Beneficiar: Executant: Proiectant: Obiectivul: Obiectul: Stadiul fizic:

realizari muncitori aprilie Nume grinzi Nume

Formular F3 Lista cu cantitati de lucrari pe categorii de lucrari

SECTIUNEA TEHNICA

SECTIUNEA FINANCIARA Pretul unitar (fara TVA) - Lei 4 TOTALUL (fara TVA) - Lei 5=3x4

Nr. 0

Capitol de lucrari 1

U.M. 2

Cantitatea 3

1 CB01XA - Cofraje din scinduri de rasinoase pt.turnare bet. de monolitizare intre elem.prefabricate(plansee,gr

mp

160.00 material: manopera: utilaj: transport:

28.90 12.10 16.80 0.00 0.00 13.06 1.21 11.60 0.25 0.00 3.80 0.44 3.36 0.00 0.00 76.81 4.81 72.00 0.00 0.00 22.00 0.00 22.00 0.00 0.00

4,623.54 1,935.54 2,688.00 0.00 0.00 2,089.70 193.22 1,856.00 40.48 0.00 265.79 30.59 235.20 0.00 0.00 153.62 9.62 144.00 0.00 0.00 660.00 0.00 660.00 0.00 0.00 7,792.65 1,870.23 9,662.88

2 CB09XB - Sustineri din elem.schela met.tub.pt.cofr.plans.cusarc.pe cof.celmul 100dan/mp h 20m,h sust.3-6 m in

mp

160.00 material: manopera: utilaj: transport:

3 CB47C1 - Schela metalica tubulara lucrari de finisaje la tavane si lucrari de monolitizari a prefabricatelor de beton armat, amplasate la inaltimi pina la 7 m inclusiv;

mp

70.00 material: manopera: utilaj: transport:

4 RPCU09E# - Transport cu scripete,incl Montare Demontare schelet,incarcare,descarcare (primii 5 m)

tona

2.00 material: manopera: utilaj: transport:

5 RPCU09C-13# - Transport < 50kg,prin purtat direct la 60 m (urmatorii 30m orizontal sau 3m vertical) (corectie)

tona

30.00 material: manopera: utilaj: transport:

TOTAL GENERAL (fara TVA) TVA (24.00%) TOTAL GENERAL (inclusiv TVA)

Director

Sef proiect

Ofertant

Deviz "grinzi" - Formular F3