Sub-Contractor QA/QC Rep. Ak/Ihi Qa/Qc Rep. CLNG Rep.: by by by Date Date Date
Sub-Contractor QA/QC Rep. Ak/Ihi Qa/Qc Rep. CLNG Rep.: by by by Date Date Date
: Precalibration Physical Checks Process Connections Correct Electrical Connections Correct Pneumatic Connections Correct Electrical Supply Setting Correct Body Material Correct Instrument General Condition Satisfactory Instrument Complete With Ancillary Equipment Calibration Check Cycle Input Output(Rising) 0% 25% 75% 100% Control Function Fitted Proportional Differential Gap Reset Auto Temperature Correction Range S G Or Density Correction Set At Other Functions Fitted Burnout Set At: Upscale Downscale Set Point Ancillary Equipment List Of Ancillary Equipment % Error Client: CLNG Location: Cameron Parish, LA Purchase Order: Manufacturer: Report No.: Date: Service: Model No.: Serial No.:
Derivative Time Delay Setting Limit Switches Set At Alarm Setting Elevation/Suppression Set At Minimum Stop Set At Maximum Stop Set At Remarks
CP-5803.073
Rev 3