Manhole opening location & size may be modified as required Delivery is made by crane-equipped trucks, excavation must be ready, safe and accessible for unloading from the rear of the truck. Min overhead clearance of 18ft is required. ALL UNITS MUST BE HANDLED WITH PROPER LIFTING EQUIPMENT . (I.E. SPREADER BAR) NOTE: Typical use would include a standard manhole frame & cover (OPSD 401.01) (For burial depth add at least 6") NOTE: Sold as three separate pieces 1 BCP 114T9 H20 2" Dia Lifting holes (Typ) 2 3 BCP 114P H20 BCP 114B
72 1829 26 660
20 508
6.5 165
Typ
48 1219
6 152
Typ
in (mm)
Brooklin
CONCRETE
Brooklin Newmarket Huntsville Haliburton (800)655-3430 (888)407-6443 (800)264-3302 (800)273-9084
Concrete Properties: 4500 PSI (32 MPa) Min Strength 6-8% Air Entrainment Cable entry openings - PVC seals for max 4"I.D. duct Reinforcing - Steel to CSA CAN A23.1 Weight - 12,100 lbs / 5,500 kg Four (4) 2" tapered lifting holes (each piece)
CONSTRUCTION SPECIFICATIONS
BCP 114H20
PRECAST MANHOLE/PULLPIT
This vault is designed to resist Ontario Highway Design wheel loads as follows: Individual wheel 100kN(22,300 lbs) Dual axle 2 - 70kN loads (spaced @ 1.2M) DRAWN BY: RM DATE: Jan/2007