Snow Load Span Eaves Height Roof Pitch Frame Spacing Required Cross-Section (KN/M ) (M) (M) (°) (M) Column Rafter
Snow Load Span Eaves Height Roof Pitch Frame Spacing Required Cross-Section (KN/M ) (M) (M) (°) (M) Column Rafter
Snow Load Span Eaves Height Roof Pitch Frame Spacing Required Cross-Section (KN/M ) (M) (M) (°) (M) Column Rafter
Snow load
Span
Eaves
height
Roof pitch
Frame
spacing
[kN/m]
[m]
[m]
[]
[m]
Column
Rafter
30.0
6.0
6.0
5.0
IPE 600
IPE 550
25.0
6.0
6.0
5.0
IPE 500
IPE 500
20.0
6.0
6.0
5.0
IPE 450
IPE 450
15.0
5.0
6.0
5.0
IPE 360
IPE 360
12.0
4.0
6.0
5.0
IPE 300
IPE 300
30.0
6.0
6.0
5.0
HEA 500
HEA 500
25.0
6.0
6.0
5.0
IPE 600
IPE 550
20.0
6.0
6.0
5.0
IPE 500
IPE 500
15.0
5.0
6.0
5.0
IPE 450
IPE 450
12.0
4.0
6.0
5.0
IPE 360
IPE 360
30.0
6.0
6.0
5.0
HEA 650
HEA 650
25.0
6.0
6.0
5.0
HEA 550
HEA 550
20.0
6.0
6.0
5.0
IPE 600
HEA 600
15.0
5.0
6.0
5.0
IPE 500
IPE 500
12.0
4.0
6.0
5.0
IPE 400
IPE 400
0.75
1.20
2.00
Roof pitch
Apex
03
Required
cross-section
Table 3.1
Pre-design table
for portal frames
Figure 3.2
Figure 3.3
Figure 3.4
Rafter
Eaves
Apex haunch
Eaves haunch
Column
Mezzanine
Mezzanine
EURO-BUILD in Steel
17