOR SAUDI ARAMCO TYPE V FENCING


STD. DWG. METRIC

990
JO/EWO-

AE-036904

001
of

008

03

CopyrightSaudi Aramco 2009. All rights reserved.