Max Up to 64 indoor units can be connected to a single refrigerant piping (40~54HP)
Simple system
VRV III
7.
Flexible in Design High Reliability Individual Control Central Control System Precise Room Temperature Control Automatic control for each Indoor unit Energy conservation
Daikin India Pvt. Ltd.
What is VRV?
Ideal for Random Occupancy and after office hours operation
VRV III
What is VRV?
Superior inverter control
100%
Capacity Control
VRV III
Smooth control
(36 HP)
5% Low
INV NON NON INV NON NON
Load
High
VRV comparison
VRV system is gaining popularity due to Air-cooled Heat Pumps The system's simplicity makes cool/heat changeover easy.
VRV III
VRV System
Simple Operation
FCU
Refrigerant piping
Remote controller
Complicated
Easy Operation
Daikin India Pvt. Ltd.
Introduction of
Contents
1. High energy efficiency 2. Precise temperature 3. Low Noise 4. Environment Friendly 5. Wide IDU/ODU units range 6. Key Features 7. Network Control systems 8. Operation strength 9. Few References 10. Esteem customers 11. Awards
Daikin India Pvt. Ltd.
Key Features
4.14 3.68 2.81 3.75 Smooth sine wave inverter High COP heat exchanger Efficient heat transfer circuit DC Inverter Scroll Compressor
2. Precise temperature
30
Room Temperature
25 20
15
10
20
30
40
50
60
70
Min..
Daikin India Pvt. Ltd.
3. Low noise
Nighttime quiet operation function
Capacity %
Automatic mode : Set on the outdoor PCB. Manual mode : Starting time and ending time can be input Combined mode : Combinations of modes 1 and 2 can be used
Max. Indoor temp
100 Capacity(%)
50
8Hours
Initial setting
10 Hours
Initial setting
Load(%)
0 58
Step 1: Max - 3 dB (A)
Night Mode
47
Step 2: Max - 8 dB (A)
Step 2 : 50dBA
Step 3 : 45dBA Night mode ends 4:00 8:00 * Based on 10HP model Daikin India Pvt. Ltd.
54
Step 1: Max - 13 dB (A)
4. Environment Friendly
Environment friendly refrigerant
Zero ODP and lowered GWP Of VRV III Title ODP (ozone depletion potential) GWP (Global warming potential) Level Zero 1,725
Remarks Save Ozone layer Less refrigerant quantity usage prevent warming
Daikin provide world first Round Flow Ceiling Mounted Cassette type which offers 360 airflow for more uniform cooling
Other Manufacturer 4-Way air discharge Hot pocket at corner Reduce effective air blast area No individual vane control
Daikin Cassette unit Round flow air distribution More even temperature distribution Area blast can be feel all round Individual vane control
Daikin India Pvt. Ltd.
Air flow direction control Separate vane motor to provide individual vane control Power saving by avoiding air flow to the not-occupied space
d) Standard Panel Size Panels are of same size in all the models
Same for all models
More symmetrical installation at office and big hall Less human error for panel selection
High lift drain pump to provide installation flexibility Transparent drain socket - easy to check the drain flow
33/31/29
34/32/30
39/37/35
41/39/37
42/40/38
43/41/39
44/42/40
46/45/43
Inbuilt drain pump to provide installation flexibility The Drain pan can be detached for cleaning
Range
8.75 ~ 16.5 TR
Maintenance can be completed in the mechanical room and does not interfere with office work.
c) Higher CFM
d) Other Features
Belt driven high static pressure type. Long duct length makes this unit versatile and useful.
HRV (VKM) series introduces fresh outdoor air with minimum heat losses, with multi features to respond various customer requirements.
Humidifier: Response to diversifying customer requirements (VKM50/80/100GAMV1) DX Coil: Contributes to prevent cold airflow affecting people directly during heating operation, due to after cool , after heat operations done before hand. High external static pressure: For Enhanced design flexibility
b) Interlocking Operation
*1 *2
Higher ODU capacity up to 54 HP, enhanced its suitability for large-sized buildings
Change to higher capacity: VRV II (48HP) => VRVIII (54HP) Available with 2HP incremental capacity to suit various requirement 7 base models to get different capacity combination
Series
Capacity Range (50Hz) 5HP 8 & 10HP 12 ~ 18HP 20~ 28HP 30 ~ 36HP 38 ~ 46HP 48 ~ 54HP
Outdoor Model
Heat Pump
6. Key features
Higher combination ratio
Outdoor unit cost saving by installing less use unit to same system
Note : If operation capacity of indoor units is more than 130%, low airflow operation is enforced in all indoor units. Cooling in all the indoor units will not be sufficient as 100% combination ratio. Daikin India Pvt. Ltd.
6. Key features
Easy indoor unit installation
Maximum elevation (outdoor to indoor unit) = 90m Farthest indoor unit can be connect at 165m distance
165m
90m
15m
6. Key features
High Energy efficiency
DC inverter scroll Compressor
Reluctance DC Scroll Compressor Neodymium Magnet High efficiency motor Low Sound Level Low Thrust Losses
Neodymium Magnet
Ferrite Magnets
6. Key features
High Energy efficiency
HIGH COP heat exchanger
Effective length of Heat exchanger increased from 7 to 10% Optimized e-pass heat exchanger
E-Pass Heat exchanger: Heat exchanger with new path arrangement in which cooling region and sub cooling region are separated, resulting in reduced heat loss.
6. Key features
Low noise and highly efficient fan operation
DC fan motor across the range (from 5 to 54 HP). Efficiency improvement by approximately 40% especially at low speed.
6. Key features
Duty Cycling of Compressors
Cycle start-up sequence by running time. Equalizes inverter compressor running time. Extended life of Inverter comp.
6. Key features
Aqua Shower (Water spray unit)
6. Key features
Aqua Shower (Water spray unit)
6. Key features
EPD Protects electrical parts from getting damage due to unwanted fluctuations and spikes at site.
Applicable model
Kit Name BRV4AP Power Supply Rating 3, 380-415V, 50Hz Applicable Unit VRV III (ODU)
16 groups (128 Indoors) can be controlled Backlight panel for easily readability Outside temperature display All Units turn on /Off button Weekly Schedule DCS303A51
Dot Matrix area shows which button to press next Large, Easy to read Liquid crystal display
Dio
+64
D 3 NET PLUS adapter
Di
D 3-NET
Indoor unit
Equipment
DIII-NET
*2
DIII-NET DIII-NET
Dio unit
adaptor required for connection with other equipment not compatible with DNET
Ai unit Light/Fan
Fire alarm
DIII-NET Remote PC Sub PC
Ethernet DMS502A51
DMS502B51
BMS
HRV
This system tunes the air conditioner according to customer's outdoor indoor location, operating conditions and day by day weather condition.
System overview
17 Weather data locations from India Spot forecast
Customer
Airnet Control Center Optimized (ACC)
energy saving setup Optimized energy saving setup
I-Manager
Operation data report (via phone line)
or
Operation data
I-Touch Controller
* Optional chargeable service
Data Analysis
Internet
Report
8. Operation strength
Project Title:
Drawing Check List Project name: Drawing Name: Drawing No. and Revision: Sl Check Points No. 1 a) b) c) d) e) f) g) h) 2 a) b) c) 3 a) b) c) d) 4 a) b) i) ii) iii) c) 5 a) b) c) d) e) f) g) Copper Pipe Lay Out i) Piping Length between ODU and Farthest IDU 165 m SNo. 6.5 page 657 SNo. 6.5 page 657 SNo. 6.5 page657/658 SNo. 6.5 page 657 SNo. 6.5 page 657 SNo. 6.5 page 657 SNo. 6.5 page 657 SNo. 6.5 page 657/658 SNo. 6.5 page 657 +KHRP26M73HP +KHRP26M73HP SNo. 6.5 page 657 SNo. 6.5 page 657/658 Reference Topic & Page of ED34- Yes 645B Date:
Project Location
Tel Tel
DAIKIN's Information
Condition
No
Remarks
Tel: Tel:
CONTENT
1. 2 3
CHECK LIST
Proper uniform Provision of safety equipments,(Protection against back fire) Designated area for placement of tools? Equipped with specific tools for specific purpose Equipped with A/C piping diagram, construction drawing. Are the unpacked units placed in the upright position Are the foundations laid for outdoor units according to DAIKIN's installation guideline? Are the outdoor units secured with bolts and protected with vibration isolation pad ? Are the equipments placed above the ground? (Copper tubes) Are the tools placed in a dry and clean area? Copper tube and insulation material according to DAIKIN's specification? Are the supporting rods fully threaded? Are Cu pipes cleaned with ACETONE prior to install? Are the refrigerant pipes installed in a horizontally straight manner? Are proper cutting tools used to cut copper tubes? After cutting or cleaning, are the copper tube ends sealed,pinched or taped immediately? During brazing, was nitrogen gas implaced? Was swaging and flaring tools used ? Flare nuts and flare joint used? Care should be taken not to cooloff Brazed joint immediately After a Refnet connection, were the tubes bent immediately? Were the correct tools used for bending? (manual bender/ electric bender) Refrigerant pipe support interval? For 6.4mm~19.1mm dia meter? For 22.2mm~41.3mm dia meter? Extra supports been provided at Refnet's and elbows? Was flushing executed with nitrogen gas? Vacuum pump used to remove air before pressure testing? Did you pressurise the pipe with Nitrogen for 24 hrs to check for leaks? Was vacuum pump used for vacuumising the system? DAIKIN's refnet joint and header used? Pipe length between outdoor unit and indoor unit? Weather all refnet connection laid horizontally plain? Equivalent Length (joint=0.5m, header=1.0m) Total Piping Length Outdoor branch to outdoor unit Height between outdoor and indoor units Height difference between Indoor units Height between outdoor units Pipe length from 1st refnet branch (header/joint) to farthest indoor unit Proper marking (ribs) on ducts are provided in case of site farication. Check for Sheet gauge as per duct size for IS:655 or SMACNA which ever is applicable. Nitrile rubber gasket min 3mm to be used at the flange and not the insulation material Canvass is used between IDU and Duct piece. The same is not streched Dampers are provided in Supply air collars There is no gap between grille/ diffuser and duct connection Checks for fresh air intake gaps above the celing Air tight partition above ceiling for Retrun Air between different IDU's in case feeding different areas Supply air duct is insulated Aspect ratio of rectangular duct is not more than 1:4 Guide vanes in bends and supply air collars is provided Control damper, bellow type e.g. Aldes, to be used for fresh air control at the IDU Common Plenum not used in case of Ductable units Pitch of nut, bolt on flange is maintained properly MS angle flange provided Bracing at duct center provided Duct Support interval
STANDARD
Safety Belt;Shoes;Helmet Fire extinguisher, Cylender regulator Clean; Dry
CHECK
REMARKS
ii) Equivalent Piping Length (Assume Refnet eqivalent length to be 0.5 m 190 m and Refnet Header to be 1.0 m) Equivalent Piping Length between Outdoor and first refrigerant branch Condition in ED book to be met 90m Total Pipe Length from ODU to all IDU 1000 m i) Piping between ODU and ODU multiconnection Piping kit ii) Equivelent Piping length i) Piping Length from first Refnet Branch kit to Farthest IDU ii) Piping Length from first Refnet Branch kit to Farthest Refnet joint 90 m Refnet Header Selection i) 250 CI type IDU not below Header ii) For Capacity 640 Refnet Header iii) If Pipe Size above Refnet Header is 34.9 mm Refnet Joint Selection i) For Capacity 640 Refnet joint Pipe Size as per IDU capacity index Pipe Size as per ODU capacity index Route of Refrigerant Piping meeting all the above conditions Drain Pipe Slope Size at Indoor Unit Connection Cassette Slim type Wall mounted type Clear identification of Drain termination Indoor Unit Selection For Residential application Ductables based on the duct lengths Location based on Throw of Unit Location based on air distribution Return Air Passage Service space Trap Door Size Supply/ Return passage 32 mm dia min 26 mm dia min 18 mm dia min 1:100 min +KHRP26M73TP 10 m 13 m 40 m Condition in ED book to be met
4 5 6 7 8 1. 2.
DAIKIN's Information Total Number of Outdoor Units Total Number Of Indoor Units 1) Remarks 2)
Installation Date
> 300mm
CHECK LIST
Yes
No
REMARKS
Area of Equipment
3. 4. 1 2 3 4 5 6 7 8 9 10 a
Equipment Configuration with Sl No. as Annexure I Warranty Details and scope (Copy of document from Contract and intimation letter to customer) Drawing of Piping and wiring layout All ODU and IDU are placed and fixation is done Service space provided for access to IDU and ODU Flushing of Copper tubes and Pressure test with Nitrogen at 580 PSI (40 kg/sqcm) for 24 hrs Vacuum Test for 2 hrs report Extra Gas Calculation as Annexure II Checking of Control Wires (F1F2, P1P2 & Q1Q2) with wiring check kit Dedicated Power supply at IDU (22010%) and ODU (380~41510%) unbalance 2% Protection against neutral failure Drain pipe tested for Slope and Leaks Cleaning of Indoor and Outdoor Units Is the place clean and ready for commissioning MCB selected as per Maximum Fuse Amps (MFA) mentoined in ED book. Should not be more than the MFA rating. Cable is selected on the basis of TOCA/ MCA and only copper cable is selected.
0.2~0.3kgf/cm2
4 5
> 500mm
6
1m 1.5m
7 8
SNo. 6.5 page 657 SNo. 6.5 page 657 SNo. 6.5 page 657
b 11
12 13 14 15 16 17 18 19
9 10 11 12 13 14 15
<165m
<190m <1000m <10m <50m ; 40m (if outdoor is lower) <15m <5m <40m Cross with in 1 m 26 G to 18 G As per the flange width (25mm/ 32 mm) 150~200 mm
SNo. 10, page 130 SNo. 10, page 130 SNo. 10.2, page 176 Sno. 10, page 295
20 21 22 23 24 25 1 2 3 4 5 6
16
17 Copper Cable is terminated at ODU. (Incase Aluminium cable is used as main cable, use breaker near the ODU and use Copper cable from out put to ODU termination point). Cable termination at VRV with lugs/ thimble. ELCB is being used. External Phase reverse protection is being used. Time gap between Local supply/DG supply/Other supply changeover and vice versa. ( 20 sec)
7 8 9 10 11 12 13 14 15 16 17
18
At each IDU Separate duct recommended 100~125 mm ducts above 1000 mm 25 mm up 1500 40 mm above 1500 2400 mm
19 20 21 22
Site audits
Check lists
(Drawing, Installation, SVC)
Dealer trainings
Daikin India Pvt. Ltd.
8. Operation strength
With our global customer support system, we are offering services that satisfy our customers all over the world.
Along with the activation of our global air conditioning business, Daikin has established service centers in various countries around the world, and is strengthening its support system.
9. Few References
Sl. No. 1 2 3 4 5 6 7 8 9
Project name
Eon Software Park Infosys Technologies Essar Tech Mahindra software Saluja Construction Mahindra Research Valley Pearl gateway Surya Educational Trust Linear Appt.
Location
Pune All India All India Pune & Chandigarh Delhi & NCR Chennai NCR Chandigarh Pune
10
Persistent Software
Pune
1,200
70
9. Few References
Project Name
Location
Pune, India
BLD Type
Official Building
Aircond. Qty
Uniqueness
SEZ Special Economic Zone project => VRV Biggest project Appreciation letter from customer for installation and project management
9. Few References
Project Name
Infosys
Location
All India
BLD Type
Aircond. Qty
Uniqueness
Mainly using cassette type for fast installation. Appreciation letter from customer for fast installation and project management.
9. Few References
Project Name
Location
BLD Type
Official Building
Business Segment
Aircond. Qty
Uniqueness
Office projects in major cities in all over India. Appreciation letter from customer for installation and project management
9. Few References
Project Name
Tech Mahindra
Location
BLD Type
Official Building
Aircond. Qty
Uniqueness
Mainly using cassette type for fast installation. Appreciation letter from customer for fast installation and project management.
Daikin Air-conditioning systems are used throughout the world in environments of extreme heat or cold climatic conditions.
Location: Singapore
Client: Key Point Tower Total floor area : 34,900 ODU: 255 Units
Location: Malaysia Client: Goldhill Plaza Project Type: Office Total floor area : 34,200 Floors: 36 ODU: 178 Units
The Comfort Category of Smacnas 2004 Years Distinction Award. National Important New Product Award in China. Residential Multi Air Conditioner Recommended Product for New Houses in Shanghai. 2004 Home Appliance Market Best 10 Brand in Shanghai.
The Global 100 is a list of publicly-traded companies based on research and analysis on 1,800 companies. Those companies are deemed to have the best developed abilities, relative to their industry peers, to manage environmental, social and governance risks, and to take advantage of new business opportunities.
GICS Sector Consumer Discretionary Consumer Staples Energy Financials Health Care Industrials Information Technology Materials Telecommunication Services Utilities Total Global 100 16 9 7 16 7 17 9 10 3 6 100 Country Australia Canada Denmark Finland France Germany Italy Japan Netherlands Norway Spain Sweden Switzerland United Kingdom United States Total Global 100 3 5 3 5 8 7 2 15 1 1 3 5 3 19 20 100
Introduction of
Contents
1. Concept of VRV WIII
2. High efficiency
3. Space saving 4. Wide operation range 5. Wide IDU/ODU range 6. Network Solution 7. Reference Projects
Water cooled VRV III is an individual air conditioning system that utilizes water
as a heat source. In this system, water is piped from a cooling tower or boiler to the heat exchange, refrigerant is piped from the VRV-WIII to each indoor unit.
Cooling tower
2. High efficiency
Cooling Heating
Key Features
Water cooled based Outdoor DC Inverter Scroll Compressor
3.54
Air Cooled
* Based on 10HP model
Water Cooled
3. Space saving
Less foot print area
Less floor space required as compare to A/C System Can be place in remote area like store room
10HP model foot print area
30 25 20 15
Allowable operating range
10 10
15
20
30
Series
Capacity Range 8HP 10HP 16HP 18HP 20HP 24HP 26HP 28HP 30HP
Outdoor Model
Cooling only
50Hz
Dio
+64
D 3 NET PLUS adapter
Di
D 3-NET
Indoor unit
Equipment
DIII-NET
*2
DIII-NET DIII-NET
Dio unit
adaptor required for connection with other equipment not compatible with DNET
Ai unit Light/Fan
Fire alarm
DIII-NET Remote PC Sub PC
Ethernet DMS502A51
DMS502B51
BMS
HRV
7. Reference Projects
LEED certified Platinum rating
Project Name
Location
Pune, India
BLD. Type
Official Building
G+ 3 Floor
Aircond. Qty
Application
Green building project => Platinum rated building 1st Reference Site of VRV WIII Awarded appreciation letter by customer
7. Reference Projects
LEED certified Platinum rating
Project Name
Suzlon
Location
Pune, India
BLD. Type
Official Building
8 Blocks, 32 Floor
Aircond. Qty
Uniqueness
Green building project => Highest Platinum rated building in India Appreciation letter from customer for installation and project management
Location : Istanbul, Turkey A/C equipment : ODU: RWEYQ 280units IDU: FXFQ 1800 units Completion: 2006 Application: Office Structure : 34-story Construction : New
2240 RT
Daikin India Pvt. Ltd.
Location : San Paulo, Brazil A/C equipment : ODU: RWEYQ10 350 units Completion : 2008 Total floor area : 80,000m2 (32-storey) Application : Office Construction type: New
2800 RT
Introduction of
S
Contents
1. VRV III S concept 2. Easy connect-ability 3. Energy efficiency
4. Space saving
5. Wide operation range 6. Indoor units
Application : Residences & Small Offices
Daikin India Pvt. Ltd.
VRV III S
2. Easy connect-ability
High Indoor connect-ability & piping
VRV III S
ODU Models : 4, 5, 6 HP
Maximum 9 indoor units for 6HP Maximum 8 indoor units for 5HP Maximum 6 indoor units for 4HP
Maximum elevation (outdoor to indoor unit) = 50m Maximum total piping length = 300m
3. Energy efficiency
High Energy efficiency
Efficient Compressor
Reluctance DC Scroll Compressor Neodymium Magnet High efficiency motor Low Sound Level Low Thrust Losses
Neodymium Magnet
VRV III S
10 times strong
Ferrite Magnets
3. Energy efficiency
3. High Energy efficiency
Efficient Outdoor fan motor
VRV III S
DC fan motor for all models. Efficiency improvement by approximately 40% especially at low speed.
4. Space saving
Floor Space saving
The VRV III-S acquires less volume and foot print area. Ideal design for balcony installation in minimum space.
VRV III S
VRV III S
460C DB
40 30 20 10 0 -10 20
15.50C WB
10 0 -10
-20
VRV III S