Professional Documents
Culture Documents
Tariff Rates2011 12
Tariff Rates2011 12
Sr. No.
Category of Consumers
Existing Tariff
Increase in Tariff
Energy Rate (paise/kWh) A) PERMANENT SUPPLY 1 Domestic a) Upto 100 units b) 101 to 300 units c) Above 300 units Non-Residential 2 Supply 3 Public Lighting 4 5 Agricultural Pumpsets
Paisa/Unit
%age
311 452 478 519 510 320 Ps/kWh or Rs. 273 /BHP/Month
348 488 515 556 547 357 Ps/kWh or Rs. 299 /BHP/Month
37 36 37 37 37 37
Industrial Consumers a) Small Power 414 447 33 7.97% b) Medium Supply 458 495 37 8.08% c) Large Supply i) General Industry 458 495 37 8.08% ii) PIU 458 495 37 8.08% iii) Arc Furnace 458 495 37 8.08% Bulk Supply 6 (including MES) a) HT 461 498 37 8.03% b) LT 489 526 37 7.57% 7 Railway Traction 541 578 37 6.84% B) SEASONAL INDUSTRY: COTTON GINNING, PRESSING AND BAILING PLANT, RICE SHELLERS/HULLER MILLS, KINNOW GRADING AND WAXING CENTRES, RICE BRAN STABILISATION UNITS (WITHOUT T.G.SETS) (SP, MS, LS) a) During Season (From 1st September to 31st May next year) SP 414 447 33 7.97% MS 458 495 37 8.08% LS 458 495 37 8.08% b) Off Season SP 491 530 39 7.94% MS 525 567 42 8.00% LS 525 567 42 8.00%
April to July SP 414 MS 458 LS 458 b) August to March Next Year SP 414 MS 458 LS 458 D) GOLDEN TEMPLE, AMRITSAR AND DURGIANA TEMPLE, AMRITSAR a) First 2000 units Free b) Beyound 2000 units 369
a)
33 37 37 33 37 37
10%
= 9.19%
(i) SC and non SC BPL, Domestic consumers with connected load upto 1000 watts will be given 100 units of free power per month in view of Govt subsidy; (ii) AP consumers and consumers mentioned in (i) above will not be charged service charges and meter rentals in view of Govt subsidy; (iii) All other charges including rentals and deposits as per Schedule of General Charges, Supply Code and General Conditions of Tariff & Schedules of Tariff approved by the Commission will continue to be charged at the existing rates till these are reviewed by the Commission; (iv) Fuel Surcharge @ 8 Paise/Unit for metered category and Rs.5/BHP/Month for unmetered category (AP) will also be leviable with effect from 1.4.2011.