Scop of e Retailing in India

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Fiber Optic Temperature Controller System Lumasmart Commissioning Report 2x600MW Mutiara Thermal Power Project, Tuticorin, Tamilnadu,

Dated: 02/05/2013 FOS system Thermassset2( Sr no: F30976) on Transformer no: 1403701,Lumasmart(Sr no: LEC201000096) on Transformer no: 14037-02 & Lumasmart (Sr no: LEC201000095)on Transformer no:14037-03. Make: Lumasense has been successfully installed and commissioned on above mention Transformer: (R phase), (Y phase), (B phase) of Unit 1, Make: ABB Temperature reading at six channels is being successfully displayed over the Lumasmart & Thermasset2 display panel. Error is displayed on channel no 3 over Thermasset2 display panel, Instrument & FOS extension cables found ok, It may be some internal problem in transformer no: 14037-01 (R phase) that need to be check. All the details regarding installation & settings are given to the concerned person at the site during commissioning and product training has been carried out. Members present: Mr. Rajkumar, Commissioning Manager (for ABB LTD). Mr. Abdul Jaleel, Assistant Engineer (for CEPL).

Lumasense assures the unhesitant services at any time in future.

Mr. Rupesh Bagde For Lumasense Technologies.

Mr. Rajkumar For ABB LTD.

Mr. Abdul Jaleel For CEPL

You might also like