Professional Documents
Culture Documents
Introduction To Coiled Tubing: Module 00 - Day One
Introduction To Coiled Tubing: Module 00 - Day One
1
Copyright 2009, NExT, All rights reserved
Contents
Names, introductions Course dynamics, rules, prizes Facilities The Coiled Tubing Business Why Coiled Tubing? Coiled Tubing for what? Course objectives and time table
2
Copyright 2009, NExT, All rights reserved
196 254
2000
138 139
70 56
98
4
Copyright 2009, NExT, All rights reserved
CT Application Analysis
Others 30.3% Cementing 2.7%
2% 0% 5% 3% 8% 8% Nitrogen Lift Fill Removal Acidizing Scale Removal DH Motors Cementing Logging Fishing Perforating Completions Fraccing CT Drilling
Drilling 10.9% Pumping 20.1% Logging 4.3% Tools 5.2% Kick Offs 10.0% Matrix 16.6%
4% 4% 34%
14% 2% 16%
2004
A basic understanding of the principal items of equipment required for safe and efficient CT operations a basic understanding of job design processes an introduction to the operation of coiled tubing and pressure control equipment a basic understanding of applications and techniques
6
Copyright 2009, NExT, All rights reserved
7 CT Related
7
Copyright 2009, NExT, All rights reserved