Weaving Cost (Plain Weave) Updated June 2006: Hours Hours Hours Hours Hours Hours Hours Hours
Weaving Cost (Plain Weave) Updated June 2006: Hours Hours Hours Hours Hours Hours Hours Hours
QTY
A. Inputs
1. Fixed Cost
a. Depreciation Cost
a.1 Building
P50,000.00 (50 yrs)
a.2. Handloom
14,520.00 (20 yrs)
a.3. Reed
1,995.00 (20 yrs)
a.4 Warping Board
2,000.00 (15 yrs)
a.5 Pirn Winder
1,000.00 ( 5 yrs)
a.6 Heddle wire
369.84 (6 yrs)
a.7. Small tools
650.00 ( 5 yrs)
a.8. Weighing Balance
1,000.00 (15 yrs)
UNIT
1,013.00
744.00
744.00
75.00
43.00
744.00
744.00
0.43
a. Electricity
54.33
UNIT
PRICE
h.
h.
h.
h.
h.
h.
h.
h.
0.30
0.22
0.03
0.04
0.06
0.02
0.04
0.04
p/h
p/h
p/h
p/h
p/h
p/h
p/h
p/h
303.90
163.68
22.32
3.00
2.58
14.88
29.76
0.017
kw
7.10
kw/h
385.80
925.94
2. Variable Cost
a. Material Cost
a.1. Polytheline Plastic
a.2. Candle
Total material cost
b. Labor Cost (190/day)
b.1. Loom Preparation
b.2. Warp Preparation
b.3. Warping
b.4. Dressing the loom for weaving
b.5. Fixing the loom for weaving
b.6 Weaving, fabric construction
b.7 Pirning
b.8. Other activities
Total labor cost
c. Contingency Cost (10% of material, labor cost)
TOTAL VARIABLE COST
0.21
2.00
24.80
24.00
43.00
43.00
24.80
744.00
43.00
43.00
roll
pc.
hours
hours
hours
hours
hours
hours
hours
hours
800.00
10.00
23.75
23.75
23.75
23.75
23.75
23.75
23.75
23.75
/roll
/pc.
168.00
20.00
188.00
589.00
570.00
1,021.25
1,021.25
589.00
17,670.00
1,021.25
1,021.25
23,503.00
2,369.10
26,060.10
26,986.04
=
=
99.2 meters
TPC
UP
= 26,986.04
99.2 meters
=
20% mark-up
Weaving cost per meter
COST
=
=
272.04
54.41
326.45/m.