Professional Documents
Culture Documents
Anggaran Kos Projek Pondok Memanah
Anggaran Kos Projek Pondok Memanah
1.
Kos Bahan
BIL.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
2.
Kuantiti
30 beg
5 ela
6 batang
8 keping
12 keping
5 batang
8 batang
12 batang
5 tin
10 keping
Kos upah
-
3.
BAHAN
Simen
Pasir
Tiang besi (3x12)
BRC Y10
Bumbung Ajiya (15x4)
Besi Holo (2.5x1.5)
Besi Holo (2x1)
Besi Y10
Cat Putih (1 tin 5 liter)
Papan (12x 4)
Kos upah
Kos keseluruhan
360 x RM 12.00
RM 4320.00
RM3103.00 + RM4320
RM7423.00
Jumlah (RM)
510.00
125.00
300.00
160.00
480.00
225.00
224.00
144.00
655.00
280.00
3103.00