DIVISION 1 - GENERAL REQUIREMENT SECTION 01050 - FIELD ENGINEERING PART 1 - GENERAL 1.01 CONTRACTOR'S Duties 1. 2. 3. 4. 5. 1.

02 Check grades, lines, levels and dimensions shown on the Drawings and verify all Site conditions. Report promptly to Company Representative in writing, any errors, inconsistencies or omissions and receive clarification before beginning WORK. Assume responsibility for correctness of all grades, lines, levels, dimensions and location of all constructed facilities. Assume responsibility of providing and coordination of Related Work required to make the WORK in applicable Sections complete. Be responsible for encroachments on rights of all other property owners.

CONTRACTORS Engineer A. Provide a qualified engineer, subject to approval of Company Representative, to perform the following: 1. 2. 3. 4. 5. B. Locate building lines and levels and assure correct location and elevations. Establish grades, locate curbs, walk and paved area lines, levels and centers. Verify boundary lines. Locate trenches. Provide other layout work required to complete contract WORK.

Employ engineers continuously on WORK during entire period during which grades, lines, levels, dimensions and locations are needed for construction of the WORK. Keep a complete control log of WORK as it progresses. available to Company Representative. 1. 2. Keep log for footing depths. Keep log of utility installation locations and depths. SECTION 01050 Keep log readily

C.

CONSTRUCTION SPECIFICATIONS

DOC

SABG GIRLS ELEMENTARY SCHOOL AND BOYS INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF

089/ 090

A 2050

BE-315756

1 of 2

1.03

Batterboards and Bench Marks A. B. C. Provide and maintain well-built batterboards at corners and offsets of buildings. Establish and safeguard bench marks in at least two widely separated places and set permanent properly marked bench marks at WORK completion. As WORK progresses, establish bench marks at the floor level. Exercise care in laying out WORK to keep within the property line.

1.04

Layout Data A. Record layout data and changes from Contract Drawings on "Project Record Documents".

1.05

Certification CONTRACTOR and CONTRACTORS Engineer: Certify that grades, lines and levels, and layout data as submitted are complete and accurate. END OF SECTION

SECTION 01050