Why-Why Analysis & Action Plan: Why5 Why4 Why3 Why2 Why1
Why-Why Analysis & Action Plan: Why5 Why4 Why3 Why2 Why1
Why1
Operator doesn't know the range of evacuation area
Why2
No sign
Why3
Survey team don't measure the evacuation safe clearance
Why4
Many jobs of survey team
Why5
Ground water Wet hole Run off Free face is not clean Many rockslide Unfinished loading activity Flying rock Remained material No dozer
Bench is too high Wrong loading technique Many of subcontractor's dozers are damaged
Moving blasting
Narrow area Blasting area is scattered Blocked by coal
No plan for an alternative way Material hasn't used up yet Equipment is moved Quality is not complied with IMM specification Short of equipment Working priority
Can't operate
Detour Equipment travels slowly Narrow road High grade Blasting is executed twice a day Limited material stock Narrow blasting area Lack of supervision Product defect
Missfire