3 1 Steam Inlet

External pipe

5 Impingement plate

Guide plate

End plate

Steam Outlet

a) Pressure testing of Internal pipe requires visual access for all the joints welded to pressure parts. (i.e. Guide plate, Impingement plate, or any buttweld joints) Question: End plates are welded both to Internal and external pipes pressure parts, then in what occasion should the endplate be included in pressure testing?Internal or external pipi

b) If this will be included in the pressure testing of internal pipe, then PEC can weld the endplate bef hydrotesting of external piping? c) Is there any required NDE if the endplate will be included in external pipe hydrotest?

External pipe

Internal pipe

Steam Outlet

welded to pressure parts.

essure parts, then in what g?Internal or external piping hydrotest?

can weld the endplate before