Engineering Work to be done IN Biotech area Personal Cupboard Lockers to be provided.

ard Lockers to be provided. (GAURAV) ANFD area Floor mat damage to be rectified. (JPU) ANFD- jacket hot water drains point to be provided properly. . (JPU) ANFD-Hydraulic pipe line system to be arranged properly. . (JPU) ANFD-AHU or FDV air provision to be done properly. . (JPU) VTD- pump is in under maintenance last 1yr, to be rectified. . (JPU) T-1002- near Top dish Helix is in Damage condition, to be rectified. . (JPU) T-1002-pump seal leakage to be repaired. . (JPU) T-1002- LT & FT calibration to be done. .(TOMAR) CF-1001- N2 line purging provision to be provided. . (JPU) R-1001& R-1002 bottom common to both extractors flame proof pump to be arranged for Recirculation, solvent transferring and layer separation. . (JPU) All the Agitators motor guards to be arranged properly. . (JPU) All the cable insulation work to be completed.(TOMAR) All the vessels Safety valves calibration and its calibration status tags to be done. (Shaikh) All the Vessel lamp electric cable damage cum insulation to be completed. (TOMAR) DS-1001, DS-1002 & DS-1003 Temp. Control Auto valves to be rectified (long time not working condition in Auto Mode). .(TOMAR) DS-1001 Level control Valve to be rectified. .(TOMAR) Drain points in 5 meter & 8 mete to be provided properly. . (JPU) T-1006- Temp. Control Valve to be repaired as soon as possible. .(TOMAR) Hot water pump and Vacuum pump START & STOP Starter to be provided in convenient place for operation easily. .(TOMAR) Proper ILLUMINATION System to be provided in Terrace area and Solvent area. .(TOMAR) In terrace area Flyover Bridge to be provided near Condenser operation area. . (JPU) Electrical ON/OFF switch in ANF room. .(TOMAR) Emergency door at ground floor, rubber flap to be provided and painting. . (JPU) P1005 pump mechanical seal leakage, . (JPU) Service entry door at mez floor is broken. . (JPU) Rain water is coming from the piping entry in the plant. (JPU)

You might also like