Deep Footing Design Based On ACI 318-08: Input Data
Deep Footing Design Based On ACI 318-08: Input Data
CLIENT :
JOB NO. :
PAGE :
DESIGN BY :
REVIEW BY :
DATE :
c
L
=
=
60
18
in
ft
Df
10,5
ft
FOOTING THICKNESS
WATER TABLE
T
h
=
=
22
8
in
ft
CONCRETE STRENGTH
fc'
ksi
fy
60
ksi
PDL
73,1
PLL
50
=
=
MLAT
120
ft-k, SD
VLAT
11
k, SD
SURCHARGE
qs
0,1
ksf
ws
0,1
kcf
Qa
ksf
#
#
4
10
10
spiral @
22
#
1
Seismic,SD
-79,175 k, SD, uplift
vertical
3
in o.c.
DESIGN SUMMARY
TOP FOOTING REINF., E. WAY =>
BOT. FOOTING REINF., E. WAY =>
2 # 10
13 # 10 @ 17 in o.c.
ANALYSIS
DESIGN LOADS AT TOP OF FOOTING (IBC SEC.1605.3.2 & ACI 318-08 SEC.9.2.1)
CASE 1:
DL + LL
P
=
123 kips
CASE 2:
DL + LL + E / 1.4
P
=
67
kips
M
=
154 ft-kips
V
=
8
kips
e
=
2,3 ft, fr cl ftg
CASE 3:
0.9 DL + E / 1.4
P
=
9
kips
M
=
154 ft-kips
V
=
8
kips
e
=
16,7 ft, fr cl ftg
1.2 DL + 1.6 LL
1.2 DL + 1.0 LL + 1.0 E
0.9 DL + 1.0 E
CHECK OVERTURNING FACTOR (IBC 09 1605.2.1, 1808.3.1, & ASCE 7-05 12.13.4)
MR / MO =
Where MO =
4,20042
>
1 / 0.9
[Satisfactory]
948
Pftg =
wsat =
ws + 0.018 kcf =
wwater =
k-ft
114,63 k, footing weight
Psoil =
MR =
3982
k-ft
7,51183
>
- PLAT = 79,2
1,0
[Satisfactory]
Pftg =
114,63
k, footing weight
Psoil =
407,02
594,75 k
254,75 k, soil wt
Pu
Pu
Mu
Vu
eu
Pu
Mu
Vu
eu
=
=
=
=
=
=
=
=
=
168
59
215
11
3,7
-13
215
11
-16,1
kips
kips
ft-kips
kips
ft, fr cl ftg
kips
ft-kips
kips
ft, fr cl ftg
(cont'd)
CHECK SOIL BEARING CAPACITY (ACI 318-08 SEC.15.2.2)
Service Loads
P
e
CASE 1
123,1
0,0
CASE 2
66,5
2,5
qs L2
32,4
32,4
0,0
k, (surcharge load)
Pftg
P
38,2
193,7
38,2
137,2
34,4
43,6
k, (footing increased)
k
M
e
0,0
0,0
250,7
1,8 < L/6
250,7
5,7 > L/6
qmax
0,6
0,7
0,5
ksf
qallow
4,0
5,3
5,3
ksf
< L/6
CASE 3
9,2
18,2
6e
( P ) 1 + L
, for e L
6
q max =
L2
2 ( P )
L
, for e >
6
3L (0.5L e )
Where
k
ft, (from center of footing)
[Satisfactory]
6eu
( Pu ) 1 + L
L
, for
eu
2
6
q u ,max =
L
2 ( Pu )
L
, for eu >
6
3 L (0.5L eu )
MAX =
'
Mu
0.85 f c 1 1
'
0.383bd 2 f c
=
f y
fy
Pu
0.85 1 f 'c
u
u +t
T
4
,
d
3
CASE 2
CASE 3
58,5
-13,4
0,0
4,0
-17,6
51,8
32,4
0,0
443,3
443,3
332,4
Pu
662,8
534,2
319,1
Mu
0,0
eu
0,0
eu
qs L2
Pu,ftg & fill
351,0
< L/6
0,7
2,046
qu, max
k
ft, (at base, including V u T / Pu)
k, (factored surcharge load)
k, (factored footing & backfill loads)
k
351,0
< L/6
1,1
2,010
ft
1,346
1,63
3,25
4,88
6,50
Mu,pedestal (ft-k)
ksf
ColR
001 L
001 L
001 L
11,50
13,13
14,75
16,38
18,00
Vu,pedestal (k)
0,0
0,0
0,0
0,0
167,7
167,7
167,7
167,7
Pu,surch (klf)
2,88
2,88
2,88
2,88
2,88
2,88
2,88
2,88
2,88
2,88
Mu,surch (ft-k)
-3,8
-15,2
-34,2
-60,8
-190,4
-248,1
-313,3
-386,1
-466,6
167,7
Vu,surch (k)
4,7
9,4
14,0
18,7
33,1
37,8
42,5
47,2
51,8
24,63
24,63
24,63
24,63
24,63
24,63
24,63
24,63
24,63
24,63
-2121
40,0
80,0
120,0
160,1
283,2
323,2
363,2
403,2
443,3
2,05
2,05
2,05
2,05
2,05
2,05
2,05
2,05
2,05
qu,soil (ksf)
2,05
Mu,soil (ft-k)
Vu,soil (k)
Mu (ft-k)
12,3
49,2
110,7
196,8
196,8
110,7
49,2
12,3
Vu (kips)
-15,1
-30,3
-45,4
-60,6
60,6
45,4
30,3
15,1
(cont'd)
FOOTING MOMENT & SHEAR AT LONGITUDINAL SECTIONS FOR CASE 2
ColL
0
000 L
000 L
000 L
Section
ColR
001 L
001 L
001 L
1,63
3,25
4,88
6,50
11,50
13,13
14,75
16,38
18
Mu,pedestal (ft-k)
204,64
109,5
Vu,pedestal (k)
0,0
0,0
0,0
0,0
58,5
58,5
58,5
58,5
58,5
Pu,surch (klf)
1,80
1,80
1,80
1,80
1,80
1,80
1,80
1,80
1,80
1,80
Mu,surch (ft-k)
-2,4
-9,5
-21,4
-38,0
-119,0
-155,0
-195,8
-241,3
-291,6
Vu,surch (k)
2,9
5,9
8,8
11,7
20,7
23,6
26,6
29,5
32,4
24,63
24,63
24,63
24,63
24,63
24,63
24,63
24,63
24,63
40,0
120,0
160,1
qu,soil (ksf)
1,29
1,35
1,42
1,48
1,55
Mu,soil (ft-k)
31,1
126,5
289,4
522,7
24,63
-2121
283,2
323,2
363,2
403,2
443,3
1,75
1,81
1,88
1,94
2,01
Vu,soil (k)
Mu (ft-k)
Vu (kips)
4,3
6,7
7,2
5,9
48,1
3,25
4,88
6,50
39,0
27,9
12,36
14,9
ColR
001 L
001 L
001 L
11,50
13,13
14,75
16,38
18,00
Mu,pedestal (ft-k)
Vu,pedestal (k)
0,0
0,0
0,0
0,0
-13,4
-13,4
-13,4
-13,4
-13,4
Pu,surch (klf)
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
Mu,surch (ft-k)
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
Vu,surch (k)
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
18,47
18,47
18,47
18,47
18,47
18,47
18,47
18,47
18,47
60,0
90,0
120,0
212,4
0,69
0,75
0,82
0,88
1,09
242,4
18,47
-2992
272,4
302,4
332,4
1,22
1,28
1,35
qu,soil (ksf)
0,62
Mu,soil (ft-k)
1,15
1239
Vu,soil (k)
Mu (ft-k)
-9,0
-34,1
-72,1
-120,0
88,5
54,5
26,3
7,1
Vu (kips)
10,8
19,7
26,7
31,8
22,2
19,5
14,9
8,4
DESIGN FLEXURE
Location
Top Longitudinal
Bottom Longitudinal
d (in)
19,37
18,37
Mu,max
-120,0 ft-k
196,8 ft-k
min
reqD
max
smax
0,0004 0,0003 0,0155 no limit
0,0008 0,0006 0,0155
18
use
2 # 10
13 # 10 @ 17 in o.c.
provD
0,0006
0,0042
[Satisfactory]
Vc = 2 b d (fc')0.5
Vu,max
Longitudinal
60,6
326
check Vu < Vc
[Satisfactory]
CHECK FOOTING PUNCHING SHEAR (ACI 318-08 SEC.15.5.2, 11.11.1.2, 11.11.6, & 13.5.3.2)
v u ( psi ) =
0.5 v M u [ d + c ]
Pu R
+
J
AP
v c ( psi ) = ( 2 + y ) f 'c
A P = b 0d
v = 0.4
d +c
d3
J = 0.5 ( d + c ) d
+
3
2
P u ( d + c )
R=
4A f
4
d
, 40
y = MIN 2,
b 0
c
b0 = ( c + d )
A f = L2
Case
Pu
Mu
b0
Af
Ap
vu (psi)
vc
1
2
3
198,4
89,2
9,6
0,0
330,8
330,8
246,2
246,2
246,2
0,4
0,4
0,4
1,0
1,0
1,0
2,0
2,0
2,0
324,0
324,0
324,0
31,4
31,4
31,4
20,5
9,2
1,0
171,3
171,3
171,3
39,3
35,2
19,4
164,3
164,3
164,3
0,75
[Satisfactory]
where
(cont'd)
CHECK PEDESTAL REINF. LIMITATIONS
max
=
0,08 (ACI 318-08, Section 10.9)
min
=
0,01 (ACI 318-08, Section 10.9)
smax
smin
=
=
3
1
provd
0,011
[Satisfactory]
sprovd
in
[Satisfactory]