2E Handover

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Date: 28.04.

09

Second Engineer Handover Report

Dear Second Engineer U Aung Kyaw San,

Welcome on board. Our good vessel trade is shown in schedules of MOL round voyage. One round trip is 75 days. All store & spare parts will supply in Singapore. Store should be ordered every three months. H.F.O bunker will take place in Singapore and Brazil(santos) every trip. Cylinder oil will receive in Singapore. Sludge will be discharged one truck (20) m3 in Brazil (Dosul) and second discharge will be one barge (30) m3 in Korea (Pusan).

Main Engine 1. Perform every trip (500Hrs) T/C turbine side water washing. Before washing clean nozzle & pipe line. 2. To take performance diagram & data every month. 3. To inspect piston & piston rings through scavenge ports every month. 4. Every day, T/C turbine side should be cleaned by nut shell. 5. Perform T/C blower side water washing every day.

Auxiliary Engine 1. Perform every day T/C blower side cleaning by pure water. 2. Perform T/C turbine side dry cleaning by nut shell every 200 hrs. 3. Taken performance data for all engines once a month at high load. (1100kW) 4. To be cleaned L.O centrifuge filters every 200 hrs. 5. To be changed Governor Oil every 1000 hrs. 6. To be changed alternator bearing oil every 2000 hrs.

Boiler

1. Before arrival port, clean oil fired boiler rotary cup, annulus ring, flame eye sensor & pilot burner. 2. Boiler water test should be done every day.

Fresh Water Generator 1. Both condenser plate & evaporator plates were cleaned. 2. Evaporator plates were already cleaned on.

Oily Water Separator 1. Every voyage you have to clean the coalesce filter. 2. Also clean the 15 PPM sensor glass tube. 3. Before operate the OWS please clean the suction filter.

Incinerator 1. Every week operate the incinerator. 2. Cleaned photo cell.

Waste Oil Tank 1. Transfer water & oil from the L.O purifier sludge tank to waste oil tank by sludge pump. Drain water from waste oil tank to bilge holding tank.

Overtime Sheet 1. Please write O/T for officers & crews max 103 hrs. 2. For training max 40 hrs.

Weekly

1. 2 3.

Carried out boiler water test, cooling water and L.O test weekly. Carried out safety equipments test weekly. Emergency generator running test is carried out weekly. Off-signing 2nd Engineer, Thein Zaw C.D.C 8159 (12.11.08 to 02.04.09) M.V. MOL DELIGHT

You might also like