Professional Documents
Culture Documents
CHP DPR 14 - 09 - 10
CHP DPR 14 - 09 - 10
I. Manpower Details:Sl.No Description 1 Supervisor 2 Fabricator 3 Fitter 4 5 6 7 8 Welder Rigger Grinder Gas Cutter Helpers Fabrication 3 1 7 8 16 4 4 17 Date :14.09.10 Sand Blasting
9 Blaster 10 Painter Total Manpower II. Machinery:Sl.No Description 1 Welding M/C Rectifier 2 Welding M/C Transformer 3 Piller Drilling Machine 4 Magnetic Drilling Machine 5 Pug Cutting Set 6 7 8 9 10 Cutting Set AG7 Grinding Machine Jim Screw Hydra Crane Mother Oven
60 Qty 7 3 1 1 1 4 3 2 3 1 2 Prev.Qty 4587 119.52 133.69 6500 152 235 142 7412 63.6 2636 1554.96 3 24 2 24 24 4 24 13 19 1 4 1 5 12 11 3 Current Qty Current Qty
4 1 2 7 Cum.Qty 7 3 1 1 1 4 3 2 3 1 2 Cum.Qty 4587 119.52 133.69 6500 152 235 142 7412 63.6 2636 1554.96 3 24 2 24 24 4 24 13 19 1 4 1 5 12 11 3 Units Sets MT MT Mtrs Nos Nos Nos Mtrs MT Nos MT Nos Sets Sets Nos Nos Nos Nos Nos Drums Nos Nos Nos Sets Boxes Nos Nos
67
11 Sand Blasting M/c III. Bought Out Items:Sl.No Description 1 Idlers 2 Tech.Structure 3 Chute with Liners 4 Pull cord Rope 5 Belt Sway Switch 6 Pull cord Switches 7 8 9 10 11 12 13 14 15 16 Pulleys Conveyor Belts Rails Foundation Bolts Raw Steel Geared Motor Skirt Board Tripper Structure Internal Scrapper External Scrapper
17 Crusher 18 Plumber blocks (Spares) 19 20 21 22 23 24 25 26 27 Flap Gate Electrical Cable Vibrating Screen OBMS ILMS Wheel & Axle Rotating Actuator Vibrating Hopper Metal detector
28 Bunker levels sensors 29 Control junction box 30 Motors 31 32 33 34 35 36 37 38 39 40 41 42 43 44 RP Gate Gratings Belt weigher GC Sheets G.I Cable Earthing Flat Speed limit switch Electrical Linear actuator Gear Box High speed coupling Geared coupling Zinc Chrome paint Micacious Iron oxide Flip flow Screen
1 6 33 12 55.12 3 25.44 1 2 22 17 23 15 11 800 800 4 3200 600 3 1 2 1 12 178 3 5.5 2 Drg.Qty Prev. 102.5 22.381 30.009 263 77 62.08 245.297 37.298 30 340 68 28 106.89 35.16 1.29 4.63 12.40 16.579 48.740 8.786 4.617 21.557 7.206 1573.414056 86 22 30 263 77 62 245 37 26 333 58 23 68.00
Lot Boxes Nos Nos MT Nos MT Drum Lot Nos Nos nos nos nos Lit Lit Nos Mtrs Mtrs Nos No No lot Nos Mtrs Nos MT Lot Fitup Completed Curr. Cum. 86 21 30 258 77 62 241 31 22 319 47 21 34 Welding Completed Curr. Cum. 80 20 26.5 258 77 62 203 29 18 283 36 20 21 2 nos Crusher Fluid Coupling
45 Cable Trays 46 Wire rope 47 Pump with Accessories Stacker & Reclaimer :1 Roller Bearing with sleeve 2 Motorised CRD 3 Dual line lubrication system 4 Idle wheel bogie 5 Conveyor Belts 6 Hydralic Motors 7 Walkway Material 8 Boom part IV. Fabrication Details:Sl.No Units 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 BC 2A/B BC 3A/B BC 4A/B BC 5A/B TH-1 TH 2 TH 3 TH 4 TH 5 Crusher House SCH (LS) PCH (LS) BC 6A/B BC 7 BC 8 BC 9 YC 1 OBMS Stacker Shed YC HGTU LCB 1 LCB 02 LCB 03 Total Qty
1330
1333
1247
1249
1129.5
1133.5
Rejected 0
Remarks
VI.Paint Consume :Sl.No Description 1 Zinc Chrome Primer 2 Micaseous Iron oxide Paint VII. Remarks:1 2 3 4 5 6 7 8
Consmable
Remarks
1 2 3
BC 5A/B - Trestle TR 1 , 2, 3A/B,4 , TR 5,TR6 Alignment completed BC 5 A/B - Gallery GR 2 A - 5 no erection completed. TH-2 Column Alignment Completed