Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

PROJECT QUALITY CONTROL FORM QCF307 CLIENT PROJ. NO.

: : :

DUNG QUAT REFINERY (DQR) PROJECT VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) 8474L

POST WELD HEAT TREATMENT (PWHT) REPORT

REPORT NO:SITE / LOCATION P.O. / REQUEST NO. CLIENT SPECIFICATION LINE / DWG / COMPONENT REMARKS UNRESTRICTED HEATING RATE UP TO CONTROLLED HEATING RATE (MAX) SOAK TEMPERATURE SOAK PERIOD (MINIMUM) CONTROLLED COOLING RATE (MAX) UNRESTRICTED COOLING RATE FROM INSULATION REMOVAL AT C C C/h C min C/h C C REFERENCE CODE PROCEDURE NO. ITEM DESCRIPTION TEST DATE : ADDITIONAL REQUIREMENTS CONTROLLER NO. TEST CERTIFICATE NO. CHART NO. RECORDER NO.

SHEET

CALIBRATION CERTIFICATE NO.

PROCESS SPECIFICATION ACCEPTED PRIOR TO SWITCH ON BY SIGNED NAME TITLE


SUPPORTSADDLE / REINF/ WEARPAD ATTACHMENT BUTT JOINT TEE JOINT

DATE
WELD NECKFLG

CHART RECEIPT
LINE/SPOOL/ITEM NO. WELD NO. DIA SCH/WT

REMARKS IDENTIFY IF OTHER TYPE

SUBCONTRACTOR COMPANY SIGNATURE NAME DATE

CONTRACTOR

CLIENT

/var/www/apps/conversion/tmp/scratch_3/171044823.doc

You might also like