INSTRUCTIONS FOR CONSTURCTION OF HOUSES AT ANCHORAGE The plot owners are advised to comply the following:a.

Get the land demarcated by Anchorage staff, before taking possession of the plot. b. Hire a licensed Architect for preparation of their building plans, according to PC. A.T.P and registered with CDA. c. Building plans should be submitted to the Housing Directorate in 6 quadruplicated along with Form A-1, A-2 and A-3, copy attached with Annexure 'G', with pay order of scrutiny fee and 2 x attested copies of allotment/ transfer order with 2 x copies of site plan. d. After a week of submission of plans, the concerned Architect may contact the Housing Directorate for observations and their compliance. e. Construction should be commenced only after the building plans have been approved by the Housing Directorate. f. Ensure that mandatory setbacks have been left clear when the building layout is being done. g. Water connection should be obtained after submitting an application on prescribed Form A-3 copy attached with Annex 'G', along with a copy of the letter of approval of building plan. h. Approved building plan should be strictly followed during actual construction. In case prior affecting the same any change(s) is/ are required, the revised plan shall be processed for approval by the Housing Directorate. j. On completion of plinth and compound wall (plinth), Form D copy attached with Annexure 'H' should be submitted and plinth verification certificate obtained from the Housing Directorate. k. No ramps should be constructed outside the plot line.

l. If basement is being constructed on the plot, proper water proofing should be ensured and all necessary precautions taken for safety of adjacent structures. m Natural levels of side yards should not be disturbed by more than 2 ft.

n. Sewerage and storm water drainage lines should be laid separately and connected to respective Anchorage mains. p. On completion of the house, notice of completion on Form B-1 copy attached with Annexure 'H' should be submitted to the Housing Directorate.

q. On receipt of above stated letter, site inspection will be carried out by the Anchorage staff. r. After 10 days of site inspection, the Housing Directorate may be contacted in case no intimation has been received from Anchorage staff. s. In case of any complaints regarding approval of building plan or issuance of Completion Certificate, the matter should be brought to the notice of Housing Directorate.