Analysis On RFPs RFP Details

RFP no. 1 Project name Phase 1 A work for academic building ,hostel building ,faculty and staff housing ,indoor sports center ,ancillary building along with external development and all engineering services The international ship repair facility project at cochin port trust widening & strengthening and rehabilitation works of various roads in Gujarat state highway project II Projects implemented under Rajiv Awas Yojana (RAY) The proposed Kolkata environmental improvement investment program Publishing date Source of Advert.

9th july 2013

Times Of India

30th march 2013

Times Of India

16th febraury 2013

Times Of India

6th May 2013

Times Of India

29th April 2013

Times Of India

Depth of Information
Amongst the RFPs that I have used for the assignment The proposed Kolkata environmental improvement investment programme was the one containing maximum relevant information which was missing the most in The international ship repair facility project at cochin port trust And Phase 1 A work for academic building ,hostel building ,faculty and staff housing ,indoor sports center ,ancillary building along with external development and all engineering services

Points like Tentative commencement date, Anticipated completion date , Duration of assignment,
Selection method Type of consultants and the project Funded by were not mentioned in any RFP other than Kolkata environmental improvement investment programme. The only point not mentioned in it was about the pre bid meeting and time provided for downloading EOI (which was not mentioned).

Estimated Project Cost :


The estimated project cost again was missing in 3 out of the 5 RFPs which was again a point of concern ,since a consultant can not decide the amount to be submitted along with proposal for the certain project

Time Provided For Submitting EOI :


On an average 25-30 days are given for submission of the EOI which was quite similar in all the projects.

Time Provided For Submitting EOI (days)


40 35

Number of days

30 25 20 15 10 5 0 Phase 1 A work for The international ship widening & Projects implemented The proposed kolkata academic building repair facility project at strengthening and under Rajiv Awas Yojana environmental ,hostel building ,faculty cochin port trust rehabilitation works of (RAY) improvement and staff housing ,indoor various roads in Gujarat investment programme. sports center ,ancillary state highway project II building along with external development and all engineering services

Projects

Advertised by :
Different projects are advertised by different ranking officers ranking from Chief engineer to Project director to general manager in the RFPs that I have studied ,which is usually the highest ranking officer of the firm.

Conclusion : Amongst all the RFPs the one funded by Asian development bank has been the one which provide maximum information at advertisement level ,while others show the deficiency at the advertisement level itself. if I have to bid for these projects I might not choose to bid for the other projects since no tentative dates or the estimated cost is provided, which may cause a lot of misunderstanding in identifying the scope of work at a later stage. Also if these is the level of deficiency at this stage, one can only imagine how deficient it can get as the project proceeds.