The document provides a progress report on drain works for two locations - New Road MCO1 and Upper Changi Road MCO2 - as of 28 May 2013. It lists the activities, quantities, units of measurement, work done last month and current month, and percentage of work completed for each location. A total of 53m and 45m of drain works have been completed at New Road MCO1 and Upper Changi Road MCO2 respectively, with overall percentages of 46.09% and 39.13% done.
The document provides a progress report on drain works for two locations - New Road MCO1 and Upper Changi Road MCO2 - as of 28 May 2013. It lists the activities, quantities, units of measurement, work done last month and current month, and percentage of work completed for each location. A total of 53m and 45m of drain works have been completed at New Road MCO1 and Upper Changi Road MCO2 respectively, with overall percentages of 46.09% and 39.13% done.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
The document provides a progress report on drain works for two locations - New Road MCO1 and Upper Changi Road MCO2 - as of 28 May 2013. It lists the activities, quantities, units of measurement, work done last month and current month, and percentage of work completed for each location. A total of 53m and 45m of drain works have been completed at New Road MCO1 and Upper Changi Road MCO2 respectively, with overall percentages of 46.09% and 39.13% done.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
S.N. 1 2 3 4 5 6 7 ACTIVITY 900 RCU Drain 91200 RCU Drain 1500 RCU Drain 1400 x 1350 RCBC Approach Slab (1400 RCBC) 1400 x 1200 RC SUMP 1500 x 1500 RC SUMP TOTAL QUANTITY 115 115 30 23.2 99.4 1 1 UNIT m m m m m2 nos. nos. WORK DONE LAST MONTH 15 WORK DONE FOR THE CURRENT 38
6.5625
UPPER CHANGI ROAD MCO2
S.N. 1 2 3 4 5 6 7 8 ACTIVITY 900 RCU Drain 1500 RCU Drain 1200 X 1200 RCBC 1500 x 1000 RCBC 1500 x 2200 RCBC Approach Slab (1500 RCBC) Approach Slab (1200 RCBC) 1500 x 1500 RC SUMP TOTAL QUANTITY 115 115 30 23.2 99.4 1 1 2 UNIT m m m m m m2 m2 nos. WORK DONE LAST MONTH 17 0 WORK DONE FOR THE CURRENT 28 7.14