CERT NO.

: 13-009

INSPECTION REPORT

DATE LOCATION

PJT.NAME

PRODUCT NAME

MANUFACTOR

DUKWON VALVE CO., LTD

1. LIST
ITEM OF INSPECTION
ITEM NO. PRODUCT NAME PJT. NAME : SPEC. QTY INSTALL PLACE REMARK

INSP. DATE : INSP. LOCATION : INSPECTOR QA DEPT QA DEPT NAME NAME LEE HA J.G J.Y () ()

APPROVAL QA DEPT NAME LEE K.C ()

2. REPORT OF VISUAL INSP.


ITEM OF INSPECTION

PJT. NAME :

1) THE FAULT YES OR NO, BLOWHOLES, PINS, SAND INCLUSION, CRACK OF BODY SURFACE 2) GRADE FINISH OF A MACHINE PROCESSING 3) CHAMFER AND ROUNDNESS SITUATION OF AN EDGE AND CORNER PART. 4) GRADE FINISH OF THE PART WHICH THE FLUID PASSES 6) A MARK SITUATION OF NORMAL SIZE, MAKERS NAME OF A BODY SURFACE

TAG NO.

PRODUCT NAME & NORMAL SIZE () 1 2

RESULTS 3 4 5 6

REMARK

JUDGEMENT OF INSPECTION RESULTS SPECIAL NOTES

ACCEPTABLE

UNACCEPTABLE

INSPECTOR

APPROVAL

WITNESS

3. REPORT OF DIMENSION INSP.


PJT. NAME :
PRODUCT NAME :

1 OF 1

unit : mm CHECK POINT TAG NO.

SPEC. TOLERANCE

JUDGEMENT OF INSPECTION RESULTS

ACCEPTABLE

UNACCEPTABLE

SPECIAL NOTES
INSPECTOR APPROVAL WITNESS

4. REPORT OF PRESSURE TESTS


PJT. NAME : PRODUCT NAME :

1 OF 1
BODY PRESSURE TEST(AIR) TEST DURATION (sec.) SEAT TEST(AIR) TEST DURATION (sec.)

DESCRIPTION

SPEC.

N/A

ITEM NO.

JUDGEMENT OF INSPECTION RESULTS SPECIAL NOTES

ACCEPTABLE

UNACCEPTABLE

INSPECTOR

APPROVAL

WITNESS

5. REPORT OF FUNCTION TEST(NO-LOAD)


PJT. NAME : PRODUCT NAME :
OPERATION CONDITION OF OPEN / CLOSE HYDRAULIC PRESSURE MIN. MPa OPERATING TIME (SEC.)

1 OF 1

CHECK POINT SPEC. TAG NO.

CONDITION OF LIMIT S/W

OPEN CLOSE

CLOSE OPEN

REMARK

SPEC

1)TEST

SPEC

1)TEST

JUDGEMENT OF INSPECTION RESULTS

ACCEPTABLE

UNACCEPTABLE

SPECIAL NOTES

OPERATION TYPE : HYDRAULIC

1)

ONLY FOR REFERENCE

INSPECTOR

APPROVAL

WITNESS

6. RECORD OF PAINT TEST


PJT. NAME : PRODUCT NAME :
DESCRIPTION
SURFACE PREPARATION HUMIDITY SURFACE TEMPERATURE DEW POINT DRY FILM

OF
VISUAL

THICKNESS
INTERIOR : EXTERIOR :

SPEC.

MAX.85%

5~50

OVER 3

TAG NO.
FIRST PRICE SECOND COAT THIRD COAT SSPC-SP-06

PAINT WORK DATE

PRETREATMENT (SSPC-SP-06) : FIRST PRICE :

SECOND COAT : THIRD COAT :

EXTERIOR

PAINT SPEC.
INTERIOR

FIRST PRICE : SECOND COAT : THIRD COAT : FIRST PRICE : SECOND COAT : THIRD COAT :

Final color, TOTAL THICKNESS

JUDGEMENT OF INSPECTION RESULTS

ACCEPTABLE

UNACCEPTABLE

INSTRUMENT SPECIAL NOTES

- ELECTRIC COATING THICKNESS CABRICATION DATE : 13. 02. 16

INSPECTOR

APPROVAL

WITNESS