BESTWAY CEMENT LIMITED - CHAKWAL WASTE HEAT RECOVERY POWER PLANT Jobs to be carried out as per Kawasaki Supervisor

Comments/Suggestions
Sr.# 1 2 3 4 5 6 7 8 9 10 11 12 Description - Rubber expansion joints, installed after cooling water pumps of cooling tower, should be free from tension or compression by piping. Expansion joints on main cooling water return lines should be installed. - Installation of Mesh on top of the overflow piping inside cooling tower basin - Pickling of steam turbine inlet piping after main steam stop valves, should be done after completion of welding. - Installation of ventilating system inside T/G building. - Rectification of gas duct supports. - Gas duct expansion joints to be installed properly. - Missing hand railings to be installed. - Air vent and drain lines of plant piping should be installed as per supervisor suggestion. - Air vent and drain lines should be installed at boiler feed water line. - Concrete from preduster #1&2 columns base plates, should be removed. - Outlet gas dampers of AQC proper should be installed. - Subject to plant stoppage. Remarks - Rectified on 13.06.09 - In progress/will be completed by 18.06.09 Will be completed after emptying the cooling tower. - Will be completed by:_________ - SESA Fans will be installed. - In progress/ will be completed by 20.06.09. - Will be done by___________ - In progress/will be completed by ______ - In progress/will be completed by:__________ - In progress/will be completed by 18.06.09

You might also like