Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

Pickering 1-18 Intermediate

Hold 1500 PSI on csng f/ 8 hrs before cutting off


Set 100% csng wt on slips ---- cut off 7 5/8" csng
Install "C" Sec
N/U & Test BOP's --- 10,000 psi Hi -- 250 psi Lo
String back to 10 Lines
P/U BHA & 4" DP ---- Tag Float Collar
Inner csng

Test csng w / rig pump to 4000 psi

7 5/8" 39# csng

Displace csng w / OBM

Outer csng

Drill flt equipment & 10' formation

10 3/4" 45.45# csng

Test shoe to 18.5 EMW

Annular Volume
5450 '
X .0396 Bbl / Ft
216 bbl

5,450'

4" 14 LB D.P. ---- 4 3/4" OD D.C.'s W/ 2 1/4" I.D.

10.1 # Mud

360 Total Jts 7 5/8" Q125 39# Casing

10.1 # Mud

Inner csng

Surface casing @ 5,450' --- 10 3/4" 45.50#

VOLUME NEEDED TO DISPLACE WBM W/ OBM


16,064' TO FLOAT COLLAR
16064
- 969

BHA

15097 FT DP
Top of cement 11,000'

15097 X .0270 = 409 BBL ANNULAR


15097 X .0108 = 164 TUBULAR

7 5/8" 39# csng


9 7/8" Open Hole

573 BBL TO DISP. D.P.

Annular Volume
x

10,700

969 X .0207 = 20 BBL ANNULAR

.0382 Bbl / Ft

969 X .0049 = 4.7 BBL TUBULAR

409 Bbl

25 BBL TO DISP D.C.'s

573 + 25 = 598 Total Bbls ( 6571 Strokes )

10,700'

Top of float collar 16,064'

1.45

Shoe
Jt.
44.49

Shoe
Jt.
39.29

1.58
Bottoms up strokes
216 + 409 = 625 bbl
.091 bbl / stroke

6868 bottoms up strokes

Top of shoe 16,148'


Shoe @ 16,150'

16,191.70' ----- Total Ft of casing


--- 83.78 ------ Shoe Jts
16,107.92 ------- Total Ft of casing to displace
x .0426 ------- Bbl / Ft
686
------- Bbls mud to displace csng
Formation Integrity Test @ 16,160' ---------- KMW 18.5 -- OMW 14.5
18.5 - 14.5 = 4 X 16,160 X .052 = 3361 PSI