KALA NAO TOP SHEP DISPOSAL OF MUCK / DUMPING SITES PLANNING

Project Component Quantity of Additional Total quantity of Estimated quantity Estimated quantity muck/ debris Quantity of muck muck/ debris of muck/ debris of muck/ debris generated as due to 45% swell including swell proposed to be proposed to be per DPR factor factor utilized dumped Name of the dumping site as shown in the plan Dimension of the dumping site Area in Sqm Average Height of dumping Remarks

1 Diversiom Weir (500) Conveyance (500) Tunnel (1560) Forebay & Penstock (970) Power House (1500) 500 500 1560

2 225 225 702

3=1+2 725 725 2262

4 290 290 905

5=3-4 435 435 1357

9=5/8

10

Dumping Site-I

35 x 20

700

3.2

All muck to be generated shall be dumped in Site-I Total=2227m3

570

257

827

331

496

Dumping Site-2

20 x 10

200

2.5

400m3 muck to be sent to Dumping site-3 Total=570m3 400m3 muck will be come from Dumping Sute-2 Total=1900m3

1900

855

2755

1102

1653

Dumping Site-3

40 x 60

2400

0.7

mping Site-6

Name & designation of the person submitting the statement

Signature