Professional Documents
Culture Documents
Single Site Verification
Single Site Verification
Coverage
CPICH RSCP & EcIo describe the cell coverage area
Good RSCP & Good EcIo imply Good coverage Poor RSCP & Poor EcIo imply Poor Coverage
Scrambling Codes
The scrambling code check verify
that the actual SC is assigned to the cell SC is not shifted from one cell to the other in the same site that there are no adjacent cells with the same SC causing SC confusion Swapped sector problem caused by crossed feeder cable
Installation Faults
Single site verification verify installation faults which might result in
Low power Fluctuating power Swapped sector
Test calls
Test calls are performed to verify the proper operation of the Circuit switch and the Packet Switch domain; The voice, video and packet service are checked through;
Voice call Video call Packet Service call
R99(Downlink & Uplink) HSPA(Downlink & Uplink)
Test Process
Checklist Coverage Multirab Long voice call & HSDPA(HTTP) Long voice call & R99(HTTP) FTP DL
R99 HSDPA R99 HSUPA
FTP UL
Test Points
Test point should be about 500m from the sector and perpendicular
1. 2. 3.
3G to 2G
Make sure UE is set to GSM/WCDMA Mode Lock on WCDMA (To ensure UE camp on 3G) Lock on GSM (To force UE to perform 3G to 2G cell reselection)
1. 2.
2G to 3G Make sure UE is camping on 2G Lock on WCDMA (To force UE to perform 2G to 3G cell reselection)
Voice call
1. 2.
Send SMS message from Test UE to another UE (Mobile Originating) Send SMS message from another UE to the Test UE (Mobile Terminating)
Make voice call from Test UE to another UE (Mobile Originating) Make voice call from another UE to the Test UE (Mobile Terminating)
Video call
1. 2. 3. Lock on WCDMA Make video call from Test UE to another UE (Mobile Originating) Make video call from another UE to the Test UE (Mobile Terminating)
Perform voice call & Pinging on one Test UE Perform the test on the same spot Perform long voice call on MS1 Test UE Perform HSDPA on data card Drive in clockwise direction round the site Perform long voice call on MS1 Test UE Perform R99 on data card Drive in the anti-clockwise direction round the site Lock on the SC of cell Drive away perpendicular to the cell Stop when RSCP & EcIo has been consistently poor for 200m or after a drop call due to consistent poor coverage Repeat test for other sectors
Coverage
Command sequence How to lock on R99 and HSPA Sample Tems Investigation Data collection Presentation windows KPI Target
Command sequence
Command sequence
Command sequence
KPI Target
Item Requirements
Target CPICH RSCP Minimum >= -85dBm -95dBm For outdoor measurements
Comments
Target
CPICH EcIo Active Set size Minimum Target
>= -8dB
-14 dB <= 3 For unloaded network Based on scanner data Relative to best server when cell is not in Active set Assuming 21 dbm UE max Tx Power For e1a, e1b & e1c
Pilot pollution
Threshold
8 dB
Max Target