Professional Documents
Culture Documents
CFC 2
CFC 2
~
UKAS
00. ~(ABLES
ELSEWEDY
-
2005
.-
National
Awards For Excellence
El
IC
S l WED Y
United Industries_ El Sewedy
oS .~I_.:;,L..L~o.L""; 011
i t e s t r ~
Date: 04/06/2009
• Control and low voltage cables as per O.P.F Nr 4543/2009 are complied with
IEC 60502-1 and passed the required tests mentioned in El Sewedy cables
technical offers
• Instrumentation cables as per O.P.F Nr. 4543/2009 are designed based on
SS 5308-1 and passed the required tests mentioned in El Sewedy cables
technical offers.
Signature: