Table 3.

1 COMPRESSIVE STRENGTH OF NORMAL CONCRETE WITHOUT FLYASH AND QUARRY DUST DESCRIPTION (Trial mix 0% replacement of cement by fly ash and natural sand by quarry sand) Cube I Cube II Cube III Average COMPRESSIVE STRENGTH N/mm2

7 days 22.33 23.66 21.76 22.58

28 days 24.54 26.22 23.14 24.63

18

Table 3.2 COMPRESSIVE STRENGTH OF CONCRETE WITH 10% REPLACEMENT OF FLYASH AND QUARRY DUST DESCRIPTION (Trial mix 10% replacement of cement by fly ash and natural sand by quarry sand) COMPRESSIVE STRENGTH N/mm2

7 days Cube I Cube II Cube III Average 29.4 28.95 28.30 28.88

28 days 32.85 32.93 31.40 32.39

21

Table 3.3 COMPRESSIVE STRENGTH OF CONCRETE WITH 15% REPLACEMENT OF FLYASH AND QUARRY DUST

DESCRIPTION (Trial mix 15% replacement of cement by fly ash and natural sand by quarry sand)

COMPRESSIVE STRENGTH N/mm2

7 days

28 days

Cube I Cube II Cube III Average

27.95 27.43 27.05 27.47

30.91 30.33 29.84 30.36

24

Table 3.4 COMPRESSIVE STRENGTH OF CONCRETE WITH 25% REPLACEMENT OF FLYASH AND QUARRY DUST

DESCRIPTION (Trial mix 25% replacement of cement by fly ash and natural sand by quarry sand)

COMPRESSIVE STRENGTH N/mm2

7 days Cube I Cube II Cube III Average 23.33 23.78 24.22 23.77

28 days 26.11 26.75 27.56 26.80

27

CHAPTER 6 RESULTS AND DISCUSSIONS

DESCRIPTION

COMPRESSIVE STRENGTH N/mm2

7 days

28 days

Normal concrete 10% replacement 15% replacement 25% replacement

22.58 28.88 27.47 23.77

24.63 32.39 30.36 26.80

The following was made during the project work and some of our conclusions. 1. It is observed that the 7 days compressive strength is nearly equal when 10% cement is replaced by fly ash and 10% natural sand by crushed stone powder. There is no much variation in 21 days compressive strength also when compared with nominal mix concrete strength