LAMPIRAN BERITA ACARA KLARIFIKASI DAN NEGOSIASI

KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

:
:
:
:

SURVEI KONTUR JALAN DAN JEMBATAN


SURVEI KONTUR JEMBATAN BUNGKU
BUNGKU
2009

Uraian

No

Harga Perhitungan Sendiri


(Rp)

Total Biaya Hasil Koreksi


(Rp)

Total Biaya Hasil Negosiasi

(Rp)

A1 Tenaga Ahli (Harga Satuan Tetap)

33,750,000.00

33,750,000.00

33,750,000.00

A2 Tenaga Pendukung (Harga Satuan Tetap)

13,750,000.00

13,750,000.00

13,750,000.00

B1 Biaya Perlengkapan / Umum Kantor (Harga Satuan Tetap)

6,500,000.00

6,500,000.00

6,375,000.00

B2 Survei Pendahuluan (Harga Satuan Tetap)

4,250,000.00

4,000,000.00

4,000,000.00

B3 Survei Topografi (Harga Satuan Tetap)

6,200,000.00

6,125,000.00

6,125,000.00

B4 Laporan (Harga Satuan Tetap)

3,500,000.00

3,250,000.00

3,250,000.00

67,950,000.00
6,795,000.00
74,745,000.00
74,745,000.00

67,375,000.00
6,737,500.00
74,112,500.00
74,112,500.00

67,250,000.00
6,725,000.00
73,975,000.00
73,975,000.00

Jumlah Diluar PPN


PPN 10%
Jumlah Termasuk PPN
Dibulatkan

Panitia Pengadaan Jasa Konsultansi Dinas Pekerjaan Umum


Daerah Kabupaten Morowali TA. 2009

Menyetujui :
CV. 09 CCA Engineering Consultant

IMAM MASHURI, ST
Direktur

1 Leins Mario Lambo

Ketua

2 Mirhan Triandi Do'e

Sekretaris

3 Kusmaryanto

Anggota

1 ....
2 ....
3 ....

RENCANA ANGGARAN BIAYA


HARGA PERHITUNGAN SENDIRI
HARGA TERKOREKSI
No

Jabatan

Jumlah
Personil

Jumlah Orang
Bulan

1
1

2.50
2.50

BEBAN BIAYA
PERSONIL (Rp)

JUMLAH BIAYA
(Rp)

7,500,000.00
6,000,000.00

18,750,000.00
15,000,000.00

BEBAN BIAYA
PERSONIL (Rp)

HARGA NEGOSIASI

JUMLAH BIAYA BEBAN BIAYA


(Rp)
PERSONIL (Rp)

JUMLAH BIAYA
(Rp)

A. BIAYA LANGSUNG PERSONIL


A.1 Tenaga Ahli
1 Ketua Tim
2 Ahli Geodesi
JUMLAH A1

No

Jabatan

7,500,000.00
6,000,000.00

33,750,000.00

Jumlah
Personil

Jumlah Orang
Bulan

1
1
1

2.50
2.00
1.00

18,750,000.00
15,000,000.00

7,500,000.00
6,000,000.00

33,750,000.00

RENCANA ANGGARAN BIAYA


HARGA PERHITUNGAN SENDIRI
HARGA TERKOREKSI
BEBAN BIAYA
JUMLAH BIAYA
BEBAN BIAYA
JUMLAH BIAYA

18,750,000.00
15,000,000.00
33,750,000.00

HARGA NEGOSIASI
BEBAN BIAYA JUMLAH BIAYA

A.2 Tenaga Pendukung


1
2
3

Sekretaris / Operator Komputer(1 orang)


Juru Gambar (CAD)
(1 orang)
Surveyor
(1 orang)

1,700,000.00
3,500,000.00
2,500,000.00

JUMLAH A2

No

Jenis Bahan

4,250,000.00
7,000,000.00
2,500,000.00

1,700,000.00
3,500,000.00
2,500,000.00

13,750,000.00

Volume

Satuan

2.50
2.50
2.50
2.00

Bulan
Bulan
Bulan
Bulan
Bulan

4,250,000.00
7,000,000.00
2,500,000.00

1,700,000.00
3,500,000.00
2,500,000.00

13,750,000.00

RENCANA ANGGARAN BIAYA


HARGA PERHITUNGAN SENDIRI
HARGA TERKOREKSI
BEBAN BIAYA
JUMLAH BIAYA
BEBAN BIAYA
JUMLAH BIAYA

4,250,000.00
7,000,000.00
2,500,000.00

13,750,000.00

HARGA NEGOSIASI
BEBAN BIAYA JUMLAH BIAYA

B.1 Biaya Perlengkapan/Umum Kantor


1
2
3
4
5

Komputer+Printer
(1 unit)
ATK
Biaya Komunikasi
Sewa Kendaraan Roda Empat
Sewa Kendaraan Roda Dua
(1 unit)

JUMLAH B1

900,000.00
400,000.00
300,000.00

2,250,000.00
1,000,000.00
750,000.00

850,000.00
400,000.00
350,000.00

2,125,000.00
1,000,000.00
875,000.00

850,000.00
400,000.00
300,000.00

2,125,000.00
1,000,000.00
750,000.00

1,250,000.00

2,500,000.00

1,250,000.00

2,500,000.00

1,250,000.00

2,500,000.00

6,500,000.00

6,500,000.00

6,375,000.00

No

Jenis Bahan

B.2 Survey Pendahuluan


1 Uang Harian
- Ketua Tim
(1 org x 10 hari)
- Tenaga Ahli
(1 org x 10 hari)
2 Peralatan Lapangan, Bahan, dll.

Volume

Satuan

10
10
1

OH
OH
Ls

RENCANA ANGGARAN BIAYA


HARGA PERHITUNGAN SENDIRI
HARGA TERKOREKSI
BEBAN BIAYA
JUMLAH BIAYA
BEBAN BIAYA
JUMLAH BIAYA

150,000.00
150,000.00
1,250,000.00

JUMLAH B2

No

Uraian

B.3 Survey Topografi


Biaya Perjalanan
(1 org x 1 kali)
1 Uang Harian
2 - Surveyor
(1 org x 15 hari)
- Buruh
(1 org x 15 hari)
3 Peralatan Lapangan, Bahan, dll.

B.4
1
2
2

Uraian

Laporan
Laporan Pendahuluan
Laporan Hasil Survey
Laporan akhir + Peta Hasil Survei

JUMLAH B4

150,000.00
150,000.00
1,000,000.00

4,250,000.00

1,500,000.00
1,500,000.00
1,000,000.00

150,000.00
150,000.00
1,000,000.00

4,000,000.00

RENCANA ANGGARAN BIAYA


HARGA PERHITUNGAN SENDIRI
HARGA TERKOREKSI
BEBAN BIAYA
JUMLAH BIAYA
BEBAN BIAYA
JUMLAH BIAYA

1,500,000.00
1,500,000.00
1,000,000.00

4,000,000.00

HARGA NEGOSIASI
BEBAN BIAYA JUMLAH BIAYA

Volume

Satuan

OT

200,000.00

200,000.00

200,000.00

200,000.00

200,000.00

200,000.00

15
15
1

OH
OH
Ls

125,000.00
75,000.00
3,000,000.00

1,875,000.00
1,125,000.00
3,000,000.00

120,000.00
75,000.00
3,000,000.00

1,800,000.00
1,125,000.00
3,000,000.00

120,000.00
75,000.00
3,000,000.00

1,800,000.00
1,125,000.00
3,000,000.00

JUMLAH B3

No

1,500,000.00
1,500,000.00
1,250,000.00

HARGA NEGOSIASI
BEBAN BIAYA JUMLAH BIAYA

6,200,000.00

Volume

Satuan

5
10
10

Buku
Buku
Buku

6,125,000.00

RENCANA ANGGARAN BIAYA


HARGA PERHITUNGAN SENDIRI
HARGA TERKOREKSI
BEBAN BIAYA
JUMLAH BIAYA
BEBAN BIAYA
JUMLAH BIAYA

50,000.00
75,000.00
250,000.00

250,000.00
750,000.00
2,500,000.00

3,500,000.00

50,000.00
75,000.00
225,000.00

250,000.00
750,000.00
2,250,000.00

3,250,000.00

6,125,000.00

HARGA NEGOSIASI
BEBAN BIAYA JUMLAH BIAYA

50,000.00
75,000.00
225,000.00

250,000.00
750,000.00
2,250,000.00

3,250,000.00

INVOICE
KONSULTAN
KEGIATAN
PEKERJAAN
NO.KONTRAK
TANGGAL KONTRAK

:
:
:
:
:

CV. LOBO Eng. Consultan


PEMBANGUNAN JALAN
Pengawasan Pembangunan Jalan Ulunambo - Terebino
047 /KONT-PWS/DPUD-BK/VII/2010
30 Juli 2010
Invoice
Periode

NO.

U R A I A N

:
:

01 (Ketiga) Bulan Ketiga


01 Oktober s/d 31 Oktober 2010

NILAI TAGIHAN S/D PROSENTASE S/D


BULAN INI
BULAN INI
Rp.

BOBOT
(%)

NILAI KONTRAK
Rp.

1. Tenaga Ahli (Harga Satuan Tetap)

49.56

22,500,000.00

7,500,000.00

16.52

2. Sub Profesional Staff (Harga Satuan Tetap)

16.52

7,500,000.00

2,500,000.00

5.51

9.91

4,500,000.00

1,500,000.00

3.30

1. Mobilisasi dan Demobilisasi

0.99

450,000.00

2. Perjalanan Lokal dan Uang harian

1.32

600,000.00

200,000.00

0.44

3. Akomodasi

10.90

4,950,000.00

1,650,000.00

3.63

4. Fasilitas Kantor dan Laporan

10.79

4,900,000.00

2,953,333.33

6.51

JUMLAH
100.00
PPN 10 %
JUMLAH
NILAI TAGIHAN BULAN KETIGA
POTONGAN
Total Nilai Tagihan S/ D Bulan lalu
Pengembalian Uang Muka
TOTAL POTONGAN ( 1 + 2 )
NILAI TAGIHAN BULAN INI
NILAI TAGIHANs/d BULAN KETIGA DIBULATKAN

45,400,000.00
4,540,000.00
49,940,000.00

16,303,333.33
1,630,333.33
17,933,666.67
17,933,666.67

35.91

BIAYA LANGSUNG PERSONIL

3. Staf Pendukung (Harga Satuan Tetap)


B

BIAYA LANGSUNG NON PERSONIL

1.
2.

32,006,333.33
32,006,333.33
17,933,666.67
49,940,000.00

Terbilang : Tujuh Belas Juta Sembilan Ratus Tiga Puluh Tiga Ribu Enam Ratus Enam Puluh Enam Rupiah

PROSENTASE YANG DICAPAI

S/D BULAN LALU


BULAN INI
S/D BULAN INI

64.09
35.91
100.00

DISETUJUI OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

DIBUAT OLEH :
CV. ARCADE Eng. Consultant

LAODE MUH. YANI SAMU, ST, M.Si


NIP. 19750930 200212 1 010

SYALDI
Direktur

100
(0.00)

KONSULTAN
KEGIATAN
PEKERJAAN
NO.KONTRAK
TANGGAL KONTRAK

A.
A.1

URAIAN

Site Engineer

JUMLAH

A.2

KONTRAK
Beban Biaya
Personil
( Rp )

3.0

7,500,000

TAGIHAN S/D. BULAN LALU

Jumlah
( Rp )
22,500,000

Jumlah
Orang
Bulan
2.00

22,500,000

URAIAN

Inspector

Jumlah
Personil
1

Jumlah
Orang
Bulan

KONTRAK
Beban Biaya
Personil
( Rp )

3.0

2,500,000

A.2

Periode

03 ( Tiga ) Bulan Ketiga


01 Oktober s/d 31 Oktober 2010

Jumlah
( Rp )
15,000,000

TAGIHAN BULAN INI


Jumlah
Jumlah
Orang
( Rp )
Bulan
1.0

15,000,000

7,500,000

TAGIHAN S/D. BULAN INI

Jumlah
Orang
Bulan
3.0

7,500,000

Jumlah
( Rp )

SISA
DANA
( Rp )

22,500,000

22,500,000

TAGIHAN S/D. BULAN LALU

Jumlah
( Rp )
7,500,000

Jumlah
Orang
Bulan
2.00

7,500,000

Jumlah
( Rp )
5,000,000

TAGIHAN BULAN INI


Jumlah
Jumlah
Orang
( Rp )
Bulan
1.0

5,000,000.00

2,500,000

TAGIHAN S/D. BULAN INI

Jumlah
Orang
Bulan
3

2,500,000

Jumlah
( Rp )

SISA
DANA
( Rp )

7,500,000

7,500,000

Tenaga Pendukung

NO.

Invoice

Sub Profesional Staf

JUMLAH
A.3

Jumlah
Personil

Jumlah
Orang
Bulan

A.1

NO.

CV. LOBO Eng. Consultan


PEMBANGUNAN JALAN
Pengawasan Pembangunan Jalan Ulunambo - Terebino
047 /KONT-PWS/DPUD-BK/VII/2010
30 Juli 2010

BIAYA LANGSUNG PERSONIL


Tenaga Ahli

NO.

:
:
:
:
:

URAIAN

Sekretaris/Operator Komputer

JUMLAH

A.3

Jumlah
Personil

Jumlah
Orang
Bulan

KONTRAK
Beban Biaya
Personil
( Rp )

3.0

1,500,000

TAGIHAN S/D. BULAN LALU

Jumlah
( Rp )

4,500,000

4,500,000

Jumlah
Orang
Bulan

2.00

Jumlah
( Rp )

3,000,000

3,000,000.00

TAGIHAN BULAN INI


Jumlah
Jumlah
Orang
( Rp )
Bulan

1.0

1,500,000

1,500,000

TAGIHAN S/D. BULAN INI

Jumlah
Orang
Bulan

Jumlah
( Rp )

SISA
DANA
( Rp )

4,500,000

4,500,000

KONSULTAN
KEGIATAN
PEKERJAAN
NO.KONTRAK
TANGGAL KONTRAK

B.
B.1.

:
:
:
:
:

CV. LOBO Eng. Consultan


PEMBANGUNAN JALAN
Pengawasan Pembangunan Jalan Ulunambo - Terebino
047 /KONT-PWS/DPUD-BK/VII/2010
30 Juli 2010

NO.

URAIAN

Satuan

Volume

Perjalanan Lokal Ke Lokasi Proyek (Prof Staff)

Bulan

1.0

Perjalanan Lokal Ke Lokasi Proyek (Sub Prof)

Bulan

1.0

JUMLAH

TAGIHAN S/D. BULAN LALU

Harga Satuan
( Rp )

Jumlah
( Rp )

225,000
225,000
-

01 Oktober s/d 31 Oktober 2010

Jumlah
Orang
Bulan

Jumlah
( Rp )

TAGIHAN BULAN INI


Jumlah
Jumlah
Orang
( Rp )
Bulan

TAGIHAN S/D. BULAN INI

Jumlah
Orang Bulan

Jumlah
( Rp )

SISA
DANA
( Rp )

1.00

225,000

1.0

225,000

225,000

1.00

225,000

1.0

225,000

450,000

B.1

450,000

450,000.00

Perjalanan Lokal dan Uang Harian (Harga Satuan Tetap)

NO.

URAIAN

Satuan

Harga Satuan
Volume
( Rp )

TAGIHAN S/D. BULAN LALU

Jumlah
( Rp )

Volume

Jumlah
( Rp )

TAGIHAN BULAN INI


Volume

Jumlah
( Rp )

TAGIHAN S/D. BULAN INI

Volume

Jumlah
( Rp )

SISA
DANA
( Rp )

Perjalanan Darat
- Site engineer Kelokasi

Periode

03 ( Tiga ) Bulan Ketiga

225,000

KONTRAK

Mobilisasi dan Demobilisasi (Harga Satuan Tetap)


KONTRAK

B.2.

Invoice
BIAYA LANGSUNG NON PERSONIL

Uang Harian

JUMLAH

B.2

(@ 3 hari)

PP

3.0

100,000

300,000

2.00

200,000

1.0

100,000

3.0

300,000

Hari

6.0

50,000

300,000

4.00

200,000

2.0

100,000

6.0

300,000

600,000

600,000

400,000.00

200,000

B.3.

Akomodasi (Harga Satuan Tetap)


KONTRAK

NO.

URAIAN

Volume

TAGIHAN S/D. BULAN LALU

Jumlah
( Rp )

TAGIHAN BULAN INI


Volume

Jumlah
( Rp )

TAGIHAN S/D. BULAN INI

Jumlah
( Rp )

Volume

SISA
DANA
( Rp )

Bulan

3.0

200,000

600,000

2.00

400,000

1.0

200,000

3.0

600,000

Sewa Kendaraan + Operasional


Kendaraan Roda Dua
( 2 Unit)

Bulan

3.0

1,450,000

4,350,000

2.00

2,900,000

1.0

1,450,000

3.0

4,350,000

4,950,000

B.3

4,950,000
6,000,000

3,300,000.00

1,650,000

Fasilitas Kantor dan Laporan (Harga Satuan Tetap)


KONTRAK

NO.

URAIAN

Sewa Kantor Termasuk Perlengkapan

Sewa Peralatan Kantor


- Komputer + Printer
Bahan Alat Tulis kantor(ATK)
Laporan-Laporan
4 Buku
- Laporan Bulanan
4 Buku
- Laporan Akhir

3
4

Volume

Jumlah
( Rp )

Sewa Rumah
(2 org x 1 kali)
- Profesional Staff /Sub Profesional

JUMLAH
B.4.

Satuan

Harga Satuan
( Rp )

JUMLAH

Satuan

Harga Satuan
Volume
( Rp )

TAGIHAN S/D. BULAN LALU

Jumlah
( Rp )

Volume

Jumlah
( Rp )

TAGIHAN BULAN INI


Volume

Jumlah
( Rp )

TAGIHAN S/D. BULAN INI

Jumlah
( Rp )

Volume

SISA
DANA
( Rp )

Bulan

Bulan
Bulan

3.0
3.0

500,000.00
333,333.33

1,500,000
1,000,000

2
2

500,000
333,333

1.0
1.0

500,000
333,333

3.0
3.0

1,500,000
1,000,000

Buku
Buku

10.0
5.0

140,000.00
200,000.00

1,400,000
1,000,000

2
0

140,000
-

8.0
5.0

1,120,000
1,000,000

10.0
5.0

1,400,000
1,000,000

2,953,333

4,900,000

16,303,333
1,630,333
17,933,667
17,933,667

16,303,333
1,630,333
17,933,667
17,933,667

B.4

JUMLAH A + B
PPN 10%
BIAYA PEKERJAAN
TOTAL

4,900,000

45,400,000
4,540,000
49,940,000
49,940,000

973,333.33

DISETUJUI OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

DIBUAT OLEH :
CV. LOBO Eng. Consultan

LAODE MUH. YANI SAMU, ST, M.Si


NIP. 19750930 200212 1 010

SYALDI
Direktur

16,303,333
1,630,333
17,933,667
17,933,667