Deep Footing Design Based on ACI 318-08


INPUT DATA
PEDESTAL DIAMETER
SQUARE FOOTING LENGTH

c
L

=
=

60
18

in
ft

Df

10,5

ft

FOOTING THICKNESS
WATER TABLE

T
h

=
=

22
8

in
ft

CONCRETE STRENGTH

fc'

ksi

REBAR YIELD STRESS

fy

60

ksi

AXIAL DEAD LOAD

PDL

73,1

AXIAL LIVE LOAD

PLL

50

LATERAL LOAD (0=WIND, 1=SEISMIC)


PLAT
SEISMIC AXIAL LOAD

=
=

SEISMIC MOMENT LOAD

MLAT

120

ft-k, SD

SEISMIC SHEAR LOAD

VLAT

11

k, SD

SURCHARGE

qs

0,1

ksf

BACKFILL SOIL WEIGHT

ws

0,1

kcf

ALLOW SOIL PRESSURE

Qa

ksf

#
#
4

10
10
spiral @

FOOTING EMBEDMENT DEPTH

FOOTING REINFORCING SIZE


PEDESTAL VERT. REINF. SIZE
PEDESTAL SHEAR. REINF.

22
#

1
Seismic,SD
-79,175 k, SD, uplift

vertical
3

in o.c.

DESIGN SUMMARY
TOP FOOTING REINF., E. WAY =>
BOT. FOOTING REINF., E. WAY =>

2 # 10
13 # 10 @ 17 in o.c.

THE FOOTING DESIGN IS ADEQUATE.

ANALYSIS
DESIGN LOADS AT TOP OF FOOTING (IBC SEC.1605.3.2 & ACI 318-08 SEC.9.2.1)
CASE 1:
DL + LL
P
=
123 kips
CASE 2:
DL + LL + E / 1.4
P
=
67
kips
M
=
154 ft-kips
V
=
8
kips
e
=
2,3 ft, fr cl ftg
CASE 3:
0.9 DL + E / 1.4
P
=
9
kips
M
=
154 ft-kips
V
=
8
kips
e
=
16,7 ft, fr cl ftg

1.2 DL + 1.6 LL
1.2 DL + 1.0 LL + 1.0 E

0.9 DL + 1.0 E

CHECK OVERTURNING FACTOR (IBC 09 1605.2.1, 1808.3.1, & ASCE 7-05 12.13.4)
MR / MO =
Where MO =

4,20042

>

1 / 0.9

[Satisfactory]

MLAT + VLAT Df - 0.5 PLAT L =

948

Pftg =

(0.15 kcf) [T L 2 + ( c2/ 4)(Df - T)] =

wsat =

ws + 0.018 kcf =

wwater =

k-ft
114,63 k, footing weight

0,118 kcf, saturated soil weight

0,0625 kcf, water specifc weight

Psoil =

[ws MIN(h, Df -T)+ (w sat - wwater) MAX(Df - T - h, 0)] (L 2 - c2/ 4) =

MR =

0.5 (PDL + Pftg + Psoil) L =

3982

k-ft

CHECK UPLIFT CAPACITY


FGravity / FUplift =
Where FUplift =

7,51183

>

- PLAT = 79,2

1,0

[Satisfactory]

Pftg =

114,63

k, footing weight

Psoil =

407,02

k, soil weight with 30 o pyramid

FGravity = PDL+ Pftg+ Psoil =

594,75 k

254,75 k, soil wt

Pu
Pu
Mu
Vu
eu
Pu
Mu
Vu
eu

=
=
=
=
=
=
=
=
=

168
59
215
11
3,7
-13
215
11
-16,1

kips
kips
ft-kips
kips
ft, fr cl ftg
kips
ft-kips
kips
ft, fr cl ftg

(cont'd)
CHECK SOIL BEARING CAPACITY (ACI 318-08 SEC.15.2.2)
Service Loads
P
e

CASE 1
123,1
0,0

CASE 2
66,5
2,5

qs L2

32,4

32,4

0,0

k, (surcharge load)

Pftg
P

38,2
193,7

38,2
137,2

34,4
43,6

k, (footing increased)
k

M
e

0,0
0,0

250,7
1,8 < L/6

250,7
5,7 > L/6

qmax

0,6

0,7

0,5

ksf

qallow

4,0

5,3

5,3

ksf

< L/6

CASE 3
9,2
18,2

6e

( P ) 1 + L

, for e L

6
q max =
L2

2 ( P )
L

, for e >
6

3L (0.5L e )

Where

k
ft, (from center of footing)

k-ft, (VLat included)


ft

[Satisfactory]

DESIGN FOOTING FLEXURE & CHECK FLEXURE SHEAR


(ACI 318-08 SEC.15.4.2, 10.2, 10.3.5, 10.5.4, 7.12.2, 12.2, 12.5, 15.5.2, 11.1.3.1, & 11.2)

6eu
( Pu ) 1 + L
L

, for

eu

2
6
q u ,max =
L

2 ( Pu )
L

, for eu >
6

3 L (0.5L eu )

MAX =

'
Mu
0.85 f c 1 1

'

0.383bd 2 f c

=
f y

fy

MIN = MIN 0.0018

FACTORED SOIL PRESSURE


Factored Loads
CASE 1
167,7

Pu

0.85 1 f 'c

u
u +t

T
4
,

d
3

CASE 2

CASE 3

58,5

-13,4

0,0

4,0

-17,6

51,8

32,4

0,0

443,3

443,3

332,4

Pu

662,8

534,2

319,1

Mu

0,0

eu

0,0

eu
qs L2
Pu,ftg & fill

351,0
< L/6

0,7

2,046

qu, max

k
ft, (at base, including V u T / Pu)
k, (factored surcharge load)
k, (factored footing & backfill loads)
k

351,0
< L/6

1,1

2,010

k-ft, (VLat included)


< L/6

ft

1,346

FOOTING MOMENT & SHEAR AT LONGITUDINAL SECTIONS FOR CASE 1


ColL
0
000 L
000 L
000 L
Section
Xu (ft, dist. from left of footing)

1,63

3,25

4,88

6,50

Mu,pedestal (ft-k)

ksf

ColR

001 L

001 L

001 L

11,50

13,13

14,75

16,38

18,00

-419,3 -691,85 -964,39 -1236,9 -1509,5

Vu,pedestal (k)

0,0

0,0

0,0

0,0

167,7

167,7

167,7

167,7

Pu,surch (klf)

2,88

2,88

2,88

2,88

2,88

2,88

2,88

2,88

2,88

2,88

Mu,surch (ft-k)

-3,8

-15,2

-34,2

-60,8

-190,4

-248,1

-313,3

-386,1

-466,6

167,7

Vu,surch (k)

4,7

9,4

14,0

18,7

33,1

37,8

42,5

47,2

51,8

Pu,ftg & fill (klf)

24,63

24,63

24,63

24,63

24,63

24,63

24,63

24,63

24,63

24,63

Mu,ftg & fill (ft-k)

Vu,ftg & fill (k)

-32,513 -130,05 -292,62 -520,21 -1628,3

-2121

-2678,8 -3301,5 -3989,3

40,0

80,0

120,0

160,1

283,2

323,2

363,2

403,2

443,3

2,05

2,05

2,05

2,05

2,05

2,05

2,05

2,05

2,05

qu,soil (ksf)

2,05

Mu,soil (ft-k)

48,618 194,47 437,56 777,89 2434,9 3171,7 4005,7 4936,9 5965,3


-59,837 -119,67 -179,51 -239,35 -423,46 -483,3 -543,14 -602,98 -662,81

Vu,soil (k)

Mu (ft-k)

12,3

49,2

110,7

196,8

196,8

110,7

49,2

12,3

Vu (kips)

-15,1

-30,3

-45,4

-60,6

60,6

45,4

30,3

15,1

(cont'd)
FOOTING MOMENT & SHEAR AT LONGITUDINAL SECTIONS FOR CASE 2
ColL
0
000 L
000 L
000 L
Section

ColR

001 L

001 L

001 L

Xu (ft, dist. from left of footing)

1,63

3,25

4,88

6,50

11,50

13,13

14,75

16,38

18

Mu,pedestal (ft-k)

204,64

109,5

14,366 -80,769 -175,91

Vu,pedestal (k)

0,0

0,0

0,0

0,0

58,5

58,5

58,5

58,5

58,5

Pu,surch (klf)

1,80

1,80

1,80

1,80

1,80

1,80

1,80

1,80

1,80

1,80

Mu,surch (ft-k)

-2,4

-9,5

-21,4

-38,0

-119,0

-155,0

-195,8

-241,3

-291,6

Vu,surch (k)

2,9

5,9

8,8

11,7

20,7

23,6

26,6

29,5

32,4

24,63

24,63

24,63

24,63

24,63

24,63

24,63

24,63

Pu,ftg & fill (klf)

24,63

Mu,ftg & fill (ft-k)

Vu,ftg & fill (k)

40,0

-32,513 -130,05 -292,62 -520,21 -1628,3


80,0

120,0

160,1

qu,soil (ksf)

1,29

1,35

1,42

1,48

1,55

Mu,soil (ft-k)

31,1

126,5

289,4

522,7

24,63
-2121

-2678,8 -3301,5 -3989,3

283,2

323,2

363,2

403,2

443,3

1,75

1,81

1,88

1,94

2,01

1715,7 2268,5 2907,6 3636,0 4456,8

Vu,soil (k)

-38,617 -79,142 -121,57 -165,91 -314,3 -366,42 -420,44 -476,36 -534,2

Mu (ft-k)

-3,7712 -13,019 -24,644 -35,547 172,96 101,94 47,373

Vu (kips)

4,3

6,7

7,2

5,9

48,1

FOOTING MOMENT & SHEAR AT LONGITUDINAL SECTIONS FOR CASE 3


ColL
Section
0
000 L
000 L
000 L
1,63

3,25

4,88

6,50

39,0

27,9

12,36

14,9

ColR

001 L

001 L

001 L

11,50

13,13

14,75

16,38

18,00

Xu (ft, dist. from left of footing)

Mu,pedestal (ft-k)

Vu,pedestal (k)

0,0

0,0

0,0

0,0

-13,4

-13,4

-13,4

-13,4

-13,4

384,46 406,21 427,96 449,71 471,47

Pu,surch (klf)

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

Mu,surch (ft-k)

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

Vu,surch (k)

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

18,47

18,47

18,47

18,47

18,47

18,47

18,47

18,47

Pu,ftg & fill (klf)

18,47

Mu,ftg & fill (ft-k)

Vu,ftg & fill (k)

-24,385 -97,539 -219,46 -390,16 -1221,3 -1590,8 -2009,1 -2476,1


30,0

60,0

90,0

120,0

212,4

0,69

0,75

0,82

0,88

1,09

242,4

18,47
-2992

272,4

302,4

332,4

1,22

1,28

1,35

qu,soil (ksf)

0,62

Mu,soil (ft-k)

15,337 63,416 147,33 270,19 925,34

-19,195 -40,297 -63,306 -88,222 -176,85 -209,54 -244,14 -280,64 -319,06

1,15
1239

1607,4 2033,5 2520,5

Vu,soil (k)

Mu (ft-k)

-9,0

-34,1

-72,1

-120,0

88,5

54,5

26,3

7,1

Vu (kips)

10,8

19,7

26,7

31,8

22,2

19,5

14,9

8,4

DESIGN FLEXURE
Location
Top Longitudinal
Bottom Longitudinal

d (in)
19,37
18,37

Mu,max
-120,0 ft-k
196,8 ft-k

min
reqD
max
smax
0,0004 0,0003 0,0155 no limit
0,0008 0,0006 0,0155
18

use
2 # 10
13 # 10 @ 17 in o.c.

provD
0,0006
0,0042
[Satisfactory]

CHECK FLEXURE SHEAR


Direction

Vc = 2 b d (fc')0.5

Vu,max

Longitudinal

60,6

326

check Vu < Vc

[Satisfactory]

CHECK FOOTING PUNCHING SHEAR (ACI 318-08 SEC.15.5.2, 11.11.1.2, 11.11.6, & 13.5.3.2)

v u ( psi ) =

0.5 v M u [ d + c ]
Pu R
+
J
AP

v c ( psi ) = ( 2 + y ) f 'c

A P = b 0d

v = 0.4

d +c
d3
J = 0.5 ( d + c ) d
+
3

2
P u ( d + c )
R=
4A f

4
d
, 40
y = MIN 2,

b 0
c

b0 = ( c + d )

A f = L2

Case

Pu

Mu

b0

Af

Ap

vu (psi)

vc

1
2
3

198,4
89,2
9,6

0,0
330,8
330,8

246,2
246,2
246,2

0,4
0,4
0,4

1,0
1,0
1,0

2,0
2,0
2,0

324,0
324,0
324,0

31,4
31,4
31,4

20,5
9,2
1,0

171,3
171,3
171,3

39,3
35,2
19,4

164,3
164,3
164,3

0,75

[Satisfactory]
where

(ACI 318-08, Section 9.3.2.3 )

(cont'd)
CHECK PEDESTAL REINF. LIMITATIONS
max
=
0,08 (ACI 318-08, Section 10.9)
min
=
0,01 (ACI 318-08, Section 10.9)
smax
smin

=
=

3
1

(ACI 318-08, Section 7.10.4.3)


(ACI 318-08, Section 7.10.4.3)

provd

0,011
[Satisfactory]

sprovd

in
[Satisfactory]