Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan

paip air & paip pembetungan


Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe

Item

Utara
North

Kawasan
Region
Tengah
Central
RM Per Tan Metrik
RM Per Metric Ton

39.49
39.64
39.64
39.66
39.66
39.66
39.66
39.68

40.32
40.39
40.39
40.39
40.39
40.39
40.39
40.39

Ogos

39.77

40.45

21.30
21.35
21.35
21.46
21.60
21.60
21.60
21.60
21.60

Sept

39.77

40.45

21.60

Okt

39.77

40.60

21.19

26.57
26.57
26.57
26.57
26.57
26.57
26.57
26.57
26.57
26.57
26.57

44.00
43.96
44.12
44.12
44.12
44.12
44.12
44.04
43.84
43.34
43.05

29.25
29.25
29.25
29.25
29.25
29.25
29.25
29.25
29.25
29.25
29.25

30.22
30.61
30.89
31.00
31.00
31.40
31.40
31.40
31.67
31.67
31.67

27.30
28.71
28.57
28.57
28.57
28.57
28.57
28.61
28.61
28.84
28.84

32.09
32.41
32.19
32.19
32.19
32.19
32.19
32.19
32.19
32.19
32.19

Tempoh
Period

(1) Pasir
Sand
Pasir Sungai
River Sand

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul

Timur
East

Nov
Dis
Pasir Lombong
Mining Sand

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

(2) Batu Baur


Aggregates
Granite
10mm (3/8")
Granite
10mm (3/8")

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.

-7-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(2) Batu Baur (Samb.)


Aggregates (Cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

Granite
20mm (3/4")
Granite
20mm (3/4")

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

32.43
32.64
32.86
32.86
32.86
32.86
32.86
32.86
32.86
32.86
32.86

25.53
25.60
25.60
25.60
25.60
25.70
25.70
25.51
25.51
25.45
25.45

27.56
27.56
27.56
27.56
27.56
27.56
27.56
27.56
27.56
27.56
27.56

Granite
40mm (1 1/2")
Granite
40mm (1 1/2")

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

26.50
26.50
26.50
26.50
26.50
26.50
26.50
26.50
26.50
26.50
26.50

26.90
27.35
27.18
27.18
27.18
27.18
27.18
27.27
27.35
27.35
27.35

25.60
27.20
27.20
27.20
27.20
27.20
27.20
27.20
27.20
27.80
27.80

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

20.32
20.50
20.41
20.41
20.41
20.60
20.60
20.60
20.60
20.60
20.60

21.90
22.27
22.14
22.14
22.14
22.20
22.20
22.19
22.28
22.70
22.70

20.92
21.20
21.20
21.20
21.20
21.20
21.20
21.20
21.20
21.20
21.20

Crushed Aggregate (Crusher Run)


Crushed Aggregate (Crusher Run)
Crusher Run
Crusher Run

-8-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(3) Premix Asphaltic Concrete


Premix Asphaltic Concrete
AC 10 (Wearing Course)

Timur
East

RM Per Tan Metrik


RM Per Metric Ton
159.67
167.75
173.00
170.67
170.67
170.67
172.30
172.30
172.30
172.30
171.50

162.80
166.95
167.70
167.70
169.70
170.80
171.40
171.18
170.84
171.40
171.95

212.00
212.00
212.00
212.00
212.00
212.00
212.00
212.00
212.00
212.00
212.00

2012 Jan

157.00
165.08

158.90
163.90

185.90
185.90

Feb

170.50

164.60

185.90

Mac

170.67

164.60

185.90

Apr

170.67

166.40

185.90

Mei

170.67

167.40

191.80

Jun

172.30

167.90

197.80

Jul

172.30

167.73

197.80

Ogos

172.30

167.43

197.80

Sept

172.30

167.93

197.80

Okt

168.80

168.43

197.80

2011 Dis

155.17

161.70

179.80

2012 Jan
Feb
Mac
Apr

165.60
166.50
166.50
168.50

179.80
179.80
179.80
179.80

Mei

162.92
167.80
168.30
168.30
168.30

169.60

187.00

Jun

170.00

170.10

194.30

Jul

170.00

169.92

194.30

Ogos

170.00

169.58

194.30

Sept

170.00

170.14

194.30

Okt
Nov
Dis

166.20

170.69

194.30

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

AC 14 (Wearing Course)

Kawasan
Region
Tengah
Central

2011 Dis

Nov
Dis
AC 28 (Binder Course)

-9-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(3) Premix Asphaltic Concrete (samb.)


Premix Asphaltic Concrete (cont'd)
ACW 20 (Wearing Course)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

2012 Jan

157.50
165.58

158.40
161.90

194.80
194.80

Feb

171.00

162.60

194.80

Mac

170.70

162.60

194.80

Apr

170.70

164.40

194.80

Mei

170.70

165.40

194.80

Jun

172.30

165.90

194.80

Jul

172.30

165.73

194.80

Ogos

172.30

165.43

194.80

Sept

172.30

165.93

194.80

Okt
Nov
Dis

171.50

166.43

194.80

2011 Dis

-10-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(3) Premix Bituminous Macadam


Premix Bituminous Macadam
BMR40 (Bound Roadbase)

BMR28 (Bound Roadbase)

BML10 (Levelling Course)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton
2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

153.50
156.50
159.00
159.00
159.20
159.20

161.20
163.30
162.80
162.80
165.80
167.20

159.00
159.00
159.00
159.00
159.00

168.00
167.83
167.33
168.17
169.00

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

155.00
157.50
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00

153.00
154.40
154.10
154.10
156.40

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

157.00
159.50
162.00
162.00
162.00
162.00
162.00
162.00
162.00
162.00
162.00

162.60
164.30
163.90
163.90

-11-

157.40
158.00
157.80
157.40
158.00
158.63

166.40
167.60
168.30
168.10
167.70
168.40
169.14

144.00
144.00
144.00
144.00
144.00
144.00
144.00
144.00
144.00
144.00
144.00

153.00
153.00
153.00
153.00
153.00
153.00
153.00
153.00
153.00
153.00
153.00

172.00
172.00
172.00
172.00
172.00
172.00
172.00
172.00
172.00
172.00
172.00

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(3) Premix Bituminous Macadam (samb.)


Premix Bituminous Macadam (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

BMB28 (Binder Course)

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

151.67
158.17
163.00
158.20
153.30
158.00
161.30
158.00
158.00
158.00
158.00

156.60
158.50
158.10
158.10
160.40
161.40
162.00
161.80
161.40
162.00
162.63

168.00
168.00
168.00
168.00
168.00
168.00
168.00
168.00
168.00
168.00
168.00

BMB20 (Binder Course)

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

153.67
155.33
157.00
157.00
157.00
157.00
157.00
157.00
157.00
157.00
157.00

150.60
152.10
151.90
151.90
153.70
154.50
155.00
154.80
154.50
155.00
155.50

189.30
189.30
189.30
189.30
189.30
189.30
192.70
192.70
192.70
192.70
196.00

BMW14 (Wearing Course)

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

154.67
159.50
162.67
157.70
157.70
157.70

161.40
164.60
163.90
163.30
166.80

190.00
190.00
190.00
190.00
190.00
190.00

-12-

161.00
157.67
157.67
157.67
157.67

167.80
167.10
166.90
166.50
167.50
168.75

193.30
193.30
193.30
193.30
199.33

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(3) Premix Bituminous Macadam (samb.)


Premix Bituminous Macadam (cont'd)
BMW20 (Wearing Course)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton
2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

-13-

157.00
159.50
162.00
162.00
162.00
162.00
162.00
162.00
162.00
162.00
162.00

158.30
161.20
160.60
160.00
163.10
164.00
163.40
163.20
162.90
163.80
164.89

200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement


Fabric Reinforcement

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

A4, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.68
2.53
2.53
2.60
2.60
2.68
2.68
2.68
2.68
2.68
2.56

3.00
3.00
3.00
2.98
2.98
2.98
2.98
2.98
2.98
2.98
2.98

3.45
3.45
3.45
3.45
3.45
3.45
3.45
3.45
3.45
3.45
3.45

A5, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.68
2.71
2.71
2.60
2.60
2.68
2.68
2.68
2.68
2.68
2.56

2.97
2.97
2.97
2.95
2.95
2.95
2.95
2.95
2.95
2.95
2.95

3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42

A6, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.40
2.26
2.26
2.33
2.33
2.40
2.40
2.40
2.40
2.40
2.30

2.62
2.62
2.62
2.61
2.61
2.61
2.61
2.61
2.61
2.61
2.61

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

-14-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

A7, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.39
2.26
2.26
2.33
2.33
2.39
2.39
2.39
2.39
2.39
2.29

2.62
2.62
2.62
2.61
2.61
2.61
2.61
2.61
2.61
2.61
2.61

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

A8, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.40
2.27
2.27
2.33
2.33
2.40
2.40
2.40
2.40
2.40
2.30

2.65
2.65
2.65
2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.64

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

A9, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.39
2.26
2.26
2.32
2.32
2.39
2.39
2.39
2.39
2.39
2.29

2.62
2.62
2.62
2.61
2.61
2.61
2.61
2.61
2.61
2.61
2.61

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

-15-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

A10, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.40
2.26
2.26
2.33
2.33
2.40
2.40
2.40
2.40
2.40
2.30

2.62
2.62
2.62
2.55
2.55
2.55
2.55
2.55
2.55
2.55
2.55

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

B5, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.65
2.50
2.50
2.57
2.57
2.65
2.65
2.65
2.65
2.65
2.54

2.96
2.96
2.96
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94

3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41

B6, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.40
2.26
2.26
2.33
2.33
2.40
2.40
2.40
2.40
2.40
2.29

2.63
2.63
2.63
2.62
2.62
2.62
2.62
2.62
2.62
2.62
2.62

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

-16-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

B7, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.40
2.26
2.26
2.33
2.33
2.40
2.40
2.40
2.40
2.40
2.30

2.66
2.66
2.66
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

B8, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.40
2.24
2.27
2.33
2.33
2.40
2.40
2.40
2.40
2.40
2.30

2.66
2.66
2.66
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

B9, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.40
2.26
2.26
2.33
2.33
2.40
2.40
2.40
2.40
2.40
2.30

2.66
2.66
2.66
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

-17-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

B10, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.39
2.26
2.26
2.33
2.33
2.39
2.39
2.39
2.39
2.39
2.29

2.66
2.66
2.66
2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.64

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

B12, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.99
2.69
2.69
2.84
2.84
2.99
2.99
2.99
2.99
2.99
2.76

2.91
2.91
2.91
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90

3.39
3.39
3.39
3.39
3.39
3.39
3.39
3.39
3.39
3.39
3.39

C5, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.01
2.70
2.70
2.85
2.85
3.01
3.01
3.01
3.01
3.01
2.78

2.85
2.85
2.85
2.84
2.84
2.84
2.84
2.84
2.84
2.84
2.84

3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42

-18-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

C6, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.00
2.70
2.70
2.85
2.85
3.00
3.00
3.00
3.00
3.00
2.78

2.85
2.85
2.85
2.84
2.84
2.84
2.84
2.84
2.84
2.84
2.84

3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41

C7, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.00
2.70
2.70
2.85
2.85
3.00
3.00
3.00
3.00
3.00
2.78

2.96
2.96
2.96
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94

3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41

C8, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.00
2.70
2.70
2.85
2.85
3.00
3.00
3.00
3.00
3.00
2.77

3.03
3.03
3.03
3.01
3.01
3.01
3.01
3.01
3.01
3.01
3.01

3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40

-19-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

C9, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.00
2.70
2.70
2.85
2.85
3.00
3.00
3.00
3.00
3.00
2.77

2.95
2.95
2.95
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94

3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41

C10, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.00
2.70
2.70
2.85
2.85
3.00
3.00
3.00
3.00
3.00
2.77

2.96
2.96
2.96
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94

3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41
3.41

DA4, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.03
2.73
2.73
2.88
2.88
3.03
3.03
3.03
3.03
3.03
2.80

2.98
2.98
2.98
2.97
2.97
2.97
2.97
2.97
2.97
2.97
2.97

3.44
3.44
3.44
3.44
3.44
3.44
3.44
3.44
3.44
3.44
3.44

-20-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

DA5, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3.01
2.71
2.71
2.86
2.86
3.01
3.01
3.01
3.01
3.01
2.79

2.97
2.97
2.97
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89

3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42
3.42

DA6, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.70
2.43
2.43
2.57
2.57
2.70
2.70
2.70
2.70
2.70
2.50

2.65
2.65
2.65
2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.64

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

DA7, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.70
2.43
2.43
2.57
2.57
2.70
2.70
2.70
2.70
2.70
2.50

2.66
2.66
2.66
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

-21-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (samb.)


Fabric Reinforcement (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg

DA8, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.70
2.43
2.43
2.57
2.57
2.70
2.70
2.70
2.70
2.70
2.50

2.66
2.66
2.66
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

DA9, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.70
2.43
2.43
2.57
2.57
2.70
2.70
2.70
2.70
2.70
2.50

2.66
2.66
2.66
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65

3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07

DA10, MS145

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2.70
2.43
2.43
2.57
2.57
2.70
2.70
2.70
2.70
2.70
2.50

2.66
2.66
2.66
2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.64

3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06

-22-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(5) Guardrail
Guardrail

Kawasan
Region
Tengah
Central

Timur
East

RM Per Meter
RM Per Metre

Single Mounted
i) 1.95m Post Spacing

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

147.41
145.93
145.93
145.93
145.93
145.93
145.93
145.93
145.93
145.93
145.93

147.28
145.80
145.80
145.80
145.80
145.80
145.80
145.80
145.80
145.80
145.80

149.71
148.21
148.21
148.21
148.21
148.21
148.21
148.21
148.21
148.21
148.21

ii) 3.80m Post Spacing

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

101.52
100.50
100.50
100.50
100.50
100.50
100.50
100.50
100.50
100.50
100.50

102.61
101.58
101.58
101.58
101.58
101.58
101.58
101.58
101.58
101.58
101.58

104.29
103.24
103.24
103.24
103.24
103.24
103.24
103.24
103.24
103.24
103.24

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

-23-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

Utara
North

(5) Guardrail (samb.)


Guardrail (cont'd)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Meter
RM Per Metre

Double Mounted
i) 1.95m Post Spacing

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

214.37
217.17
217.17
217.17
217.17
217.17
217.17
217.17
217.17
217.17
217.17

221.49
219.27
219.27
219.27
219.27
219.27
219.27
219.27
219.27
219.27
219.27

225.16
222.90
222.90
222.90
222.90
222.90
222.90
222.90
222.90
222.90
222.90

ii) 3.80m Post Spacing

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

166.96
165.29
165.29
165.29
165.29
165.29
165.29
165.29
165.29
165.29
165.29

168.79
167.09
167.09
167.09
167.09
167.09
167.09
167.09
167.09
167.09
167.09

171.32
169.60
169.30
169.60
169.60
169.60
169.60
169.60
169.60
169.60
169.60

-24-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

(6a) Paip Air


Water Pipe

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

Mild Steel Pipe


300mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

214.00
212.00
217.00
217.00
R
215.00
215.00
215.00
215.00
214.00
212.00
208.00

Stainless Steel Pipe


25mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

30.00
30.00R
30.00
29.00
28.00
27.00
27.00
27.00
27.00
26.00
26.00

Ductile Iron Pipe


300mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

246.30
232.00
232.00
232.00
232.00
232.00
232.00
232.00
232.00
232.00
232.00

Harga bagi paip air dan paip pembetungan adalah harga di kilang.
The prices for water pipe and sewerage pipe are ex-factory prices.
R = Kemaskini/Revised

-25-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

(6a) Paip Air (samb.)


Water Pipe (cont'd)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

High Density Polyethylene


(HDPE) Pipe
i. Compression Fitting Using
For Jointing
25mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

1.34
R
1.33
1.34
1.40R
1.42
1.42
1.42
1.42
1.42
1.42
1.35

ii. Electrofusion Jointing


160mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

66.11
R
65.69
66.11
68.17R
69.07
69.07
69.07
69.07
69.07
69.07
66.17

iii. Butt Fussion


160mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

51.43

R = Kemaskini/Revised

-26-

51.02
51.43
53.50R
54.39
54.39
54.39
54.39
54.39
54.39
51.50

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

(6b) Paip Pembetungan (samb.)


Sewerage Pipe (cont'd)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

Mild Steel Pipe


300mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

231.12
228.96
234.36
234.36
224.64
232.20
232.20
232.20
231.12
228.96
224.64

Ductile Iron Pipe


250mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

185.00
185.00
185.00
185.00
185.00
185.00
185.00
185.00
185.00
185.00
185.00

High Density Polyethylene


(HDPE) Pipe
i. Profile Pipe
150mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

16.50
16.50
16.50
17.90R

R = Kemaskini/Revised

-27-

17.90
17.90
17.90
17.90
17.90
17.90
17.90

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

(6b) Paip Pembetungan (samb.)


Sewerage Pipe (cont'd)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

High Density Polyethylene


(HDPE) Pipe
ii. Solid Pipe
250mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

62.60
62.60
R
58.20
60.80R
60.80
60.80
60.80
60.80
60.80
60.80
60.80

Vitrified Clay Pipe


i. Standard Pipe
225mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

62.90
62.90
62.90
62.90
62.90
62.90
62.90
62.90
62.90
62.90
62.90

ii. Jacking Pipe


225mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

302.00
302.00
302.00
302.00
302.00
302.00
302.00
302.00
302.00
302.00
302.00

R = Kemaskini/Revised

-28-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

(6b) Paip Pembetungan (samb.)


Sewerage Pipe (cont'd)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

Reinforced Concrete Pipe


i. Without Lining
900mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

185.30
185.30
185.30
185.30
185.30
185.30
185.30
185.30
185.30
185.30
185.30

ii. With Lining (High Alumina)


900mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

241.70
241.70
241.70
241.70
241.70
241.70
241.70
241.70
241.70
241.70
241.70

iii. With Lining (Sacrificial Lining)


900mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

213.60
213.60
213.60
213.60
213.60
213.60
213.60
213.60
213.60
213.60
213.60

-29-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Item

Tempoh
Period

(6b) Paip Pembetungan (samb.)


Sewerage Pipe (cont'd)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

ABS Pipe
i. Gravity
110mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

28.92
28.92
28.92
28.92
28.92
28.92
28.92
28.92
28.92
28.92
28.92

ii. Force Main


225mm

2011 Dis
2012 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

81.65
81.65
81.65
81.65
81.65
81.65
81.65
81.65
81.65
81.65
81.65

-30-