1 COMPRESSIVE STRENGTH OF NORMAL CONCRETE WITHOUT FLYASH AND QUARRY DUST DESCRIPTION (Trial mix 0% replacement of cement by fly ash and natural sand by quarry sand) Cube I Cube II Cube III Average COMPRESSIVE STRENGTH N/mm2
18
Table 3.2 COMPRESSIVE STRENGTH OF CONCRETE WITH 10% REPLACEMENT OF FLYASH AND QUARRY DUST DESCRIPTION (Trial mix 10% replacement of cement by fly ash and natural sand by quarry sand) COMPRESSIVE STRENGTH N/mm2
7 days Cube I Cube II Cube III Average 29.4 28.95 28.30 28.88
21
Table 3.3 COMPRESSIVE STRENGTH OF CONCRETE WITH 15% REPLACEMENT OF FLYASH AND QUARRY DUST
DESCRIPTION (Trial mix 15% replacement of cement by fly ash and natural sand by quarry sand)
7 days
28 days
24
Table 3.4 COMPRESSIVE STRENGTH OF CONCRETE WITH 25% REPLACEMENT OF FLYASH AND QUARRY DUST
DESCRIPTION (Trial mix 25% replacement of cement by fly ash and natural sand by quarry sand)
7 days Cube I Cube II Cube III Average 23.33 23.78 24.22 23.77
27
DESCRIPTION
7 days
28 days
The following was made during the project work and some of our conclusions. 1. It is observed that the 7 days compressive strength is nearly equal when 10% cement is replaced by fly ash and 10% natural sand by crushed stone powder. There is no much variation in 21 days compressive strength also when compared with nominal mix concrete strength