Description Part of Contract Drawings Included Comments Civil Foundations
Description Part of Contract Drawings Included Comments Civil Foundations
Description CIVIL FOUNDATIONS Inlet Air Filter F01 Main Air Compressor C01 Water Wash Tower E07 Adsorpiton Vessels R01/R02 and Valve Skid Reactivation Heater E08 Special Reactivation Heater E09 Water Chiller Tower E60 Booster Air Compressor C05 Expander/Compressors D01/D01C, D02/D02C Booster Aftercoolers D01CE, D02CE Main Exchanger E01, Subcooler E03 H.P. Clmn. K01, L.P. Clmn. K02, Main Vaporizer E02 Lox Storage Tank B40 Lox Pres. Bldg. Coil E40 H.P. Lox Pumps P03 A, B, C Lox/ purge Vaporizer E41/E80 Lox Loading Pump P40 Lox Unloading Pump P47B Instrument Air Back-up CDA System C82 Pipe Rack and T Supports Condensate Sump O2 Metering Station O2 Valve Station Water Chiller Pumps Modin Bldg. Maintenance Bldg. Control Bldg. Misc. Pipe Supports Misc. Pads and Pedastals Cable Tray Supports Potable Water Tan k UNDERGROUND E&I Grounding Duct Bank UNDERGROUND PIPING Process Sewer Condensate Drain Piping Instrument Air Piping Part of Contract Yes No X X X X Drawings included Yes No X X X X N/A X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X By Others X X X X X X X X X X X By Others By Others To Be Included In Mechanical To Be Included In Mechanical X X X X X X X By Others Comments
Comments