Professional Documents
Culture Documents
IWCF Kill Sheet Rev
IWCF Kill Sheet Rev
MAX. ALLOWABLE DRILLING FLUID DENSITY = (B) (A) 0.052 x SHOE TV DEPTH INITIAL M.A.A.S.P = ((C) - CURR. DENS.) x SHOE TVD x 0.052 .= MUD PUMP OUTPUT PUMP # 1 DISPL. PUMP # 2 DISPL. PUMP #3 DISPL HOLE DATA SLOW PUMP RATES SLOW PUMP RATE SPM SPM PRE-RECORDED VOLUME DATA
DRILL PIPE HEVI WATE DRILL COLLAR DRILL STRING VOLUME D/C x OPEN HOLE D/P HWDP x OPEN HOLE OPEN HOLE VOLUME D/P x CASING TOTAL ANNULUS VOLUME TOTAL WELL SYSTEM VOL ACTIVE SURFACE VOLUME TOTAL ACTIVE FLUID VOLUME
(C) =
PPG
0.06119 BBL / STK 0.06119 BBL / STK 0.06119 BBL/STK SIZE M. DEPTH T.V. DEPTH PSI PSI CAPACITY BBL/FT 0.01442 0.008833 0.007 (D) 0.0291 0.0505 (F) 0.0576 (F+G)=H (D+H)=I J (I+J) VOLUME BBL PUMP STROKES #1 #2 #3 #1 TIME MIN: #2 #3 PUMP # 3 IN FT FT
PUMP # 1
Terry Smith
1BBL = 42 US GAL.
SIDPP TVDx.052 .. ..x .052 = PPG SIDPP TVD
PSI/FT
INITIAL CIRCULATING PRESSURE .ICP. FINAL CIRCULATING PRESSURE . FCP. FINAL CIRCULATING PRESSURE . FCP.
.+..= KILL FLUID DENSITY CURRENT DRILLING FLUID DENSITY ..x....= KILL FLUID DENSITY CURRENT DRILLING FLUID DENSITY ..x....=
PRESSURE REDUCTION
2000 1800 1600 1400 1200 1000 800 600 400 200 0
FORMATION STRENGTH DATA SURFACE LEAK-OFF PRESSURE FROM FORMATION STRENGTH TEST (A) DRILLING FLUID DENS. AT TEST (B)
0 PSI DRILLING FLUID DATA DENSITY 0 PPG GRADIENT 8.6 PPG 0.4472 PSI/FT
MAX. ALLOWABLE DRILLING FLUID DENSITY = (B) + (A) 0.052 x SHOE TV DEPTH INITIAL M.A.A.S.P = ((C) - CURR. DENS.) x SHOE TVD x 0.052 .= MUD PUMP OUTPUT PUMP # 1 DISPL. 0.046 BBL/STK SLOW PUMP RATES RATE DATA 40 60 PRE-RECORDED VOLUME DATA
DRILL PIPE HEVI WATE DRILL COLLAR DRILL STRING VOLUME D/C x OPEN HOLE D/P HWDP x OPEN HOLE OPEN HOLE VOLUME D/P x CASING TOTAL ANNULUS VOLUME TOTAL WELL SYSTEM VOL ACTIVE SURFACE VOLUME TOTAL ACTIVE FLUID VOLUME
(C) =
0.00 PPG
CASING & SHOE DATA -366.70 PSI SIZE M. DEPTH T.V. DEPTH 20 820 820 IN FT FT
PUMP # 2 DISPL. 0.0698 @ PUMP # 1 180 300 PUMP # 2 PSI ### PSI ### LENGTH FT 1879.8 365.82 543.38 (D) 543.38 1425.62 (F) 820 2789 (D+H)=I J (I+J) 169.180 3677.82 2424### ### 0.0576 (F+G)=H 0.0291 0.0505 CAPACITY BBL/FT 0.01442 0.008833 0.007 PSI PSI VOLUME PUMP STROKES TIME BBL # 1 STKS ##21 MINUTES # 2 ### ### ### ### ### ### ### ### ### ### BBL/STK HOLE DATA SIZE M. DEPTH T.V. DEPTH 17 1/2 IN 2789 FT 2789 FT
27.107 589.276 388.35### 3.231 70.2454 46.294### 3.804 82.6883 54.494### 34.142 742.21 489.14### 1031### 1258### 1935### 2424### 15.812 343.747 226.54### 71.994 1565.08 87.806 1908.83 135.038 2935.61 169.180 3677.82
1BBL = 42 US GAL.
..+
PPG
..+
PSI/FT
ING
ING
KILL FLUID DENSITY CURRENT DRILLING FLUID DENSITY ..x....= KILL FLUID DENSITY CURRENT DRILLING FLUID DENSITY ..x....=
ING
CP- FCP=.-..=.PSI
PRESSURE STROKES #1 580 534 488 442 396 349 303 257 211 165 119 73 238 400 346 292 238 184 131 77 23 -31 -85 -139 -193 0 0 100 200 300 400 500 600 700 800 900 1000 1100 742 #2
PRESSURE 580 534 488 442 396 349 303 257 211 165 119 73 238 0.00 0.00 400 346 292 238 184 131 77 23 -31 -85 -139 -193 0 0 0
STROKES 0 100 200 300 400 500 600 700 800 900 1000 1100 742 0 0
M.A.C.P
Page 6
M.A.C.P
Page 7
M.A.C.P
Page 8
M.A.C.P
Page 9