BARZAN ONSHORE PROJECT

WEEKLY SITE PHOTOS 20~26Jun13

Process Train-1 (A100) Area A120 Large Bore Piping Erection around TGT Absorber (B19-C201)

Process Train-1 (A100) Area A120 Erected SRU Steam Drum (B19-V103) above Reaction Furnace

Process Train-1 (A100) Area A150 Erected Pre-Fabricated Tank (B19-T601) by CBI

Process Train-1 (A100) Area A150 (South) Piping Erection around Equipments

Process Train-2 (A200) Area A210 Steel Support Erection for AFC above Main PR

Process Train-2(A200) Area A250 Erected 4 Sulfur Condensers by AJH

Process Train-2(A200) Area A270 Cold Box Erection (B26-Y006) by AJH

Common Process North (B100) Platforms on Debutanizer Column (B17-C201)

Common Process North (B100) Start of Piping Erection above Pipe-rack in Area B140

Common Process South (B200) Area B260 Erected Tanks for Sanitary Treatment Package (B87-Y071)

Common Process South (B200) Installed Instrument Panels inside BSIH-108 Bldg.

Utility (C100) Area Tank Finish Painting

Utility (C100) Area Start of Piping Erection above B86-XS-51 Structure in Area C120

Slug Catcher Area (C210) Piping above Pipe-rack & Sleepers

Cooling Tower Area (C230) Piping around Fresh Cooling Water Cooler

Cooling Tower Area (C230) Cooling Tower Piping Erection at South Side

Flare Area (C240) Flare Derrick Erection

Building Area (C320) Warehouse Area of BXK-05 Wall Cladding & Roofing

Building Area (C320) Erection of Overhead Crane inside BXK-05 Warehouse Area by DESCON

Area D210: Piping Erection & Welding above PR-44 for Sulfur Line