Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Pharmalabs Ltd.

, Merven, India

FLUID Capacity :
Time
Steam Pressure in Kg/cm2 Screw Feeder Frequency Flue Gas Temp. Bed Temperature No.1 No. 2 FD System Draft ID Furnace

6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 1.00 2.00 3.00 4.00 5.00 Maintenance Engineer Total Coal Consumed: ______________________ Kgs. Total water consumed :_________________ltrs.

EEO006/F01-00

Attachment # 1 FLUIDPAC BOILER LOG BOOK

Feed Water Quality Hardness pH TDS

Blowdown Water pH TDS MBH

Blowdown IBH Drum Mobrey 1

________________ Kgs. Head of the Departmen

Page 1 of 1
DATE:

Mobrey 2

soot Blowing

Bed Drain

Feed Water tank tempc

Stock tempc

Remarks

Operator :

Operator :

Operator :

You might also like